ML050270419

From kanterella
Jump to navigation Jump to search
Firstenergy Nuclear Operating Co Letter Waste Shipment Receipt Not Received within Twenty Days of Shipment Perry Nuclear Power Plant
ML050270419
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/14/2005
From: Richard Anderson
FirstEnergy Nuclear Operating Co
To: Caldwell J
Region 3 Administrator
References
PY-CEI/OIE-0636L
Download: ML050270419 (1)


Text

FENOC -

FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road Perrx Ohio 44081 Richard Anderson Vice President-Nuclear 440-280-5579 Fax: 440-280-802g January 14,2005 PY-CEVOI E-0636L Mr. James Caldwell Regional Administrator, Region Ill United States Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 0 Lisle, Illinois 60532-4352

Subject:

Waste Shipment Receipt Not Received Within Twenty Days of Shipment Perry Nuclear Power Plant, Docket No. 50-440

Dear Mr. Caldwell:

On November 19,2004 the Perry Nuclear Power Plant (PNPP) shipped two twenty foot Sealands of radioactive waste. One Sealand contained Dry Active Waste and the second contained Green is Clean waste. Both containers were shipped to Duratek Inc.

of Oak Ridge, Tennessee.

Subsequently, on December 30,2004 it was determined that the PNPP had not received the twenty day notification of waste receipt as required by 10 CFR 20, Appendix G, Section I l l, Control and Tracking, Paragraph E.I. In accordance with this regulation, an investigation was commenced which included a trace of the shipment. Upon identification, this condition was entered in the PNPPs Corrective Action Program.

Duratek was contacted and on January 3, 2005 provided a fax, which confirmed that the shipment was received at their facility on November 22, 2004. Duratek stated that a receipt acknowledgement was sent to the PNPP on November 22,2004. It appears that this receipt was not received on the PNPP site.

The investigation found that the individual normally responsible for this task was unavailable. His replacement was performing this function on a part-time basis, which allowed the twenty-day receipt requirement to be exceeded. The PNPP staff believes that the mailed acknowledgement most likely was lost in the holiday mail.

This letter is submitted as the required report specified in 10 CFR 20, Appendix G, Section I l l, Paragraph E.1.

If you have any additional questions or require further assistance, please contact Jeffrey Lausberg, Manager - Regulatory Compliance at (440) 280-5940.

cc: Document Control Desk Resident Inspector