Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22140A137 + (Attachment 3 - Proposed Technical Specification Bases Changes (Mark-Up))
- ML18068A689 + (Attachment 3 - Proposed Technical Specification Changes (Mark-Up))
- ML101740528 + (Attachment 3 - RES Staff Presentation Handout Materials NRC-RES/Doe/EPRI Coordination Meeting NRC Headquarters, Church Street Building Wednesday, May 26, 2010)
- ML22105A093 + (Attachment 3 - RSCS Technical Support Document (Tsd) No. 21-078 Rev 00 TMI-2 Source Term Limitations and Administrative Controls to Prevent Exceeding the 1 Rem EPA PAG)
- ML051960325 + (Attachment 3 - Recommendation and Action Item Cross Reference Table 2005-025)
- ML22181B133 + (Attachment 3 - Replacement for Attachment 3, Revised Technical Specification Pages, of ULNRC-06688, as Corrected in ULNRC-06702)
- ML041060710 + (Attachment 3 - Response to Comments on Draft Safety Analyses)
- ML18191A564 + (Attachment 3 - Response to NRC Request for Additional Information)
- ML20184A014 + (Attachment 3 - Responses to NRC Comments in ML20099C323)
- ML040580185 + (Attachment 3 - Restart Action Matrix)
- ML21294A397 + (Attachment 3 - Revised Technical Specification Pages)
- LR-N08-0308, Attachment 3 - Salem, Units 1 and 2 - Calculation S-2-SJ-MDC-1394, Rev. 5, Accumulator Pressure Decay Time During Discharge Test + (Attachment 3 - Salem, Units 1 and 2 - Calculation S-2-SJ-MDC-1394, Rev. 5, Accumulator Pressure Decay Time During Discharge Test)
- ML051360008 + (Attachment 3 - Staff Guidance for Determining Site Characteristics, Permit Conditions, and COL Action Items)
- ML20307A328 + (Attachment 3 - Standardized Radiological Emergency Plan Revision EP-BY-1000, Revision 0, Byron Station Radiological Emergency Plan)
- LIC-13-0140, Attachment 3 - Strategy to Protect Fort Calhoun Station from Beyond Design Basis Flood - Redacted + (Attachment 3 - Strategy to Protect Fort Calhoun Station from Beyond Design Basis Flood - Redacted)
- ML14170A042 + (Attachment 3 - TRM Developmental Revision D Changes (Mark-Up) for WBN Unit 2)
- ML12018A214 + (Attachment 3 - TVA Calculation EPM-MCP-071689, Cooling/Heating Load & Equipment/Component Performance Analysis for the Control Building Electrical Board Room Areas (El. 692.0 & 708.0), Revision 21. (Letter Item 4, Sser 23 Appendix Hh Item N)
- ML061240259 + (Attachment 3 - Table M - More Restrictive Changes for Monticello, Amendment 146 for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues)
- ML021220061 + (Attachment 3 - Table M - More Restrictive Changes North Anna, Units 1 and 2, Amendments 231 and 212)
- ML031210857 + (Attachment 3 - Tabular Results from the Expanded Extent of Condition for CR 02-02202)
- ML20035C570 + (Attachment 3 - Targeted ITAAC Changes for Vogtle Electric Generating Plant Units 3 and 4)
- ML13254A116 + (Attachment 3 - Updated Evacuation Time Estimates for Clinton Power Station Plume Exposure Pathway and ETE Review Criteria Checklist)
- ML22327A210 + (Attachment 3 - Updated Pages Which Constitute Oqam Revision 36)
- ML14316A199 + (Attachment 3 - Westinghouse WCAP-17403-NP, Revision 1, Palisades Nuclear Power Plant Extended Beltline Reactor Vessel Integrity Evaluation)
- ML060860078 + (Attachment 3 Calculation PTN-BFJR-06-001 Phase 3 SDP for Turkey Point B AFW Pump Failure)
- ML15288A335 + (Attachment 3 Case Oct 9 2015 CCS Salinity 1973 to 2015)
- ML091810621 + (Attachment 3 Declaration of Brian E. Holian)
- ML100740265 + (Attachment 3 Pre-Dive Checklist)
- ML100740210 + (Attachment 3 Pre-Dive Checklist)
- ML100740200 + (Attachment 3 Pre-Dive Checklist)
- ML100710620 + (Attachment 3 Pre-Dive Checklist)
- ML100740212 + (Attachment 3 Pre-dive Checklist)
- ML052440415 + (Attachment 3 and 4 (Tubesheet Map and the List of Tubes with Indications, Respectively))
- ML090580619 + (Attachment 3 from Board Ordered the Staff to Update the Milestones Page on the Commissions Web Site Re Prairie Island License Renewal. Hearing File Index - Initial Disclosures)
- ML19262B017 + (Attachment 3 in Support of Petition to Intervene.Identifies Aspects of Proceeding for Which Intervention Sought.Contends That Applicant Failed to Implement Protective Measures Re Human & Technical Failures)
- ML18052A926 + (Attachment 3 of Rev 4 to Procedure EI-6.13, Protective Action Recommendation for Offsite Population)
- ML023510521 + (Attachment 3 to 01/06/03 Meeting Summary - Draft - FAQ List for 12/11-12 & 12/02)
- ML061220436 + (Attachment 3 to Comanche Peak Conference Call)
- ML13267A132 + (Attachment 3 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3596)
- DCL-13-016, Attachment 3 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3596 + (Attachment 3 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3596)
- ML22118B014 + (Attachment 3 to Email Dated 4/14/22 from Sburns (Nwp) to Ngarcia Santos (NRC) Courtesy Review - Comments from Nwp on Draft Certificate of Compliance No. 9218, Revision 26)
- ML22242A127 + (Attachment 3 to Enclosure 1 - Marked-Up Technical Specification Bases)
- ML22285A120 + (Attachment 3 to Enclosure 1: Marked-Up Technical Specifications Bases (for Information Only))
- ML19198A332 + (Attachment 3 to Environmental Law & Policy Center Petition to Intervene and Hearing Request -2018 Transcript Firstenergy Hearing)
- ML13323A552 + (Attachment 3 to GNRO-2013/00088, JC-Q1B21-N681-1 Rev. 1 Reactor Pressure Vessel Level One Setpoint Calculation)
- ML19274E218 + (Attachment 3 to ISP Answer to Sierra Club Amended Contention 13)
- LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix + (Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix)
- ML110050398 + (Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix)
- LR-N18-0055, Attachment 3 to LR-N18-0055, Affidavit for Core Operating Limits Report for Unit 1 + (Attachment 3 to LR-N18-0055, Affidavit for Core Operating Limits Report for Unit 1)
- ML15261A529 + (Attachment 3 to NL-15-089, Netco Document - INTRPND3: Verification and Validation Report March 2014. (Non-Proprietary))
- ML13275A009 + (Attachment 3 to NRC Staffs Answer to Riverkeeper, Inc. Consolidated Motion for Leave to File Amended Contention RK-EC-8A, and Amended Contention RK-EC-8A)
- ML18247A521 + (Attachment 3 to NRC Staffs Response to Albert Gomez Petition)
- ML17221A202 + (Attachment 3 to NWMI-2013-021, Rev. 1, Chapter 12 - Conduct of Operations Construction Permit Application for Radioisotope Production Facility)
- ML17221A201 + (Attachment 3 to NWMI-2013-021, Rev. 2, Chapter 6.0 - Engineered Safety Features Construction Permit Application for Radioisotope Production Facility to Chapter 11.0 - Radiation Protection and Waste Management)