Browse wiki

Jump to navigation Jump to search
An NRC-identified Green NCV of TS 6.8.4.c,An NRC-identified Green NCV of TS 6.8.4.c, Secondary Water Chemistry, was identified for the licensees failure to follow secondary water chemistry control requirements in accordance with procedure CSD-CP-HNP-0002, Harris Secondary Water Chemistry Strategic Plan. . Specifically, the licensee remained at 100% power for approximately 10 hours after entering secondary water chemistry Action Level 3 due to elevated chlorine and sulfates chemical impurity concentrations, which was contrary to the procedure requirements to downpower the unit to below 5% power as quickly as safe plant operation permits. This unit downpower delay allowed additional time for the chemical impurities to adversely affect the steam generators. to adversely affect the steam generators.  +
23:59:59, 30 June 2018  +
05000400  +
23:59:59, 30 June 2018  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
1.157407e-4 d (0.00278 hours, 1.653439e-5 weeks, 3.805e-6 months)  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:35:36, 10 September 2018  +
23:59:59, 30 June 2018  +
Failure to Follow Secondary Water Chemistry Plan for Elevated Levels of Secondary Water Impurities  +