ML20077J438
| ML20077J438 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/29/1983 |
| From: | Drummond F LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, W3I83-0256, W3I83-256, NUDOCS 8308160403 | |
| Download: ML20077J438 (1) | |
Text
LOUISIANA P O W E R & L1 G H T! P O BOX COOO a 242 ouAnoNoe s,nm NEW OnLEANS LOUISIANA 70174 * (504) 366 2345
'SSlc!, s'ysY$
u July 29, 1983 W3I83-0256 Q-3-A35.07.33 Mr. John T. Collins, Regional Administrator, Region IV U.S. Nuclear Regulatory Commission hhhkD 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 AUG - 91983
SUBJECT:
Waterford SES Unit No. 3
~
Docket No. 50-382 Significant Construction Deficiency No. 33
" Chilled Water Piping Supports" Eighth Interim Report
REFERENCE:
LP&L letter W3I83-0218 dated June 29, 1983
Dear Mr. Collins:
The above referenced letter indicated submittal of a Final Report to the USNRC no later than July 29, 1983.
The supporting documentation for SCD 33 is currently under review. This review is expected to be complete by late August, 1983.
A Final Report will therefore be submitted to the USNRC by September 16, 1983.
Very truly
- urs, F. J. Drummond Project Support Manager - Nuclear FJD/WAC/ MAL:keh cc:
- 1) Director 3)
Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director 4)
Mr. W. M. Stevenson Of ficc of Ibnagement Information and hogran. Centrol U. S. Nuciecr Regulatory Commission Washington, D. C.
20555 0308160403 030729 IE-g DR ADOCH 0500038
/[o