ML032410158

From kanterella
Jump to navigation Jump to search
Firstenergy 50.54(f) Design Basis Information Letter Responses Summary (1 Page)
ML032410158
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/07/2003
From:
FirstEnergy Corp
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0376
Download: ML032410158 (1)


Text

Jon Hopkins - Slide 34.ppt. Page 1 Firsffinerg 50.54(f) Design Basis Information Letter Responses Summary

  • DBV Program was completed to the extent defined in the responses (i.e., placed into a tracking system)
  • Follow-up items have been dispositioned or placed in the Corrective Action Program
  • DBV Program provided significant value relative to the documented review of the design bases
  • SHRR, LIR, and SFVP have substantiated e designbasis was adequate to support operability .
  • Capture the results of current reviews ,'anid subifit50.54(f)

Design Basis Information supplementalfletter to NRC MI, M.

SO I