Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Firstenergy - NRC-2018-0040". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20076E190  + (First Supplemental Response to First Document Production Request.Certificate of Svc Encl.Related Correspondence)
  • ML19242C701  + (First Supplemental Response to Houston Lighting & Power 790209 Second Set of Interrogatories & Requests for Production of Documents.Certificate of Svc Encl)
  • ML20115J478  + (First Supplemental Response to Joint Intervenors First Set of Interrogatories & Request for Production of Documents. Certificate of Svc Encl.Related Correspondence)
  • ML20128G983  + (First Supplemental Response to Joint Intervenors Third Set of Interrogatories & Request for Production of Documents. Certificate of Svc Encl.Related Correspondence)
  • ML20215M990  + (First Supplemental Response to NRC First Set of Interrogatories Re Suspension of R Parks Employment at Facility Site.W/Certificate of Svc.Related Correspondence)
  • ML20099D256  + (First Supplemental Response to Prairie Alliance First Round of Discovery.Certificate of Svc Encl.Related Correspondence)
  • ML20078E133  + (First Supplemental Response to Third Set of Interrogatories. Certificate of Svc Encl.Related Correspondence)
  • ML19242C694  + (First Supplemental Response to Tx Utils Generating Co 790209 First Set of Interrogatories & Request for Production of Documents.Certificate of Svc Encl)
  • ML20080M721  + (First Supplemental Responses to Interrogatories. Certification of Counsel & Certificate of Svc Encl.Related Correspondence)
  • ML20065Q043  + (First Supplementary Answers to Interrogatories.Certificate of Svc Encl)
  • ML20054L317  + (First Tendon Surveillance, Preliminary Rept)
  • ML21160A247  + (First Town Hall Meeting on Vendor Oversight - NRCs Updated Recognition of the ILAC Accreditation Process)
  • ML19260C952  + (First Two Pages of Response to NRC 791025 Request for Comments on Jurisdictional & Procedural Issues Re Export of Nuclear Reactor.Exports Must Avoid Dangerous Accidents That Could Harm Us Foreign Relations)
  • ML20095F033  + (First Two Yrs:Rept to Court & Public. Related Info Encl)
  • ML12003A104  + (First Update to Mandatory Disclosures Pursuant to 10 C. F. R. 2.336; Firstenergy Nuclear Operating Co., License Renewal for Davis-Besse Nuclear Power Station, Docket No. 50-346)
  • ML22215A184  + (First Use Notification of NRC Approved Cask RT-100)
  • ML23033A505  + (First Use Notification of NRC Approved Cask RT-100)
  • PNP 2025-060, First Use Registration of NRC Approved Package  + (First Use Registration of NRC Approved Package)
  • ML15215A362  + (First Use Report for Startup Test Activity Reduction (STAR) Program)
  • ML101400433  + (First Version of Nj Regs Before They Were Spell Checked and Corrected)
  • ML19210A142  + (First Year Operation Rept,TMI-1, Ending 750902)
  • ML053620208  + (First and Second Quarter 2005 Sampling Events Semi-Annual Groundwater Monitoring Report)
  • ML19309A703  + (First of Set of Interrogatories.Interrogatories Limited to Contention 8 Re Emergency Planning & Preparedness. Certificate of Svc Encl)
  • ML19309A704  + (First of Set of Interrogatories.Interrogatories Limited to Contention 8 Re Emergency Planning & Preparedness. Certificate of Svc Encl)
  • ML20197C601  + (First quarter(780601-780831)progress Rept Re Joint Study on Surface Transp of Radioactive Matls W/In Il W/Info Obtained from Surveillance Stops,Radiat Readings,Shipping Papers & Labeling Observations)
  • L-03-039, Firstenergy - Retrospective Premium Guarantee  + (Firstenergy - Retrospective Premium Guarantee)
  • ML20248K599  + (Firstenergy 1997 Annual Rept & Financial Repts)
  • ML051450526  + (Firstenergy 2004 Annual Report, Building on Our Progress)
  • ML032410158  + (Firstenergy 50.54(f) Design Basis Information Letter Responses Summary (1 Page))
  • ML042990331  + (Firstenergy Announces Management Change)
  • ML041211010  + (Firstenergy Announces Management Changes)
  • ML040210518  + (Firstenergy Announces Management Changes)
  • ML040210514  + (Firstenergy Announces Management Changes)
  • ML040210512  + (Firstenergy Announces Management Changes)
  • ML22304A122  + (Firstenergy Beaver Valley Caoa)
  • ML021210594  + (Firstenergy Corp Annual Report from Randy Scilla Retrospective Premium Guarantee)
  • L-02-031, Firstenergy Corp, Retrospective Premium Guarantee  + (Firstenergy Corp, Retrospective Premium Guarantee)
  • ML18065A183  + (Firstenergy Corporation - Certificate of Liability Insurance)
  • L-03-045, Firstenergy Corporation Retrospective Premium Guarantee  + (Firstenergy Corporation Retrospective Premium Guarantee)
  • ML042090298  + (Firstenergy Names Executive Vice-President and Chief Operating Officer)
  • ML12097A216  + (Firstenergy Notification of Filing Related to Proposed Shield Building Cracking Contention)
  • L-12-379, Firstenergy Nuclear Cos Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)  + (Firstenergy Nuclear Cos Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049))
  • ML020430408  + (Firstenergy Nuclear Operating Co Estimates of Licensing Action Requests for the Davis-Besse Nuclear Power Station Through NRC Fiscal Year 2003)
  • ML050270419  + (Firstenergy Nuclear Operating Co Letter Waste Shipment Receipt Not Received within Twenty Days of Shipment Perry Nuclear Power Plant)
  • ML041800157  + (Firstenergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1) - NRC Staff Response to Petitioners Appeal of Memorandum and Order Denying Intervention)
  • ML030240424  + (Firstenergy Nuclear Operating Co. (Fenoc)/ Evaluations Performed at Davis-Besse to Address USNRC Inspection Manual Chapter 0350, Item No. 1, Adequacy of Root Cause Determination/ Letter, Attachment 1, Page 365 - 574)
  • ML030240440  + (Firstenergy Nuclear Operating Co. (Fenoc)/ Evaluations Performed at Davis-Besse to Address USNRC Inspection Manual Chapter 0350, Item No. 1, Adequacy of Root Cause Determination/ Letter, Attachment 2)
  • ML030240408  + (Firstenergy Nuclear Operating Co. (Fenoc)/ Evaluations Performed at Davis-Besse to Address USNRC Inspection Manual Chapter 0350, Item No. 1, Adequacy of Root Cause Determination/ Letter, Enclosure 4, Table of Contents - Attachment 1)
  • ML030240482  + (Firstenergy Nuclear Operating Co. (Fenoc)/ Evaluations Performed at Davis-Besse to Address USNRC Inspection Manual Chapter 0350, Item No. 1, Adequacy of Root Cause Determination/ Letter)
  • ML030240420  + (Firstenergy Nuclear Operating Co. (Fenoc)/ Evaluations Performed at Davis-Besse to Address USNRC Inspection Manual Chapter 0350, Item No. 1, Adequacy of Root Cause Determination/ Letter, Attachment 1, Page 158 - 364)