Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML080360433 + (EDATS: OEDO-2008-0067 - Peach Bottom Review Team Findings - Memo to Wiggins/Pelton Fm Mallett)
- ML12130A135 + (EDATS: OEDO-2012-0346 - Response to Edwin I. Hatch Nuclear Plant Appeal to the Executive Director for Operations: Backfit and Applicability of Compliance Backfit Exception (to: Mr. Madison, SNC VP - Hatch; from: RW Borchardt))
- ML12279A364 + (EDATS: Region I-2012-0309 - Response Letter to Maryland Senator Reilly Regarding Calvert Cliffs Dropped Control Rod)
- ML20107C156 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program. Semiannual Progress Report for Period Ending June 30,1984)
- ML20071D939 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program. Quarterly Progress Report for Period Ending June 30,1982)
- ML20081E170 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program Quarterly Progress Report for Period Ending June 30,1983)
- ML20076N275 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program Quarterly Progress Report for Period Ending March 31,1982)
- ML20008F819 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program. Quarterly Progress Report for Period Ending September 30, 1980)
- ML20092C272 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program Annual Progress Report for Period Ending December 31, 1983)
- ML20205B188 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program. Annual Progress Report for Period Ending December 31,1984)
- ML20087P542 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program Quarterly Progress Report for Period Ending September 30, 1983)
- ML20058B407 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program. Quarterly Progress Report for Period Ending September 30, 1981)
- ML20041G251 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program. Quarterly Progress Report for Period Ending June 30,1981)
- ML20085H327 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program Quarterly Progress Report for Period Ending March 31,1983)
- ML20072J067 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program. Quarterly Progress Report for Period Ending September 30, 1982)
- ML20002C294 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program. Quarterly Progress Report for Period Ending March 31,1980)
- ML20077H459 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program, Annual Progress Report for Period Ending December 31,1983)
- ML20031A101 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program Annual Progress Report for Period Ending December 31,1980)
- ML20002C295 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program. Quarterly Progress Report for Period Ending June 30,1980)
- ML20069E912 + (EDDY-CURRENT Inspection for Steam Generator Tubing Program. Annual Progress Report for Period Ending December 31,1981)
- ML18331A325 + (EDF-1239, In-Line Rupture Disks for TMI-2 Canisters During Drying)
- ML17298A767 + (EDF-1466, Validation of Water Content in TMI-2 Canisters During Drying in the Hvds)
- ML18331A326 + (EDF-1469, Temperature Benchmarking for Dryer Runs TMI-005 and 009_6-5-2000)
- ML18331A317 + (EDF-797, Water Ingress Into TMI DSCs During Storage)
- ML20101G390 + (EDG 2G003 Camshaft Assembly Failure, Root Cause Rept)
- ML101790452 + (EDG Amendment Correction Letter)
- 05000482/FIN-2007005-01 + (EDG B Governor Failure Effect on Supplied Equipment)
- 05000395/FIN-2008007-02 + (EDG Exceeded Technical Specification Allowable Outage Time)
- 05000277/FIN-2017002-02 + (EDG Exhaust Stacks Nonconforming Design for Tornado Missile Protection)
- 05000263/FIN-2013007-04 + (EDG Fuel Oil Supply System Design does Not Meet the Single Failure Criteria)
- 05000263/FIN-2009007-05 + (EDG Fuel Oil Supply System Design does not meet the single failure criteria)
- ML12026A459 + (EDG Ifr)
- ML17332A802 + (EDG Load-Run Performance & Reliability During Short & Long Duration Test Periods TER)
- 05000219/FIN-2010008-02 + (EDG Low Voltage Control Cable Submergence)
- 05000333/LER-2024-001-01, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket + (EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket)
- 05000333/LER-2024-001, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket + (EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket)
- 05000354/FIN-2009007-02 + (EDG Overhead Cranes Not Seismically Restrained)
- ML20092A261 + (EDG Preventive Maint Insp Outage Probabilistic Safety Assessment for August 1995)
- ML20101B832 + (EDG Reliability Program Description & Comparison W/Nrc Reg Guide 1.155,Section 1.2)
- ML17228B308 + (EDG Reverse Power During Integrated Safeguards Test)
- ML20087B272 + (EDG Run Time)
- ML17044A089 + (EDG SR Presubmittal Meeting March 2, 2017)
- 05000237/FIN-2015007-02 + (EDG Usable Fuel Calculations Failed to Consider Appropriate EDG Frequency Variations)
- 05000454/FIN-2011009-03 + (EDG Usable Fuel Calculations Failed to Consider Appropriate EDG Frequency Variations)
- 05000373/FIN-2010006-02 + (EDG Usable Fuel and RHR Pump NPSH Calculations Failed to Consider Appropriate EDG Frequency Variations)
- 05000324/FIN-2012004-03 + (EDG2 Wiring on ASSD Switch)
- 05000456/FIN-2010007-06 + (EDGs Fuel Oil Consumption Calculation Failed to Account for Frequency Variations)
- ML21140A092 + (EDO - Model 1 D1G Core Basket Thermal Shield Shipping and Storage Container - Safety Analysis Report for Packaging to Support Disposal Shipment of D2W Core Basket Response to NRC Request for Additional Information)
- ML071340158 + (EDO Call for August 15, 2003; Update on Reintegration of Bargaining Unit Employees at Oyster Creek)
- ML071340154 + (EDO Call for August 8, 2003; Labor Agreement Reached and Ratified at Oyster Creek)