Amend 139 to License NPF-29,revising TS Requirements for Handling Irradiated Fuel in Containment Building & in Auxiliary Building & Selected Specifications Associated with Performing Core Alterations
ML20217M633
Person / Time
Site: Grand Gulf 
(NPF-29-A-139)
Issue date: 10/20/1999
From: Gramm R
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20217M639 List:
References
NUDOCS 9910270268
Download: ML20217M633 (16)


Text

,

o aeru UNITED STATES p

4 L

s:

o NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30666 4001

\\...../

ENTERGY OPERATIONS. INC.

SYSTEM ENERGY RESOURCES. INC.

SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATIQN ENTERGY MiGSISSIPPl. INC.

DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE l

L Amendment No. 139 License No. NPF-29 l.

1.'

The Nuclear' Regulatory Commission (the Commission) has found that:

l A.

The application for amendment by Entergy Operations, Inc. (the licensee) datad l

June 23,1999, as supplemented by letters dated August 6, September 8, and October 4,1999, complies with the standards and requirements of the Atomic L

Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter 1; i

B.

The facility will operate in conformity with the application, the provisions of the -

I Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations;

(

D.

- The issuance of this amendment will not be inimical to the common defense and l

security or to the health and safety of the public; and l

l-E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the L

Commission's regulations and all applicable requirements have been satisfied.

l-l' 991027026'8 991020 i

PDR ADOCK 05000416 P

PDR

rm

[

i,-

l-i l 2.

Accordingly, the license is amended by changes to the Operating License and the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-29 is hereby annended to read I

as follows:

(2)

TechnicalSoecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 139, kre hereby incorporated into this license.

Entergy Operations, Inc, chail operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION k

tw Robert A. Gramm,' Chief, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Operating License and i

the Technical Specifications Date of issuance: October 20, 1999-1 I

=

~

ATTACHMENT TO LICENSE AMENDMENT NO. -139 FACILITY L PERATING LICENSE NO. NSF-29 DOCKET NO. 50-416 Replace the following pages of the Operating License and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and

- contain marginal lines indicating the areas of change.

Remove Insert 4

4 4a 3.3-51 3.3-51 3.3 3.3-52 3.3 55 3.3-55 3.3-62 3.3-62 3.6-13 3.6-13 3.6 42 3.6-42 3.6-43 3.6-43 3.6-45 3.6-45 3.6 3.6-47 3.6-49 3.6-49 3.6-50 3.6-50

m x (b)

SERI is required to notify the NRC in writing prior to any. change :in - (i) the terms or conditions of any new or existing sale or lease agreements executed as part of the above authorized financial transactions,.. (il? the GGNS Unit 1-. operating agreement, -(iii) the existing property insurance l'

coverage for GGNS Unit 1 that would materially

-alter-the representations and conditions set forth in the Staff's Safety Evaluation Toport dated

)

December 19, 1988 attached to Amendment No. 54 In l

addition, SERI'is required to notify the NRC of any

-action by a lessor or other successor-in interest to SERI.that may have an,effect on the operation of i

~

the facility.

C.

The license shall be deemed to contain and is subject to L

the conditions specified in the Commission's regulations set forth in 10CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional

. conditions specified or incorporated below:

(1)

Maximum Power Level l

Entergy Operations, Inc. is authorized to operate L

the facility at reactor core power levels not in excess of 3833 megawatts thermal (100 percent power) in accordance with the conditions specified L

herein.

l' (2)

Technical Soecifications The. Technical Specifications contained in p

, Appendix'A and the Environmental Protection Plan contained in Appendix B, as revised through Am;ndment No.

are hereby incorporated into this j

license. Entergy Operations, Inc. shall operate j

the facility in accordance with the Technical

. Specifications and the Environmental' Protection g

Plan.

~

't.

4 Amendment No.139 L

\\

7_,.

f' i

I l

)

Page Deleted i

i l

l I

4a Amendment No. te9,139 l

Primary Containment and Drywell Isolation Instrumentation

+

3.3.6.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME J.

(continued)

J.3.1' Initiate action to Iminedi a tely restore secondary containment to OPERABLE status.

AND J.3.2 Initiate action to Immediately restore one standby gas treatment (SGT) subsystem to OPERABLE status.

AND J.3.3 Initiate action to Immediately restore isolation capability in each required secondary containment penetration flow path not isolated.

K.

As required by K.1 Isolate the affected Immediately Required Action C.1 penetration flow and referenced in path (s).

Tabl e 3.3.6.1 1.

08 i

K.2.1 Suspend moyemer.t of Immediately recently irradiated fuel assemblies in the primary and i

secondary containment.

AND (continued)

GRAND GULF 3.3-51 Amendment No. 400, 139

,,-y l

Primary Containment and Drywell Isoletion Instrumentation 3.3.6.1

.)

ACTIONS-CONblTION' REQUIRED. ACTION COMPLETION TIME

~'K.

(continued)

K.2.2 Initiate action to Immediately suspend operations with a potential for draining the reactor vessel.

I, l-L l

l t

1 L,

GRAND' Gulf 3.3-52 Amendment No. 499, 139

. i.a

P l'lt Primary Containment and Drytell Isolation Instrumentation 3.3.6.1 Table 3.3.6.1 4 N;

  • 2 of 5)

Primary Containment and Drywell isolation Instrumentation APPLICA8LE CONDITIONS MODES OR REQUIRED REFER NCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDlfl0NS SYSTEM ACTION C.1 REQUIREMENTS VALUE 2.

Primary Contairvnent and l

Drywell isolation (continued) b.

Drywell Pressure - High 1,2,3 2(b)

H SR 3.3.6.1.1 s 1.43 psig SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.6 SR 3.3.6.1.7 c.

Reactor Vessel Water 1,2,3 2(b)

F SR 3.3.6.1.1 a 152.5 Level - Low Low Low, SR 3.3.6.1.2 inches Level 1 (ECCS SR 3.3.6.1.3 Divisions 1 and 2)

SR 3.3.6.1.6 SR 3.3.6.1.7 d.

Drywell Pressure - High 1,2,3 2

F SR 3.3.6.1.1 s 1.44 psig (ECCS Divisions 1 SR 3.3.6.1.2 and 2)

SR 3.3.6.1.3 SR 3.3.6.1.6 SR 3.3.6.1.7 e.

Reactor vessel Water 1,2,3 4

F SR 3.3.6.1.1 2 43.8 Level - Low Low, Level SR 3.3.6.1.2 inches 2 (HPCS)

SR 3.3.6.1.3 SR 3.3.6.1.6 SR 3.3.6.1.7 f.

Drywell Pressure - High 1,2,3 4

F SR 3.3.6.1.1 s 1.44 psig (HPCS)

SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.6 i

SR 3.3.6.1.7 g.

Containment and Drywell 1,2,3 2M F

SR 3.3.6.1.1 s 4.0 mR/hr Ventilation Exhaust SR 3.3.6.1.2 Radiation - High SR 3.3.6.1.5 SR 3.3.6.1.7 (c) 2 K

SR 3.3.6.1.1 s 4.0 mR/hr SR 3.3.6.1.2 SR 3.3.6.1.5 SR 3.3.6.1.7 1

h.

Manual Initiation 1,2,3 2(b)

G SR 3.3.6.1.7 NA I

(c) 2 G

SR 3.3.6.1.7 NA feontinued)

(b) Also required to initiate the associated drywell isolation function.

(c) During movement of recently irradiated fuel assent >lles in primary or secondary containment and l

operatiore with a potential for draining the reactor vessel.

l i

l i

GRAND GULF 3.3 55 Amendment No. 440,139

m-e Secondary Containment Isolation Instrumentation 3.3.6.2 Tebte 3.3.6.2 1 (pige 1 of 1)

Secondary Containment Isolation Instrtmentation APPLICABLE MODES AND REQUIRED OTHER CHANNELS SPECIFIED PER TRIP SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM REQUIREMENTS VTLUE

- 1.

Reactor vessel Water 1,2,3,(a) 2 SR 3.3.6.2.1 a 43.8 inches Level-Low Low, Level 2 SR 3.3.6.2.2 SR 3.3.6.2.3 SR 3.3.6.2.5 SR 3.3.6.2.6 I

2.

Drywett Pressure - High 1,2,3 2

SR 3.3.6.2.1 s 1.43 psig 1

SR 3.3.6.2.2 SR 3.3.6.2.3 SR 3.3.6.2.5 I

SR 3.3.6.2.6 3.

Fuel Handling Area 1,2,3, 2

SR 3.3.6.2.1 s 4.0 W /hr Ventitation Exhaust (a),(b)

SR 3.3.6.2.2 Radiaticn - High High SR 3.3.6.2.4 SR 3.3.6.2.6 SR 3.3.6.2.7 4.

Fuel Handling Area Poot 1,2,3, 2

SR 3.3.6.2.1 s 35 m /hr Sweep Exhaust (a),(b)

SR 3.3.6.2.2 Radietion - High High SR 3.3.6.2.4 SR 3.3.6.2.6 SR 3.3.6.2.7 5.

Manual Initlation 1,2,3, 2

SR 3.3.6.2.6 NA (a),(b) i (a) During operations with a potential for draining the reactor vessel.

(b) During movement of recently irradiated fuel assemblies in the primary or secondary containment.

l l

l i'

i 1

l l

GRAND GULF 3.3-62 Amendment No. +00,139 l

I

PCIVs 3.6.1.3 ACTIONS (continued)

CONDITION -

REQUIRED ACTION COMPLETION TIME l

E.

Required Action and E.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, AND B, C, or D not met in MODE 1, 2, or 3.

E.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F.

Required Action and F.1


NOTE---------

associated Completion LC0 3.0.3 is not Time of Condition A, applicable.

B, C, or D not met for PCIV(s) required to be OPERABLE during Suspend movement of Immediately movement of recently recently irradiated l

irradiated fuel fuel assemblies in assemblies in the primary and secondary primary or secondary containment.

containment.

G.

Required Action and G.1 Initiate action to Immediately associated Completion suspend OPDRVs.

Time of Condition A, B, C, or D not met for OR PCIV(s) required to be OPERABLE during MODE 4 G.2 Initiate action to Immediately or 5 or during restore valve (s) to operations with a OPERABLE STATUS.

potential' for draining the reactor vessel (OPDRVs).

GRAND GULF 3.6-13 Amendment No. 440, 139

Sscondary Containment 3.6.4.1 1

L 3.6-CONTAINHENT SYSTEMS 3.6.4.1 Secondary Containment-Th' secondary containment shall 'be OPERABLE.

LC0 ~3.6.4.1 e

'APPLICABILIT :

MODES.1,'2s'and 3',

During movement 'of. recently irradiated fuel assemblies in i

the primary or secondary containment, During operations with a potential for drairing the reactor g

vessel.(0PDRVs).

1 t

I i

i L

ACTIONS

]

CONDITION REQUIRED ACTION COMPLETION TIME l

A.-

Secondary containment:

A. I.

Restore secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable-in MODE.1, containment to 2,.or.3.

OPERABLE status.

.B.

Required' Action and B.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AND not met.

I B.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

)

(continued) i l

L e

l.

. GRAND' GULF 3.6-42 Amendment No. 440,139 d

p.

l-Secondary Containment l

3.6.4.1 l

l ACTIONS (continued)

CONDITION REQUIRED ACT. ION COMPLETION TIME i

C.

Secondary containment C.1


NOTE---------

inoperable during LC0 3.0.3 is not

' movement of recently applicable.

irradiated fuel l

assemblies in the primary or secondary Suspend movement of Immediately containment or during-recently irradiated OPDRVs.

fuel assemblies in the primary and secondary containment.

AND C.2 Initiate action to Immediately l

suspend OPDRVs.

s SURVEILLANCE REQVIREMENTS SURVEILLA'.?CE FREQUENCY SR 3.6.4.1.1 Verify all auxiliary building and 31 days enclosure building equipment hatches and blowout panels are closed and sealed, SR 3.6.4.1.2 Verify each auxiliary building and 31 days enclosure building access door is closed, except when the access opening is being used for entry and exit.

(continued)

I t

GRAND CULF 3.6-43 Amendment No. 440,_139

I

)

SCIVs 3.6.4.2 l

I i

3.6 CONTAINMENT SYSTEMS l

3.6.4.2 Secondary Containment Isolation Valves (SCIVs)

LC0 3.6.4.2 Each SCIV shall be OPERABLE.

I APPLICABILITY:

MODES 1, 2, and 3,

)

i During movement of.recently irradiated fuel assemblies in l

the primary or secondary containment, l

During operations with a potential for draining the reactor vessel (0PDRVs).

i ACTIONS


NOTES------------------------------------

I.

Penetration flow paths may be unisolated intermittently under administrative controls.

2.

Separate Condition entry is allowed for each penetration flow path.

'3.

Enter applicable Conditions and Required Actions for systems made

. inoperable by SCIVs.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more A.I Isolate the affected 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> penetration flow paths penetration flow ;'ath with one SCIV by use of at least inoperable.

one closed and de-activated automatic valve or damper, closed manual valve or damper, or blind flange.

l AND i

(continued)

I l-t GRAND GULF 3.6-45 Amendment No. 440,139

c.

l' l*

SCIVs 3.6.4.2 L

' ACTIONS (continued) l CONDITION REQUIRED ACTION COMPLETION TIME D.

Required Action and 0.1


NOTE---------

i l

associated Completion-LC0 3.0.3 is not Time of Condition A applicable.

or B not met during l

movement of recently irradiated fuel Suspend movement of Immediately assemblies in the recently irradiated l

primary or-secondary fuel assemblies in cont >.inment or during the primary and OPDRVs.

secondary containment.

AND D.3 Initiate action to Immediately l

suspend OPDRVs.

l 1

i l

GRAND GULF 3.6-47 Amendment No. MO,JJS l

i.

w, SGT System t

L 3.6.4.3 3.6 CONTAINMENT. SYSTEMS 4

3.6.4.3 Standby Gas Treatment (SGT) Systere i

LC0.3.6.4.3 Two SGT subsystems shall be OPERABLE.

i

' APPLICABILITY:

. MODES l', 2, and 3, During movement of recently irradiated fuel assemblies in l

the primary or secondary containment, i

During operations with a potential for draining the reactor vessel (0PDRVs).

l ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

.A.

One SGT. subsystem A.1 Restore SGT subsystem 7 days inoperable, to OPERABLE status, i

B.

Required Action'and B.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Coridition A AND not met in MODE-1, 2, or 3.

B.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C.

Required Action and-


NOTE-------------

associated Completion' LCO 3.0.3 is not applicable.

f

-Time of Condition A not met during movement of recently C.1 Place OPERABLE SGT Immediately l

irradiated fuel subsystem in

-assemblies in the operation.

primary or secondary l

containment or during OR

. 0PDRVs..:

)

(conti:nued)

GRAND GULF 3.6 Amendment No. 440, 139 l

e~

SGT System 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.'(continued)

C.2.1.

Suspend movement of Immediately recently irradiated i

fuel assemblies in l

the primary and secondary containment.

AND C.2.2 Initiate action to Immediately suspend OPDRVs.

l D.

Two SGT subsystems D.1 Enter LC0 3.0.3.

Immediately inoperable in MODE 1, 2, or 3.

E.

TwoLSGT subsystems E.1 Suspend movement of Immediately inoperable during recently irradiated movement of recently fuel assemblies in l

j irradiated fuel the primary and assemblies in the secondary primary or secondary containment.

containment or during l

0PDRVs.

AND E.2 Initiate action to Immediately

)

suspend OPDRVs.

I 2

i GRAND GULF 3.6-50 Amendment No. 440,139 L

J t