05000298/FIN-2011004-01 | 2011Q3 | H.7 | Failure to Place the Essential Service Water System Strainers in (a)(1) |
05000298/FIN-2011004-02 | 2011Q3 | | Failure to Scope Reactor Building Drain Components and Steam Exclusion Doors that Affect Safety-related Systems in the Maintenance Rule Monitoring Program |
05000298/FIN-2011004-03 | 2011Q3 | H.8 | Failure to Assess and Manage Risk for Maintenance Near Electrical Towers That Could Impact Initiating Events |
05000298/FIN-2011004-04 | 2011Q3 | P.3 | Failure to Assess and Manage Risk for Maintenance Near an Operating Reactor Feed Pump That Could Impact Initiating Events |
05000298/FIN-2011004-05 | 2011Q3 | H.12 | Failure to Follow Procedure Results in Personnel Contamination |
05000298/FIN-2011004-06 | 2011Q3 | P.2 | Failure to Identify, Correct, and Prevent Recurrence of a Significant Condition Adverse to Quality |
05000298/FIN-2011004-07 | 2011Q3 | | Inadequate Procedure Results in Inoperable Essential Pump |
05000298/FIN-2011005-07 | 2011Q4 | H.14 | Failure to Perform Required 10 CFR 50.59 Evaluations for Changes |
05000298/FIN-2011005-04 | 2011Q4 | | Failure to Provide Complete and Accurate Solid Radwaste Shipment Information in Annual Reports |
05000298/FIN-2011202-02 | 2011Q4 | | Security |
05000298/FIN-2011005-06 | 2011Q4 | P.2 | Failure to Correctly Translate Design Requirements into Installed Plant Configuration |
05000298/FIN-2011005-05 | 2011Q4 | P.1 | Failure to Identify Deficient Performance During a Single-Facility Drill |
05000298/FIN-2011005-03 | 2011Q4 | H.12 | Failure to Follow Procedures for Dose Rate Alarms Received by Two Individuals |
05000298/FIN-2011005-02 | 2011Q4 | H.2 | Failure to Maintain Control and Continuous Coverage of a Posted Locked High Radiation Area |
05000298/FIN-2011005-01 | 2011Q4 | H.2 | Failure to Conspicuously Post a High Radiation Area |
05000298/FIN-2012002-08 | 2012Q1 | H.2 | Failure to Follow Station Procedure Results in Inadequate Work Instructions |
05000298/FIN-2012002-07 | 2012Q1 | | Failure to Furnish Evidence of an Activity Affecting Quality |
05000298/FIN-2012002-06 | 2012Q1 | H.14 | Failure to Follow Radiation Work Permit Requirements |
05000298/FIN-2012002-05 | 2012Q1 | H.7 | Unevaluated Pre-conditioning for Core Spray Motor-operated Valves prior to Conducting As Found In-service Surveillance Testing |
05000298/FIN-2012002-03 | 2012Q1 | H.12 | Failure to Appropriately Manage Risk for Maintenance in the Stations Switchyard |
05000298/FIN-2012002-02 | 2012Q1 | P.2 | Failure to Scope Required Components in the Stations Maintenance Rule Monitoring Program |
05000298/FIN-2012002-01 | 2012Q1 | P.2 | Failure to Maintain Design Control for Internal Flooding |
05000298/FIN-2012002-04 | 2012Q1 | | Failure to Maintain Design Control of Standby Liquid Control System |
05000298/FIN-2012404-02 | 2012Q2 | H.7 | Security |
05000298/FIN-2012404-01 | 2012Q2 | H.14 | Security |
05000298/FIN-2012007-06 | 2012Q2 | P.2 | Failure to Incorporate all Design and Technical Data Available into the Operability Determinations for the Standby Liquid Control Tank and Test Tank |
05000298/FIN-2012007-05 | 2012Q2 | P.3 | Failure to Have an Adequate Procedure for Erecting Flood Barriers |
05000298/FIN-2012007-04 | 2012Q2 | | Failure to Establish a Preventative MaintenanceProgram for Molded Case Circuit Breakers |
05000298/FIN-2012007-03 | 2012Q2 | | Failure to Address the Design Bases of the Battery Chargers Following Identification of an Undersized Fused Disconnect Switch Connecting the Swing Battery Chargers to the Direct Current (DC) Buses |
05000298/FIN-2012007-02 | 2012Q2 | H.14 | Failure to Provide Adequate Resistance Values for the Preventative Maintenance of the Non-Segregated Phase Bus Duct |
05000298/FIN-2012007-01 | 2012Q2 | H.2 | Failure to Adequately Analyze Seismic Requirements for Service Water instrument Rack |
05000298/FIN-2012003-14 | 2012Q2 | H.14 | Failure to Use Design-Basis Parameter Values in Design-Related Calculations |
05000298/FIN-2012003-13 | 2012Q2 | H.14 | Fail to Correct a Condition Adverse to Quality for Determining the Number of Multiply Starts for a Single Diesel Generator Starting Air Accumulator |
05000298/FIN-2012003-12 | 2012Q2 | H.14 | Failure to Maintain Design Control of the Essential Ventilation System |
05000298/FIN-2012003-11 | 2012Q2 | H.5 | ALARA Program Failed to Prevent Unintended Doses for Refueling Floor Activities, Outage RE26 |
05000298/FIN-2012003-10 | 2012Q2 | H.13 | Failure to Perform a Radiation and Contamination Survey |
05000298/FIN-2012003-09 | 2012Q2 | H.14 | Failure to Follow Radiation Work Permit Requirements |
05000298/FIN-2012003-08 | 2012Q2 | P.2 | Non-conservative Service Water Booster Pump A and D Differential Pressure Operability Limits During In-Service Surveillance Testing |
05000298/FIN-2012003-07 | 2012Q2 | H.14 | Failure to Evaluate Changes for Adverse Impacts |
05000298/FIN-2012003-06 | 2012Q2 | H.8 | Design Changes Not Appropriately Approved by the Licensee |
05000298/FIN-2012003-05 | 2012Q2 | | Failure to Furnish Evidence of an Activity Affecting Quality |
05000298/FIN-2012003-04 | 2012Q2 | P.2 | Failure to Maintain Design Control of the Standby Liquid Control System and Sumps Credited in the Internal Flooding Analysis |
05000298/FIN-2012003-03 | 2012Q2 | H.14 | Failure to Recognize the Need for An Evaluation and to Properly Document the Bases for Operability |
05000298/FIN-2012003-02 | 2012Q2 | H.14 | Failure to Ensure Compliance with the Requirements of Station Troubleshooting Procedure |
05000298/FIN-2012003-01 | 2012Q2 | H.7 | Failure to Perform Adequate Postmaintenance Testing |