Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13009A375 + (Enclosure B to L-12-444, Calculation No. 32-9195651-000, Equivalent Margins Assessment of Davis-Besse Transition Welds for 52 EFPY - Non-Proprietary)
- L-13-138, Enclosure B to L-13-138, Offsite Dose Calculation Manual, Revision 20 and Enclosure C, Process Control Program, Revision 12 + (Enclosure B to L-13-138, Offsite Dose Calculation Manual, Revision 20 and Enclosure C, Process Control Program, Revision 12)
- ML17086A032 + (Enclosure B to L-17-105, Areva Report ANP-3542NP, Revision 1, Time-Limited Aging Analysis (TLAA) Regarding Reactor Vessel Internals Loss of Ductility at 60 Years)
- ML043570383 + (Enclosure B to NL-04-156, Engineering Standards Manual IES-3B, Rev 0, Instrument Loop Accuracy and Setpoint Calculation Methodology (P3))
- ML15299A146 + (Enclosure B, Bechtel Report No. 25593-000-G83-GEG-00016-000, Effect of Laminar Cracks on Splice Capacity of No. 11 Bars Based on Testing Conducted at Purdue University and University of Kansas for Davis-Besse Shield Building. Part 2 of 7)
- ML15299A149 + (Enclosure B, Bechtel Report No. 25593-000-G83-GEG-00016-000, Effect of Laminar Cracks on Splice Capacity of No. 11 Bars Based on Testing Conducted at Purdue University and University of Kansas for Davis-Besse Shield Building. Part 5 of 7)
- ML15299A150 + (Enclosure B, Bechtel Report No. 25593-000-G83-GEG-00016-000, Effect of Laminar Cracks on Splice Capacity of No. 11 Bars Based on Testing Conducted at Purdue University and University of Kansas for Davis-Besse Shield Building. Part 6 of 7)
- ML15299A147 + (Enclosure B, Bechtel Report No. 25593-000-G83-GEG-00016-000, Effect of Laminar Cracks on Splice Capacity of No. 11 Bars Based on Testing Conducted at Purdue University and University of Kansas for Davis-Besse Shield Building. Part 3 of 7)
- ML15299A148 + (Enclosure B, Bechtel Report No. 25593-000-G83-GEG-00016-000, Effect of Laminar Cracks on Splice Capacity of No. 11 Bars Based on Testing Conducted at Purdue University and University of Kansas for Davis-Besse Shield Building. Part 4 of 7)
- ML15299A144 + (Enclosure B, Bechtel Report No. 25593-000-G83-GEG-00016-000, Effect of Laminar Cracks on Splice Capacity of No. 11 Bars Based on Testing Conducted at Purdue University and University of Kansas for Davis-Besse Shield Building. Part 1 of 7)
- L-15-328, Enclosure B, Bechtel Report No. 25593-000-G83-GEG-00016-000, Effect of Laminar Cracks on Splice Capacity of No. 11 Bars Based on Testing Conducted at Purdue University and University of Kansas for Davis-Besse Shield Building. Part 7 of 7 + (Enclosure B, Bechtel Report No. 25593-000-G83-GEG-00016-000, Effect of Laminar Cracks on Splice Capacity of No. 11 Bars Based on Testing Conducted at Purdue University and University of Kansas for Davis-Besse Shield Building. Part 7 of 7)
- RS-24-118, Enclosure B, License Renewal Commitment List Update + (Enclosure B, License Renewal Commitment List Update)
- L-12-167, Enclosure B, Offsite Dose Calculation Manual, Revision 18 and Enclosure C, Process Control Program, Revision 12 + (Enclosure B, Offsite Dose Calculation Manual, Revision 18 and Enclosure C, Process Control Program, Revision 12)
- ML091260221 + (Enclosure B, Offsite Dose Calculation Manual, Revision 17)
- ML053110427 + (Enclosure B, Section 6.0, Emergency Measures, of the Perry Emergency Plan, Page 6-3 of the Perry Evacuation Time Estimate Study Perry Operations Manual Emergency Plan Implementing Instruction, Protective Actions & Guides, Dated December 8,)
- ML13151A059 + (Enclosure B, WCAP-15571, Analysis of Capsule Y from Beaver Valley, Unit 1 Reactor Vessel Radiation Surveillance Program, Supplement 1, Revision 2, Dated September 2011)
- ML24101A277 + (Enclosure B: Beaver Valley Power Station, Unit 2 - Responses to Request for Additional Information - Refueling Outage 23 Steam Generator 180 Day Report)
- ML17213A017 + (Enclosure B: Beaver Valley, Unit 2, Seismic Probabilistic Risk Assessment in Response to 50.54(0 Letter with Regard to NTTF 2.1)
- ML24269A060 + (Enclosure B: Davis-Besse Nuclear Power Station, Unit 1, Updated Final Safety Analysis Report, Revision 35)
- RS-25-030, Enclosure B: Dresden Nuclear Power Station, Units 2 and 3, Subsequent License Renewal Application - Commitment List Update + (Enclosure B: Dresden Nuclear Power Station, Units 2 and 3, Subsequent License Renewal Application - Commitment List Update)
- RS-25-049, Enclosure B: Dresden Nuclear Power Station, Units 2 and 3, Subsequent License Renewal Application Updates Resulting from RAI Responses + (Enclosure B: Dresden Nuclear Power Station, Units 2 and 3, Subsequent License Renewal Application Updates Resulting from RAI Responses)
- RS-25-014, Enclosure B: GE Hitachi Nuclear Energy Americas, LLC 10 CFR 2.390 Affidavit + (Enclosure B: GE Hitachi Nuclear Energy Americas, LLC 10 CFR 2.390 Affidavit)
- ML25128A187 + (Enclosure B: Subsequent License Renewal Application Updates Resulting from RAI Responses)
- ML19078A044 + (Enclosure Baffle-Former Bolt Guidance Report)
- ML18164A085 + (Enclosure Briefing Material)
- RS-14-223, Enclosure C - Application for Withholding Proprietary Information from Public Disclosure Supporting the Following Set 31 RAI Response RAI 4.3.4-3a + (Enclosure C - Application for Withholding Proprietary Information from Public Disclosure Supporting the Following Set 31 RAI Response RAI 4.3.4-3a)
- ML11227A196 + (Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab Am 1 Through a 7))
- L-11-165, Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30) + (Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30))
- ML11193A104 + (Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab H 17 to Tab C 2))
- ML11193A133 + (Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab H 1 Through Tab H 16))
- ML21106A023 + (Enclosure C - Exemption Request No. 2)
- L-23-052, Enclosure C - PNPP Technical Specification Bases, Revision 18 + (Enclosure C - PNPP Technical Specification Bases, Revision 18)
- ML051030263 + (Enclosure C&D, FPL Conference Call Summary on SL2-15 Refueling Outage (Tac No. MC5538))
- ML053260469 + (Enclosure C, Section J, Protective Response, of the Fermi II Radiological Emergency Response Plan, Fermi 2 RERP Plan Implementing Procedure, Protective Action Recommendations, Fermi 2 RERP Plan Implementing Procedure, Assembly & Accountabil)
- ML13151A060 + (Enclosure C, WCAP-16527-NP, Analysis of Capsule X from Firstenergy Nuclear Operating Company Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program, Supplement 1, Revision 1, Dated September 2011)
- ML102571448 + (Enclosure C-1 (RAI 8) Latent Debris Calculation C11928, Revision 0)
- ML22202A433 + (Enclosure C: Framatome ANP-2718NP, Rev. 7, Appendix G Pressure-Temperature Limits for 52 EFPY for the Davis-Besse Nuclear Power Station)
- ML25169A399 + (Enclosure C: Reconnaissance Level Geotechnical Investigation Report)
- RS-25-093, Enclosure C: Subsequent License Renewal Application Commitment List Update + (Enclosure C: Subsequent License Renewal Application Commitment List Update)
- ML21048A320 + (Enclosure Calendar Year 2020 Reactor Oversight Process Self-Assessment Metric Overview and Report)
- ML25064A588 + (Enclosure Calendar Year 2024 Reactor Oversight Process Self-Assessment Metric Overview and Report)
- ML20170A805 + (Enclosure Containing RAI)
- ML22263A416 + (Enclosure D - DBNPS UFSAR, Rev. 34, Drawings Incorporated by Reference (Public))
- ML053260471 + (Enclosure D, Appendix C, Population Distribution & Evacuation Time Estimates, of Palisades Nuclear Plant Site (Palisades) Emergency Plan, Palisades Emergency Implementing Procedure, Protective Action Recommendations for Offsite Populations,)
- L-22-141, Enclosure D: Affidavit of Elliott Gayle + (Enclosure D: Affidavit of Elliott Gayle)
- ML24269A062 + (Enclosure D: Davis-Besse Nuclear Power Station, Unit 1, Drawings Incorporated by Reference)
- ML22285A161 + (Enclosure DOE Revised LTSP for Title 1 Slick Rock, Colorado Disposal Site)
- ML21076A329 + (Enclosure Draft Durita Documentation of NRC Review of the Termination Findings for the Hecla Mining Company Uranium Milling License Submitted by the Colorado State Department of Public Health and Environment)
- ML22263A417 + (Enclosure E - DBNPS Unit 1, Technical Requirements Manual, Rev. 23)
- ML051030178 + (Enclosure E, FPL Conference Call Summary on SL2-15 Refueling Outage (Tac No. MC5538))