Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20034A254 + (Amend 139 to License DPR-32,modifying Tech Spec 4.17,on One Time Basis,To Allow Deferral of Visual & Functional Insps of Snubbers Until End of Cycle 10,currently Projected for Oct 1990)
- ML20091C865 + (Amend 139 to License DPR-35,changing Tech Spec by Imposing New Limit of 2 Gpm Increase,Over Any 24 H Period,Of Reactor Coolant Leakage Into Primary Containment from Unidentified Sources)
- ML20045F979 + (Amend 139 to License DPR-36,increasing Membership & Quorum Requirements of PORC to Reflect Current Plant Mgt Positions & Adds Three Analytical Methods to List of Analytical Methods Approved by NRC)
- ML20207Q523 + (Amend 139 to License DPR-49,revising Tech Specs Re Diesel Generator Testing Per Generic Ltrs 83-30 & 84-15 & IE Info Notice 85-032)
- ML20062G645 + (Amend 139 to License DPR-51,revising TS Surveillance Requirement 4.6.1.5)
- ML19325C215 + (Amend 139 to License DPR-59,removing Ref to Nonexisting Primary Containment Continuous Leak Rate Monitoring Sys)
- ML20247E597 + (Amend 139 to License DPR-65,allowing Operation of Unit for Cycle 10 & Revising Tech Specs to Reflect Effects of Reduced Reactor Coolant Flow to 325,000 Gpm)
- ML17228B273 + (Amend 139 to License DPR-67,revising TS 3.5.2 for Emergency Core Cooling Sys)
- ML20092D856 + (Amend 139 to License DPR-72,relocating Negative Moderator Temp Coefficient Limit from TS to Core Operating Limits Rept)
- ML20043A878 + (Amend 139 to License DPR-77,deleting Tech Spec Surveillance Requirement 4.5.2.d.1 Re ACI Function of RHR Sys)
- ML20070B550 + (Amend 139 to License DPR-79,revises SR on Containment Integrated Leak Rate Test or App J Type a Test in Section 3/4.6.1 Primary Containment of Facility Tech Specs)
- ML20151B375 + (Amend 139 to License NPF-1,revising Tech Spec Section 3/4.10, Special Test Exceptions by Extending Surveillance Time Period for Verifying Control Rod Insertability During Rod Worth & Shutdown Margin Tests from 24 H to 7 Days)
- ML17292B790 + (Amend 139 to License NPF-12,removes EDG Accelerated Testing Requirements & Eliminates Special Reporting Requirements in Accordance w/GL-94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edg)
- ML17291A893 + (Amend 139 to License NPF-21,consisting of Changes to TS in Response to 940712 Application)
- ML17158C148 + (Amend 139 to License NPF-22,authorizing Use of ATRIUM-10 Fuel in Unit 2 Beginning W/Cycle 9 Under All Operational Conditions as Defined in Revised TSs)
- ML20217M633 + (Amend 139 to License NPF-29,revising TS Requirements for Handling Irradiated Fuel in Containment Building & in Auxiliary Building & Selected Specifications Associated with Performing Core Alterations)
- ML20248H628 + (Amend 139 to License NPF-3,revising Tech Spec to Reflect Administrative & Editorial Changes to Administrative Controls,Including Station Review Board Responsibilities)
- ML20148D900 + (Amend 139 to License NPF-49,modifying TS Surveillance 4.7.1.2.1.b,which Requires Testing of Auxiliary Feedwater motor-driven & turbine-driven Pumps on Recirculation Flow at Least Once Per 92 Days)
- ML20115B927 + (Amend 139 to License NPF-6,revising TS 3.6-1 to Incorporate Values Consistent W/Eccs Analysis Assumptions)
- ML19354C403 + (Amend 14 to 560629 Application for CP & Ol,Updating Technical Info Constituting Final Hazards Summary Rept & Superseding Preliminary Hazards Summary Rept)
- ML20059N036 + (Amend 14 to Advanced BWR SSAR)
- ML20085D459 + (Amend 14 to Application for Amend to License DPR-4, Requesting Provisional License Be Converted to Full Term OL)
- ML19326D263 + (Amend 14 to Application for CP & Ol,Modifying Reactor Bldg Design to Reflect Design Pressure Changes to Meet Current Design Parameters)
- ML19309A014 + (Amend 14 to Application for CP & Ol,Revising & Adding New Info to Fsar.App 14B,accident Purging for Reactor Bldg Hydrogen,Revised & App 15C,meteorlogical Analysis of Periodic Venting,Added.New Tech Specs Section Included)
- ML19319E060 + (Amend 14 to Application for CP & Ol,Revising Fsar.Util to AEC Re 720803 & 04 Request for Info Encl)
- ML19329B578 + (Amend 14 to Application for OL)
- ML19206A972 + (Amend 14 to CP & Ol,Incorporating Revisions to FSAR)
- ML20199F310 + (Amend 14 to Coc GDP-1 for Us Enrichment Corp for Operation of Gaseous Diffusion Plants)
- ML19290A338 + (Amend 14 to DPR-50,revising Tech Specs to Modify Tendons Selected for Insp in Tendon Surveillance Program)
- ML20148D074 + (Amend 14 to Dept of Army,Us Army Environ Hygiene Agency, Amending License in Entirety)
- ML20148D078 + (Amend 14 to Dept of Army,Us Army Environ Hygiene Agency, Amending License in Entirety)
- ML20053D687 + (Amend 14 to Environ Rept)
- ML19329A785 + (Amend 14 to General Info Portion of OL Application, Reflecting Current Ownership Proportions)
- ML13308A697 + (Amend 14 to Indemnity Agreement B-31 Changing Item 3 in Entirety)
- ML20038C439 + (Amend 14 to Indemnity Agreement B-52,deleting Item 4 of Attachment in Entirety.Licensee Acceptance Not Received)
- ML20148A941 + (Amend 14 to License 22-09761-01 for Hhs,Public Health Svc, Fda,Amending License in Entirety)
- ML20044F726 + (Amend 14 to License 34-00811-03 for Republic Steel Corp)
- ML20198Q556 + (Amend 14 to License 50-14102-01 for State of Ak,Dept of Transportation & Public Facilities,Amending License in Entirety)
- ML20133A562 + (Amend 14 to License 50-17838-02 for Providence Hosp, Authorizing Cj Sternhagen,Pd Swift,Th Johnson & Ae Jackson as Users of Licensed Matl & Dl Zellmer as User of Licensed Matl for Nonhuman Use)
- ML20133A565 + (Amend 14 to License 50-17838-02 for Providence Hosp, Authorizing Cj Sternhagen,Pd Swift,Th Johnson & Ae Jackson as Users of Licensed Matl & Dl Zellmer as User of Licensed Matl for Nonhuman Use)
- ML20151L553 + (Amend 14 to License 50-19202-01 for Alaska Welding Ctr,Inc, Amending Item 1 of Attachment to 870901 Application & Condition 18 Re Conduct of Program)
- ML20104A188 + (Amend 14 to License Application.Contains Revisions to PSAR Re Changes in Unit Designs Since 1975)
- ML17251A661 + (Amend 14 to License DPR-18,adding Tech Spec Requirement for Periodic Battery Discharge Test)
- ML20070G115 + (Amend 14 to License DPR-22,approving Repairs to Recirculation Sys Piping Authorizing Resumption of Power & Changing Tech Specs Limiting Conditions for Coolant Leak Detection Sys)
- ML20024G174 + (Amend 14 to License DPR-22,authorizing Operation of Facility W/Addl 8 X 8 Fuel Assemblies)
- ML20040C431 + (Amend 14 to License DPR-26,consisting of Change 11 to Tech Specs to Limit Decay Heat Input to Spent Fuel Pool Water & Restricting Use of Cask Handling Equipment)
- ML19345A361 + (Amend 14 to License DPR-3,including Change 119 to Tech Specs Re Surveillance Frequency for Calibr of Instrumentation Channels.Adds Requirement on Page 509-2 Re Time Interval Between Succeeding Calibrs)
- ML19322B395 + (Amend 14 to License DPR-38 Incorporating Tech Spec Change 24)
- ML20062B991 + (Amend 14 to License DPR-45,revising Tech Specs Re Deletion of Requirement for Operable Fire Detectors in Reactor Containment Bldg During Performance of Containment Integrated Leak Rate Test)
- ML19322B397 + (Amend 14 to License DPR-47 Incorporating Tech Spec Change 19)
- ML19317H149 + (Amend 14 to License DPR-51,revising Control Rod Withdrawal Limit Curves Tech Specs)