Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000387/FIN-2012002-05 + (Failure to Follow Radiation Protection Procedures)
- 05000387/FIN-2012003-05 + (Failure to Follow Radiation Protection Procedures)
- 05000482/FIN-2012004-04 + (Failure to Follow Radiation Protection Procedures)
- 05000247/FIN-2009002-07 + (Failure to Follow Radiation Protection Procedures)
- 05000286/FIN-2009002-01 + (Failure to Follow Radiation Protection Procedures)
- 05000397/FIN-2009005-02 + (Failure to Follow Radiation Protection Requirements)
- 05000483/FIN-2012004-02 + (Failure to Follow Radiation Work Permit Instructions)
- 05000285/FIN-2011005-03 + (Failure to Follow Radiation Work Permit Instructions)
- 05000458/FIN-2010003-03 + (Failure to Follow Radiation Work Permit Instructions)
- 05000482/FIN-2011002-11 + (Failure to Follow Radiation Work Permit Instructions)
- 05000285/FIN-2011003-03 + (Failure to Follow Radiation Work Permit Procedure)
- 05000298/FIN-2011003-05 + (Failure to Follow Radiation Work Permit Requirements)
- 05000298/FIN-2012002-06 + (Failure to Follow Radiation Work Permit Requirements)
- 05000298/FIN-2012003-09 + (Failure to Follow Radiation Work Permit Requirements)
- 05000285/FIN-2012011-02 + (Failure to Follow Radiation Work Permit Requirements)
- 05000285/FIN-2010004-06 + (Failure to Follow Radiation Work Permit Requirements)
- 05000298/FIN-2009005-09 + (Failure to Follow Radiation Work Permit Requirements in Two Instances)
- 05000397/FIN-2012004-09 + (Failure to Follow Radiation Work Permit Requirements to Inform Workers about Radiological Conditions)
- 05000445/FIN-2011005-05 + (Failure to Follow Radiological Work Permit Requirements)
- 05000397/FIN-2018003-01 + (Failure to Follow Radiologically Controlled Area Procedures)
- 05000263/FIN-2014004-01 + (Failure to Follow Reactivity Management Procedure)
- 05000335/FIN-2012002-01 + (Failure to Follow Reactor Protection System Surveillance Procedure Resulting in Reactor Plant Trip)
- 05000335/FIN-2015003-04 + (Failure to Follow Reactor Protection System Surveillance Procedure Resulting in Reactor Plant Trip)
- 05000498/FIN-2011002-04 + (Failure to Follow Reactor Protection System Procedure Results in Automatic Reactor Trip)
- 05000458/FIN-2008002-04 + (Failure to Follow Reactor Startup Procedure Results in Six Control Rod Withdrawal Errors (Section 4OA2))
- 05000305/FIN-2010005-04 + (Failure to Follow Red Channel Instrument Test Procedure)
- 05000389/FIN-2014007-03 + (Failure to Follow Refueling Operations Procedure Resulting in a Fuel Mishandling Event)
- 05000416/FIN-2011003-02 + (Failure to Follow Scaffold Control Procedure)
- 05000298/FIN-2008002-01 + (Failure to Follow Scaffold Inspection Procedures)
- 05000354/FIN-2010004-01 + (Failure to Follow Scaffold Procedure)
- 05000390/FIN-2012004-02 + (Failure to Follow Scaffold Procedure Threatens ERCW Pump Operability)
- 05000298/FIN-2009004-01 + (Failure to Follow Scaffold Procedure Threatens Fire Protection Equipment)
- 05000285/FIN-2011003-02 + (Failure to Follow Scaffolding Procedure)
- 05000280/FIN-2011004-01 + (Failure to Follow Scaffolding Procedure Requirements)
- 05000400/FIN-2018002-05 + (Failure to Follow Secondary Water Chemistry Plan for Elevated Levels of Secondary Water Impurities)
- 05000298/FIN-2014003-03 + (Failure to Follow Seismic Housekeeping Requirements for Scaffolding)
- 05000335/FIN-2014007-02 + (Failure to Follow Seismic Restraining Procedures on Ladders Located Near Safety-Related Equipment)
- 05000335/FIN-2012005-01 + (Failure to Follow Seismic Restraining Procedures on Ladders Located Near SAFETY-RELATED Equipment)
- 05000458/FIN-2012003-02 + (Failure to Follow Severe Weather Operations Procedure)
- 05000397/FIN-2012005-05 + (Failure to Follow Shutdown Cooling Isolation Logic Bypass Procedures Results in Loss of Safety Function)
- ENS 47723 + (Failure to Follow Site Fitness for Duty Procedures)
- 05000247/FIN-2008003-01 + (Failure to Follow Site Procurement Procedure for EDG Temperature Control Valve Elements)
- 05000498/FIN-2011004-01 + (Failure to Follow Standby Diesel Generator Maintenance Procedures)
- 05000280/FIN-2008002-02 + (Failure to Follow Start-up Procedure which resulted in Leaving Loose Fibrous Insulation in Containment)
- 05000220/FIN-2009003-01 + (Failure to Follow Startup Procedure for Second Stage Reheaters Leads to Turbine Trip)
- 05000458/FIN-2017001-01 + (Failure to Follow Station Guidance on Control of Scaffolding)
- 05000364/FIN-2010005-01 + (Failure to Follow Station Guidance on Use of Extension Cords and Placement of Equipment in Safety-Related Cable Trays)
- 05000458/FIN-2016002-01 + (Failure to Follow Station Guidance on Use of Temporary Power Cables and Control of Transient Combustibles)
- 05000313/FIN-2009003-02 + (Failure to Follow Station Planning Procedure Results in an Inadequate Work Instructions)
- 05000298/FIN-2012002-08 + (Failure to Follow Station Procedure Results in Inadequate Work Instructions)
- 05000482/FIN-2013003-01 + (Failure to Follow Station Procedures)