Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML023040121 + (Attachment 3 to Safety Evaluation of Amendment No. 149 - Table M - More Restrictive Changes)
- ML021900574 + (Attachment 3 to Supplement Dated 02/15/2002 to License Amendment Request Dated 12/11/2000 Conversion to Improved Technical Specification Revision 9 Change Pages)
- ULNRC-06051, Attachment 3 to ULNRC-06051, Oqam Revision 29 mark-up, Identifying Changes Through the Use of Strikeovers and Inserts + (Attachment 3 to ULNRC-06051, Oqam Revision 29 mark-up, Identifying Changes Through the Use of Strikeovers and Inserts)
- RS-06-024, Attachment 3 to the Exelon Letter Dated February 13, 2006, Affidavit and Non-Proprietary Version of Attachment 2 + (Attachment 3 to the Exelon Letter Dated February 13, 2006, Affidavit and Non-Proprietary Version of Attachment 2)
- ML061370687 + (Attachment 3 to the NRC Staffs Answer to New England Coalitions Request for Leave to File New Contentions)
- RS-13-046, Attachment 3, Areva Np Inc., Affidavit of Gayle F. Elliott + (Attachment 3, Areva Np Inc., Affidavit of Gayle F. Elliott)
- ML15351A354 + (Attachment 3, Audit Open Item Responses)
- ML022560157 + (Attachment 3, Browns Ferry Nuclear Plant (BFN) - Request for Proprietary Meeting - Transition to Framatome Advanced Nuclear Power (Anp) Fuel, Draft Non-Proprietary Presentation)
- ML11171A060 + (Attachment 3, CDI Report No. 11-04NP, Stress Evaluation of Nine Mile Point Unit 2 Steam Dryer Using ACM Rev. 4.1 Acoustic Loads, Revision 0. (Non-Proprietary), Attachment 4, Affidavit from Continuum Dynamics, Inc)
- ML033000133 + (Attachment 3, Calculation Note CN-CI-02-51 Rev. 00 RCS Hot Leg RTD Nozzle and Flow Measurement Nozzle Repair - Design Verification for St. Lucie Units 1 & 2)
- ML11257A049 + (Attachment 3, Calculation, WNA-CN-00157-WBT-NP, Revision 0, Watts Bar 2 Incore Instrument System (Iis) Signal Processing System (SPS) Isolation Requirements)
- ML11221A013 + (Attachment 3, Continuum Dynamics, Inc Technical Note No. 11-17NP, Limit Curve Analysis with ACM Rev. 4.1 for Power Ascension at Nine Mile Point Unit 2, Revision 1. (Non-Proprietary))
- ML13295A453 + (Attachment 3, Core Operating Limits Report for Reload 19, Cycle 20, Revision 7)
- ML092680251 + (Attachment 3, Corrected Pages for WCAP-17071-NP, Revision 0 (Non-Proprietary))
- ML092520265 + (Attachment 3, Corrected Pages to WCAP-17072-NP (Non-Proprietary))
- ML14164A061 + (Attachment 3, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1002, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosures 3B, 3C, by 3-75 - by 3-157)
- ML14164A060 + (Attachment 3, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1002, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosures 3A, 3B, Cover - by 3-74)
- ML021140106 + (Attachment 3, E-Mailed on March 19, 2002 (Docket Nos 50-445 & 50-446). Relief Request)
- ML102070197 + (Attachment 3, Exelon Generation Company, Calculation LE-0113, Rev. 1, Reactor Core Thermal Power Uncertainty Calculation Unit 1)
- ML021770315 + (Attachment 3, Faxed to Grand Gulf. License Amendment Request Emergency Diesel Generator (EDG) Extended Allowed Out-of-Service Time)
- ML12284A184 + (Attachment 3, Final EPU Steam Dryer Load Definition CDI Report No. 12-20NP, Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1)
- ML15268A020 + (Attachment 3, Fuel Thermal Conductivity Degradation Evaluation (Non-Proprietary))
- ML052420641 + (Attachment 3, GNRO-2005/00050, Change Analysis for GGNS License Amendment Request for Kaowool Resolution)
- ML102170185 + (Attachment 3, Global Nuclear Fuel - Americas, LLC, MCNP01A, Low Enriched UO2 Pin Lattice in Water Critical Benchmark Evaluations Using ENDF/B-V Nuclear Cross-Section Data, Revision 1)
- ML20058K277 + (Attachment 3, Groundwater Hydrology Rept to Draft UMTRA-DOE/AL-050508.0000, Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings Site at Gunnison,Co)
- ML030590149 + (Attachment 3, Inspection Program Action Plan)
- ML14141A058 + (Attachment 3, Kld TR-632, Rev. 0, Development of Evacuation Time Estimates. Part 1 of 3)
- ML14141A060 + (Attachment 3, Kld TR-632, Rev. 0, Development of Evacuation Time Estimates. Part 3 of 3)
- ML14141A059 + (Attachment 3, Kld TR-632, Rev. 0, Development of Evacuation Time Estimates. Part 2 of 3)
- ML101890226 + (Attachment 3, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplemental Information for the Enclosure)
- ML102371191 + (Attachment 3, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Supplemental Information for the Enclosure)
- ML051040435 + (Attachment 3, Meeting Summary of 4/6/05 with Duke Energy Corp, Request for Digital Reactor Protective System)
- ML052570061 + (Attachment 3, Meeting Summary, Ventilation Systems Amendment)
- ML072000394 + (Attachment 3, Millstone Power Station Unit 3, License Amendment Request, Stretch Power Uprate, Mark-Up of the Operating License and Technical Specifications Pages)
- ML023220312 + (Attachment 3, Model 956-201 Failure History Summary)
- ML030660319 + (Attachment 3, NFPA Formal Interpretation Request Form)
- ML12124A217 + (Attachment 3, Offsite Dose Calculation Manual Revision 23 (No Revisions in 2011))
- ML100710606 + (Attachment 3, Pre-Dive Checklist)
- ML19281B357 + (Attachment 3, Radiation Survey, Report of Findings)
- RA-15-116, Attachment 3, Revision 11 to EP-AA-1010, Radiological Emergency Plan Annex for Oyster Creek Station, and Attachment 4, Revision 0 to EP-OC-1000, Oyster Creek Emergency Plan + (Attachment 3, Revision 11 to EP-AA-1010, Radiological Emergency Plan Annex for Oyster Creek Station, and Attachment 4, Revision 0 to EP-OC-1000, Oyster Creek Emergency Plan)
- ML023050106 + (Attachment 3, River Bend, Human Performance Questions, 1.7% Power Uprate)
- ML031700025 + (Attachment 3, SNL Final Report, Hydrogen Control Calculations for the Sequoyah Plant)
- ML040020534 + (Attachment 3, Sequoyah Unit 2 - Summary of Conference Call, November 24, 2003)
- L-2010-078, Attachment 3, St. Lucie License Amendment Request Extended Power Uprate, Renewed Facility Operating License and Technical Specifications Markups and Clean Pages + (Attachment 3, St. Lucie License Amendment Request Extended Power Uprate, Renewed Facility Operating License and Technical Specifications Markups and Clean Pages)
- ML101160191 + (Attachment 3, St. Lucie License Amendment Request Extended Power Uprate, Renewed Facility Operating License and Technical Specifications Markups and Clean Pages)
- ML063250421 + (Attachment 3, Submittal of Irradiated Reactor Vessel Surveillance Capsule Test Results for Capsule T Per 10 CFR 50 Appendix H)
- ML040570280 + (Attachment 3, Technical Specifications Pages 3.0.3, SR Applicability 3.0, Amendments 228 & 170)
- ML070600761 + (Attachment 3, Transmittal of Survey Packages in Support of Big Rock Point Phased License Termination, Class 1 Final Status Survey Release Record, 08C11, East Central Protected Area)
- U-603798, Attachment 3, U-603798, SA-1578, Revision 3, Significance Determination Process (SDP) Evaluation for CPS HPCS RCIC Storage Tank Suction Vortexing + (Attachment 3, U-603798, SA-1578, Revision 3, Significance Determination Process (SDP) Evaluation for CPS HPCS RCIC Storage Tank Suction Vortexing)
- ML15113B041 + (Attachment 3, UHS Heat Load Calculation, LSCS Design Analysis L-002453, Revision 4 (Non-Proprietary))
- ML18164A092 + (Attachment 3, Updated Pages Which Constitute Oqam, Revision 33)