Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035B214 + (Cycle 9 Core Performance Rept)
- ML18153B477 + (Cycle 9 Core Performance Rept)
- ML20202E167 + (Cycle 9 Operating Limits Rept)
- ML20076G957 + (Cycle 9 Plant Transient Analysis)
- ML20211F903 + (Cycle 9 Refueling Outage)
- ML20076G974 + (Cycle 9 Reload Analysis)
- ML20097A129 + (Cycle 9 Reload Rept)
- ML20207J036 + (Cycle 9 Reload Rept)
- ML20046A094 + (Cycle 9 Reload Rept)
- ML20199F823 + (Cycle 9 Restart Physics Test Summary, for 971011-971130)
- ML20086A570 + (Cycle 9 Startup Physics Test Rept)
- ML17228B449 + (Cycle 9 Startup Physics Testing Rept)
- ML20210D256 + (Cycle 9 Startup Physics Tests Rept)
- ML18150A088 + (Cycle 9 Startup Physics Tests Rept)
- ML022190243 + (Cycle 9 Startup Report)
- ML20082F490 + (Cycle 9 Startup Rept)
- ML20046D383 + (Cycle 9 Startup Rept)
- ML20077B600 + (Cycle 9 Startup Rept for June 1983)
- ML20205K156 + (Cycle 9 Startup Test Rept)
- ML20212G104 + (Cycle 9 Startup Test Rept)
- JAFP-89-0140, Cycle 9 Startup Testing Rept + (Cycle 9 Startup Testing Rept)
- ML20199J257 + (Cycle 9 Voltage-Based Repair Criteria 90-Day Rept)
- ML20098B085 + (Cycle 9,Core Operating Limits Rept, Sept 1995)
- ML023430424 + (Cycle 9A Core Operating Limits Report (COLR))
- ML20094G379 + (Cycle Colr)
- RA15-047, Cycle Core Operating Limits Report (COLR) + (Cycle Core Operating Limits Report (COLR))
- RBG-47738, Cycle Core Operating Limits Report, Cycle 20, Revision 0 + (Cycle Core Operating Limits Report, Cycle 20, Revision 0)
- ML20129E551 + (Cycle Core Performance Analysis Rept)
- WBL-22-018, Cycle F214 Steam Generator Tube Inspection Report + (Cycle F214 Steam Generator Tube Inspection Report)
- ML19241B289 + (Cycle III Startup Test Rept)
- ML20104A371 + (Cycle IV Irradiated Fuel Insp Following Cycle IV Operation, Nov-Dec 1978)
- ML20049H626 + (Cycle IX Startup Test Rept)
- ML20116H146 + (Cycle Length Assessment Rept Addendum)
- ML20112B852 + (Cycle Length Assessment Rept Suppl)
- ML20262F924 + (Cycle Makeup Water Pretreatment House)
- ML20265A784 + (Cycle Makeup Water Treatment Addition for Unit 3. Sheet 1 of 1)
- L-MT-07-058, Cycle No. 23 Inservice Inspection Summary Report for Inservice Inspection and ASME Section XI Repairs and Replacements + (Cycle No. 23 Inservice Inspection Summary Report for Inservice Inspection and ASME Section XI Repairs and Replacements)
- ML20217J558 + (Cycle Restart Physics Test Summary, for Jul 1997)
- ML13161A090 + (Cycle Specific Technical Specification Bases Page Updates)
- ML091660602 + (Cycle Specific Technical Specification Bases Page Updates)
- ML071640334 + (Cycle Specific Technical Specification Bases Page Updates)
- L-90-299, Cycle XII Startup Rept + (Cycle XII Startup Rept)
- L-89-309, Cycle XII Startup Rept + (Cycle XII Startup Rept)
- L-92-006, Cycle XIII Startup Rept + (Cycle XIII Startup Rept)
- L-93-196, Cycle Xiv Startup Rept + (Cycle Xiv Startup Rept)
- ML20216H034 + (Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept)
- RNP-RA/03-0017, Cycle-22 Startup Test Report + (Cycle-22 Startup Test Report)
- ML12005A198 + (Cycle-Specific License Amendment Request for Rod Worth Minimizer (RWM) Bypass Allowance to Allow Reactor Startup)
- ML101820086 + (Cycle-Specific Stability Analysis - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project))
- ML19228A117 + (Cycles 27 and 26, Respectively, Core Operating Limit Report (Colr), Rev. 1)
- ML20009E156 + (Cyclic Loading Tests of Masonry Single Piers,Vol 2 - Height to Width Ratio of 1)