Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19344D896 + (Eia of Davis-Besse Nuclear Power Station,Unit 1 on Aquatic Ecology of Lake Erie, 1973-1979)
- ML19263F412 + (Eia of NUREG-0553, Beyond Defense-In-Depth. No Comments Noted)
- ML19323F716 + (Eia,Submitted in Support of Application for Renewal of License R-81)
- ML18221A632 + (Eicb Safety Evaluation - Comanche Peak Nuclear Power Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.2 Engineered Safety Feature Actuation System Instrumentation Docket/Epid 000976/05000446/L-2018-LLA-0)
- 05000259/LER-2076-003-03, Eight Alarms Received from July 13 to 31, 1976 from Smoke Detectors in Spreading Room B Due to Sensitivity + (Eight Alarms Received from July 13 to 31, 1976 from Smoke Detectors in Spreading Room B Due to Sensitivity)
- ML19249D042 + (Eight Boxes of Slides.Available in NRC Region 1 Only)
- 05000458/FIN-2008006-01 + (Eight Examples of a Failure to Meet 10 CFR Part 50, Appendix B, Design Control (1R21.b.1))
- ML20090A808 + (Eight Exhibits from E Gallagher 801117 Deposition in Chicago,Il)
- ENS 41712 + (Eight Iodine-125 Seeds Lost Down a Sink)
- ENS 44180 + (Eight Lost Palladium - 103 Seeds)
- ML19276H757 + (Eight Ltrs Opposing Const of Facility)
- ML20204H460 + (Eight Partial Response to FOIA Request for Documents.App N Records Encl & Being Released in Entirety.App O Records Being Withheld in Part (Ref FOIA Exemption 6))
- 05000416/LER-1983-041-99, Eight Penetrations in Control Bldg Opened to Allow Conduit Routing.Caused by Planned Maint.Hourly Fire Watch Conducted.Penetrations Restored + (Eight Penetrations in Control Bldg Opened to Allow Conduit Routing.Caused by Planned Maint.Hourly Fire Watch Conducted.Penetrations Restored)
- ML20196B402 + (Eight Quarterly Rept CEI Seismic Monitoring Network Jul-Sep 1988)
- L-08-347, Eight Separate In-Service Testing Program 10 CFR 50.55a Alternatives Requests in Support of the Third Ten-Year Interval + (Eight Separate In-Service Testing Program 10 CFR 50.55a Alternatives Requests in Support of the Third Ten-Year Interval)
- ML19093A176 + (Eighteen-Month Evaluation of the Ristroph Traveling Fish Screens)
- RBG-47351, Eighteenth Fuel Cycle Core Operating Limits Report (COLR) + (Eighteenth Fuel Cycle Core Operating Limits Report (COLR))
- RBG-47402, Eighteenth Fuel Cycle Core Operating Limits Report (Colr), Revision 1 + (Eighteenth Fuel Cycle Core Operating Limits Report (Colr), Revision 1)
- L-21-017, Eighteenth Inservice Inspection Summary Report + (Eighteenth Inservice Inspection Summary Report)
- NL-07-1962, Eighteenth Maintenance/Refueling Outage Steam Generator Tube Inspection Report + (Eighteenth Maintenance/Refueling Outage Steam Generator Tube Inspection Report)
- ML20127G685 + (Eighteenth Monthly Progress Rept for May 1985 Under Fin B-7389)
- ML20070W154 + (Eighteenth Motion for Summary Disposition of Contentions Necnp II.B.1,3,4 & 5.No Genuine Issue of Matl Fact Exists & Applicant Entitled to Favorable Decision.Related Correspondence)
- ML20058C351 + (Eighteenth Progress Rept of Tx A&M Univ Nuclear Science Ctr,1981)
- ML20090A331 + (Eighteenth Quarterly Rept,Cleveland Electric Illuminating Seismic Monitoring Network,Apr-Sept 1991)
- ML080250060 + (Eighteenth Refueling Outage Inservice Inspection Report)
- L-16-019, Eighteenth Refueling Outage Inservice Inspection Summary Report + (Eighteenth Refueling Outage Inservice Inspection Summary Report)
- ML20087G453 + (Eighteenth Set of Interrogatories & Requests to Produce to Applicants Re Issue of Intimidation,Harassment & Threatening of QC Inspectors & Other Employees.Certificate of Svc Encl. Related Correspondence)
- ML20054B785 + (Eighteenth Set of Interrogatories & Request to Produce)
- ND-22-0628, Eighteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) + (Eighteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049))
- ML20126F116 + (Eighth Annual Occupational Radiation Exposure Report 1975)
- SBK-L-18075, Eighth Annual Update to License Renewal Application + (Eighth Annual Update to License Renewal Application)
- ML20070H309 + (Eighth Discovery Progress Rept.Certificate of Svc Encl. Related Correspondence)
- ML20207D568 + (Eighth Draft Suppl Rept, Comanche Peak Steam Electric Station:Alleged Climate of Intimidation)
- ML20154Q296 + (Eighth Final Response to FOIA Request for Documents. Documents Listed in App L Being Withheld in Part & Documents Listed in App M Being Withheld in Their Entirety (Ref FOIA Exemption 5))
- ML040280424 + (Eighth Interim Application of FTI Consulting Inc. for Allowance and Payment of Compensation and Reimbursement of Expenses (August 1, 2003 Through November .30, 2003); Declaration of Thomas E. Lumsden in Support Thereof)
- ML20112A534 + (Eighth Interim Deficiency & Part 21 Rept,Item 41 Re Failure of Westinghouse Reactor Protection Sys Following Secondary High Energy Line Break.Initially Reported on 800707.Design Changes Issued.Next Rept by 850430)
- ML20082E223 + (Eighth Interim Deficiency Rept Re Attached Piping.Initially Reported on 801121.B&W Refining Stress Analysis to Eliminate Excessive Conservatism.Evaluation Will Be Completed by 831118.Also Reportable Per Part 21)
- ML20071M386 + (Eighth Interim Deficiency Rept Re B&W Nonconservative Analysis of Neutron Flux.Initially Reported on 801105.Also Reportable Per Part 21.Util Awaiting Results of B&W Analysis.Next Rept Will Be Submitted by 831024)
- ML20028B632 + (Eighth Interim Deficiency Rept Re Breakdown in Quality program-procurement Cycle of Purchased Matls.Initially Reported on 800613.Bechtel Assessment Continuing.Next Rept Will Be Submitted by 830603)
- ML20066K440 + (Eighth Interim Deficiency Rept Re Failure of Main Steam Lines Due to Main Feedwater Overfill.Initially Reported on 800319.Steam Lines Can Withstand Overfill Event.Next Rept Will Be Submitted by 830328.Also Reportable Per Part 21)
- ML20077A104 + (Eighth Interim Deficiency Rept Re Failure of Chattanooga Bolt & Screw Nuts & Challenge Enterprises Bolts to Meet ASTM Specs.Initially Reported on 810924.Results of Bolting Matl Analysis Under Review.Also Reportable Per Part 21)
- ML20070S217 + (Eighth Interim Deficiency Rept Re High Energy Line Break Analysis Pipe Whip Restraint Designs.Initially Reported on 800919.Analysis Complete on 92% of Restraints.Design Drawings Under Rev.Next Rept Due by 830506)
- ML20028D156 + (Eighth Interim Deficiency Rept Re Inadequacy of Original Criteria for Use of Carbon Steel Piping in Raw Water Sys. Initially Reported on 801230.Criteria in Design Guide DG-M3.5.1 Changed.Next Rept by 831028)
- ML20069C529 + (Eighth Interim Deficiency Rept Re Itt Grinnel Welded Supports W/Discrepancies in Weld Designation.Initially Reported on 800905.Util & Manufacturer Revising All Hanger Detail Sheets.Also Reported Per Part 21.Next Rept by 831208)
- ST-HL-AE-1038, Eighth Interim Deficiency Rept Re Nonconforming Welds in Vendor Fabricated Category I Structural Steel.Initially Reported on 810108.Bechtel Will Provide Recommendations. Final Rept Anticipated by 840323 + (Eighth Interim Deficiency Rept Re Nonconforming Welds in Vendor Fabricated Category I Structural Steel.Initially Reported on 810108.Bechtel Will Provide Recommendations. Final Rept Anticipated by 840323)
- ML20128C357 + (Eighth Interim Deficiency Rept Re Omissions to Auxiliary Feedwater Pump Drawing.Initially Reported on 830225.Analysis Completed.Support Design Work in Progress.Next Rept Expected by 851218)
- ML20084H709 + (Eighth Interim Deficiency Rept Re Potential Design Deficiency in Valve Yoke to Motor Mount Weld.Initially Reported on 740514.Alternate Solution,Using Downstream Orifice Plate Installed Inside Torus,Implemented)
- ML20064M538 + (Eighth Interim Deficiency Rept Re Seismic Qualification of B&W Equipment in TVA Panels.Initially Reported on 801124. Affected Equipment Being Requalified by Bailey Meter Co Through B&W.Next Rept Due by 830909)
- ML20041A736 + (Eighth Interim Deficiency Rept Re Welding of Structural Steel Annulus Floor Framing,Initially Reported 800415.All 566 Welds Reinspected & Data Currently Under Evaluation.Next Rept Will Be Submitted by 820504)
- ML20082S792 + (Eighth Interim Rept Re Significant Const Deficiency 37 Concerning Temp Detector Failures.Corrective Action & Supporting Documentation Review Scheduled for Completion by End of Dec 1983.Final Rept Will Be Submitted by 840120)
- ML20077J438 + (Eighth Interim Rept Re Significant Const Deficiency 33, Chilled Water Piping Supports. Supporting Documentation Currently Under Review.Final Rept Will Be Submitted by 830916)