Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML100070648 + (Email Request for Additional Information Related to NRC Generic Letter 2004-02)
- ML100110380 + (Email Request for Additional Information, Round 2, Requests for Relief (RR) RBS-ISI-007, RBS-ISI-008, RBS-ISI-009, RBS-ISI-010, and RBS-ISI-011)
- ML090630549 + (Email Request for Additional Information, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New TS 3/4 9.12, Spent Fuel Pool Boron Concentration)
- ML21165A179 + (Email Request for Additional Information Westinghouse Topical Report WCAP-18124-NP-A, Rev 0, Suppl 1-P and WCAP-18124-NP-A, Rev 0, Suppl 1-NP, Fluence Determination with RAPTOR-M3G and Ferret - Supplement for Extended Beltline)
- ML13178A035 + (Email Request for Additional Information Round 3 (Afpb), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition))
- ML091970549 + (Email Request for Additional Information Regarding Requests for Relief (RR) RBS-ISI-007, RBS-ISI-008, RBS-ISI-009, RBS-ISI-010 and RBS-ISI-011)
- ML100630557 + (Email Request for Additional Information August 5, 2009 Scram with Complications at Columbia Generating Station)
- ML091180467 + (Email Request for Additional Information, Request for Alternative PRR-ANO2-2009-1, Requirements of ASME OM Code-2004 Edition for the Fourth 10-year Inservice Testing. Program)
- ML12159A094 + (Email Request for Additional Information Round 2, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition))
- ML12283A256 + (Email Request for Additional Information, Round 2, Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements Related to Diesel Generator Test Loads, Voltage, and Frequency (TAC No. ME767))
- ML11104A063 + (Email Request for Additional Information for Generic Letter 2008-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML13008A354 + (Email Request for Additional Information,License Amendment Request to Adopt NFPA 805)
- ML090930272 + (Email Request for Additional Information, Request for Alternative ANO2-PT-001)
- ML092640371 + (Email Request for Additional Information, License Amendment Request, Deviation from Fire Protection Program Requirements for Fire Area 27 (TAC ME0824 and ME0825) and Fire Area 31)
- ML110600717 + (Email Request for Additional Information, Round 2, Nrr/Dci/Cvib Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt)
- ML100270291 + (Email Request for Additional Information, Request for Exemption from Certain Requirements of Revised Fitness for Duty Rule Regarding Managing Fatigue During Severe Weather Conditions)
- ML090440496 + (Email Request for Additional Information, Emergency Plan Change to Implement NEI 99-01, Revision 5, Emergency Action Levels)
- ML111230798 + (Email Request for Additional Information, Decommissioning Funding Status Report)
- ML091600317 + (Email Request for Additional Information on Use of RCP Delta-P for CPC Flow Measurement, Re LAR to Revise TS 3.3.1.1, Reactor Protective Instrumentation, Table 4.3-1 and Notes to Modify RCS Flow Verification)
- ML102000485 + (Email Request for Additional Information, Round 3, Amendment Request to Revise Technical Specification 3.8.7, Inverters - Operating, to Extend Completion Time for Restoration of an Inoperable Inverter (TAC ME2337-ME2339))
- ML102950164 + (Email Request for Additional Information Regarding Decommissioning Funding Assurance for the RPI Reactor License Renewal)
- ML090910462 + (Email Request for Additional Information, Request to Revise TS 3.3.1.1, Reactor Protective Instrumentation, Table 4.3-1 and Associated Notes 7 and 8 to Modify Reactor Coolant System Flow Verification)
- ML102510270 + (Email Request for Additional Information, Round 2, License Amendment Request, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation, for Extension of Completion Times)
- ML120090321 + (Email Request for Additional Information Regarding the Steam Generator License Amendment Request Dated June 30, 2011, to Revise Technical Specification for Permanent Alternate Repair Criteria)
- ML21109A276 + (Email Request for Information for Columbia Generating Stations PIR Inspection_Redacted)
- ML12156A134 + (Email Request for Pre-submittal Meeting)
- ML18045A086 + (Email Request for Review of the Draft Safety Evaluation for Implementation of a Revised Emergency Plan at Vermont Yankee to Reflect an ISFSI-only Configuration)
- ML20141L513 + (Email Request for the a Version - Qapp for Sfr Metallic Fuel Data Qualification)
- ML17290A013 + (Email Requesting Examination Reschedule Date for 50-166/OL-18-01, University of Maryland)
- ML19091A077 + (Email Requesting NRC to Cease Its Review of EPRI Scaling Factors Report)
- ML17013A250 + (Email Requesting Review of Draft EA and SER for Vermont Yankee Request to NRC for Alternate Disposal of Waste)
- ML082730313 + (Email Requesting TAC Numbers for Decommissioning Trust Funds Audit for San Onofre)
- ML082670282 + (Email Requesting TAC for Financial Records Review)
- ML21351A285 + (Email Requests for Additional Information for the Westinghouse Topical Report WCAP-18546-P/NP, Westinghouse Axiom Cladding for Use in Pressurized Water Reactor Fuel)
- ML21344A076 + (Email Requests for Additional Information for the Westinghouse Topical Report WCAP-18446-P/WCAP-18446-NP, Revision 0, Incremental Extension of Burnup Limit for Westinghouse and Combustion Engineering Fuel Designs)
- ML24061A235 + (Email Resp Re in 2023-06)
- ML24285A202 + (Email Response - LTR-24-0212 - Patricia Skibbee - President C-10 Board of Directors - David Lochbaum)
- ML15057A237 + (Email Response Back to ACE Regarding Email Inquiry Titled: Risky Limerick Permanent Plant Modifications Approved After Relicensing)
- ML23082A289 + (Email Response California Dept. of Radiation Safety Review of the Draft EA for the GEH Ntr LRA)
- ML14142A241 + (Email Response Mr. Collins)
- ML25255A071 + (Email Response State of Texas - Re Follow-up Review of the Draft EA and FONSI for the STP Unit 1 and 2 ISFSI DFPs)
- ML14358A361 + (Email Response from Gavutis C-10 Foundation to Region-I, NRC, Regarding NRC Responses to Their Previous Emails Referencing Seabrook Station ASR Testing)
- ML19190A164 + (Email Response from California Dph Re_ Rancho Seco - Draft EA)
- ML24067A089 + (Email Response from Diane Curran to Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell)
- ML072500288 + (Email Response from Eric Joseph Epstein to Paul Swartz, Exec. Director for the Susquehanna River Basin Commission Regarding His August 31, 2007 Submission)
- ML12228A690 + (Email Response from M. Lampert of Pilgrim Watch to J. Anderson 8.7.2012)
- ML19184A108 + (Email Response from Marian L. Zobler Gc to Mr. Matthew Lee Wiener Regarding Equal Access to Justice Act (Eaja))
- ML15232A163 + (Email Response from Matthew Zogby to Barry White Regarding Procedural Communications with the Atomic Safety and Licensing Board)
- ML081850331 + (Email Response from Scott Maglio to Mohan Thadani, Jack Donahew, Leon Whitney Generic Letter - 2004 - 02)
- ML15341A113 + (Email Response from Southern Nuclear Operating Company to Staff Question the Flood Hazard Re-Evaluation Report for Farley Nuclear Plant, Units 1 & 2)
- ML24129A058 + (Email Response from State of Connecticut Regarding Draft Environmental Assessment for Haddam Neck Plants Exemption Request on Financial Assurance)