List of results
- 05000482/FIN-2011002-04 + (Failure to Follow 10 CFR 50.65 a(2) for Main Control Board Annunciator Power Supply Failures)
- 05000482/FIN-2012004-05 + (Failure to Follow ALARA Planning Procedures)
- 05000482/FIN-2011004-03 + (Failure to Follow ASME Code Case OMN-1 for Butterfly Valves)
- 05000498/FIN-2012003-01 + (Failure to Follow ASME Code Requirements)
- 05000298/FIN-2016001-01 + (Failure to Follow ASME Code Requirements when taking Corrective Actions for a Pump in the Required Action Range)
- 05000285/FIN-2013008-34 + (Failure to Follow ASME Code Requirements When Establishing New Pump Reference Values as Corrective Actions)
- 05000416/FIN-2018002-02 + (Failure to Follow ASME Requirements for Maintaining Inservice Inspection (ISI) Cycles and Perform ASME Required Inservice Inspections within the Scheduled ISI Cycle)
- 05000413/FIN-2017004-03 + (Failure to Follow Administrative Procedures)
- 05000416/FIN-2013004-07 + (Failure to Follow Alarm Response Steps to Restore the TSE Following Maintenance)
- 05000341/FIN-2016001-08 + (Failure to Follow Apparent Cause Evaluation Procedure)
- 05000382/FIN-2011004-07 + (Failure to Follow Apparent Cause Evaluation Process Procedure)
- 05000461/FIN-2008002-01 + (Failure to Follow Approved Fire Protection Program Procedures Concerning Control of Transient Combustible Material)
- 05000285/FIN-2009004-04 + (Failure to Follow Auxiliary Building Crane Operating Instructions)
- 05000361/FIN-2012003-05 + (Failure to Follow Battery Testing Procedure for Battery Exceeding 85% Service Life)
- 05000354/FIN-2015004-01 + (Failure to Follow CAP Procedures to Ensure Functionality of the Main Control Room during a Station Blackout)
- 05000327/FIN-2008002-02 + (Failure to Follow Calibration Procedure (Section 1R22))
- 05000247/FIN-2008003-06 + (Failure to Follow Camera Controls Procedure Resulting in RFI Induced MBFP Runback and Subsequent Manual Reactor Trip)
- 05000397/FIN-2011008-01 + (Failure to Follow Clearance Order Instructions)
- 05000254/FIN-2013002-01 + (Failure to Follow Clearance Order Instructions)
- 05000254/FIN-2012002-01 + (Failure to Follow Clearance Order Instructions)
- 05000445/FIN-2018001-01 + (Failure to Follow Commercial Grade Dedication Process)
- 05000382/FIN-2009002-01 + (Failure to Follow Commitment Tracking Procedures)
- 05000313/FIN-2011003-01 + (Failure to Follow Compliance Work Order for Corrective Maintenance on Safety Related Equipment)
- 05000387/FIN-2010006-03 + (Failure to Follow Condition Report Process for Overdue Actions)
- 05000260/FIN-2016012-01 + (Failure to Follow Conduct of Operation Procedure)
- 05000529/FIN-2017003-03 + (Failure to Follow Conduct of Operations Procedure)
- 05000220/FIN-2013003-01 + (Failure to Follow Containment Isolation System Surveillance Procedure Resulting in Isolation of the Reactor Coolant Isolation Cooling System)
- 05000293/FIN-2011008-01 + (Failure to Follow Corrective Action Process for HPCI Diaphragm Degraded Condition)
- 05000482/FIN-2009005-06 + (Failure to Follow Corrective Action Procedure)
- 05000255/FIN-2013003-02 + (Failure to Follow Corrective Action Process for Service Water Leaks)
- 05000528/FIN-2011002-02 + (Failure to Follow Corrective Action Program Procedure)
- 05000528/FIN-2012002-01 + (Failure to Follow Corrective Action Program Procedure)
- 05000456/FIN-2012007-04 + (Failure to Follow Corrective Action Program Procedure)
- 05000397/FIN-2015001-03 + (Failure to Follow Corrective Action Program Procedures)
- 05000397/FIN-2013003-02 + (Failure to Follow Corrective Action Program Procedures)
- 05000327/FIN-2012002-03 + (Failure to Follow Corrective Action Program Procedures)
- 05000361/FIN-2009004-03 + (Failure to Follow Corrective Action process for an Inadequate Postmaintenance Test)
- 05000361/FIN-2012003-04 + (Failure to Follow Design Control Procedures)
- 05000368/FIN-2016001-02 + (Failure to Follow Design Control Requirements for Pump Seal Cooler Replacements)
- 05000323/FIN-2009009-01 + (Failure to Follow Design and Configuration Control Requirements)
- 05000445/FIN-2008004-02 + (Failure to Follow Diesel Generator Test Procedure)
- 05000400/FIN-2015008-02 + (Failure to Follow EPM-410 Procedure)
- 05000397/FIN-2011005-04 + (Failure to Follow Earthquake Abnormal Procedure)
- 05000301/FIN-2016001-01 + (Failure to Follow Electrical Safety Procedures Results in Plant Transient)
- 05000324/FIN-2014005-02 + (Failure to Follow Emergency Diesel Generator No. 3 Monthly Load Test Surveillance Procedure)
- 05000327/FIN-2009004-01 + (Failure to Follow Emergency Diesel Generator Operating Procedure)
- 05000263/FIN-2011004-02 + (Failure to Follow Emergency Diesel Generator Quarterly Surveillance Procedure)
- 05000275/FIN-2009004-03 + (Failure to Follow Emergency Operating Procedures Following a Reactor Trip)
- 05000261/FIN-2015002-02 + (Failure to Follow Engineering Change Procedure for Modification of RPS)
- 05000321/FIN-2008002-02 + (Failure to Follow Equipment Clearance Procedures Results in Control Room Ventilation Inoperability)
- 05000395/FIN-2014007-02 + (Failure to Follow Failure to Follow Corrective Action Program Procedures)