Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085D382 + (Addendum 2 to Safeguards Rept for Phase I of Saxton Nuclear 5-Yr R&D Program)
- ML20090J630 + (Addendum 2 to Spec 7220-C-1, Soils Investigation & Testing Requirements. Related Info Encl,Including Bechtel Interofc Memos,Info Re Soils QA Audit, & PA Martinez to CPC Re Removal of Diesel Generator Bldg Surcharge)
- ML20196E175 + (Addendum 2 to Vol 2 to WCAP-12071, Westinghouse Large-Break LOCA Best Estimate Methodology,Vol 2: Application to Two- Loop PWRs Equipped W/Upper Plenum Injection,Addendum 2: Pbnp Plant Specific Analysis)
- ML20134H032 + (Addendum 2 to WCAP-9561-NP-A, Addendum to BART-A1:Computer Code for Best Estimate Analysis of Reflood Transients)
- ML22106A003 + (Addendum 2 to the Supplemental Sampling and Analysis Plan for the Ettp: Reference for the Kairos Hermes CP Application)
- ML17256A979 + (Addendum 2, Lab Fatigue Testing, Revision 0,to Steam Generator Evaluation,Ginna Steam Generator Tube Failure Incident,820125,RE Ginna Nuclear Power Plant)
- ML20236V353 + (Addendum 3 to Crdr Executive Summary)
- ML20205B213 + (Addendum 3 to Crdr,Human Engineering Discrepancy Resolution Rept)
- NMP1L3254, Addendum 3 to EP-AA-1013, Rev. 4 and Addendum 4 to EP-AA-1013, Rev. 3 Re Emergency Classification Technical Bases + (Addendum 3 to EP-AA-1013, Rev. 4 and Addendum 4 to EP-AA-1013, Rev. 3 Re Emergency Classification Technical Bases)
- ML20205P428 + (Addendum 3 to Engineering Practices & Procedures Manual Section 5.38, Design Verification)
- ML20202H248 + (Addendum 3 to Millstone Nuclear Power Station,Unit 2 Annual Rept)
- ML20206N131 + (Addendum 3 to Millstone Nuclear Power Station Unit 3 Annual Rept, Including Changes Not Provided in)
- ML17237C076 + (Addendum 3 to NEI 08-09, Revision 6 Dated April 2010 System and Services Acquisition)
- ML20059E610 + (Addendum 3 to Physics Methodology for PWR Reload Design)
- ML20127B943 + (Addendum 3 to Rev 0 to Special Process Procedure W-SP-13, Repair,Insp & Documentation of Basemat Foundation Beneath Columns H10A & H11A Lying on Placement 19)
- ML20195D141 + (Addendum 3 to Rev 4 to Environ Qualification Summary Rept)
- ML20085D676 + (Addendum 3 to Safeguards Rept for Phase I of Saxton Nuclear Experimental Corp 5-Yr R&D Program)
- ML20093D335 + (Addendum 3 to Spec CNS-1205.04-1, Nuclear Safety-Related Diaphragm Valves)
- ML20197E675 + (Addendum 3 to Subcontract Documents TUB-PH-II for Umtra Project Tuba City,Az)
- ML17256A981 + (Addendum 3, Phase II Metallurgical Exams, Revision 0,to Steam Generator Evaluation,Ginna Steam Generator Tube Failure Incident,820125,RE Ginna Nuclear Power Plant)
- ML20141N344 + (Addendum 3, Vent Header & Vent Pipe Impact Loads, to Mark I Containment Evaluation Short-Term Program Final Rept)
- ML19210B362 + (Addendum 3,Rept on Containment Bldg Ring Girder Const & Repair)
- ML20205R353 + (Addendum 4 to Annual Rept,)
- ML20087A835 + (Addendum 4 to Co Rept 50-219/70-05 on 700520-21. Noncompliance Item Re Lack of Drive Exercising on 700415 Noted.Major Areas Inspected:Records Associated W/ Rebuilding & Requalification of All CRDs)
- ML20005E036 + (Addendum 4 to Crdr, Human Engineering Discrepancy Resolution Rept)
- ML20205B267 + (Addendum 4 to Crdr,Executive Summary)
- ML20205P411 + (Addendum 4 to Engineering Practices & Procedures Manual Section 5.38, Design Verification)
- ML20113H205 + (Addendum 4 to LOCA Analysis Rept for Ja Fitzpatrick Nuclear Power Plant (Lead Plant))
- ML13317B501 + (Addendum 4 to Rept on Soil Backfill Conditions)
- ML17256A983 + (Addendum 4, External Tube Loading Test, Revision 1 to Steam Generator Evaluation,Ginna Steam Generator Tube Failure Incident,820125,RE Ginna Nuclear Power Plant)
- ML19210B366 + (Addendum 4,Rept on Containment Bldg Ring Girder Const & Repair)
- ML19259C833 + (Addendum 5 to Applicants Environ Rept,Expanded U Oxide Fuel Plant)
- ML20005E039 + (Addendum 5 to Crdr, Executive Summary)
- ML20205P387 + (Addendum 5 to Engineering Practices & Procedures Manual Section 5.38, Design Verification)
- ML20217Q904 + (Addendum 5 to Mnps Unit 2 Annual Rept)
- ML20203H033 + (Addendum 5 to Mnps,Unit 3 Annual Rept)
- ML20042D683 + (Addendum 5 to Rev 2 to WVDP-043, Oil,Hazardous Substances & Hazardous Wastes Spill Prevention,Control & Countermeasures Plan)
- ML20070M572 + (Addendum 5 to Spec S-2299-4, Design,Furnishing,Erection & Testing of Reactor Drywell & Suppression Chamber Containment Vessels for Jersey Central Power & Light Co. Oyster Creek,Nj)
- ML20205P355 + (Addendum 6 to Engineering Practices & Procedures Manual Section 5.38, Design Verification)
- ML20236S317 + (Addendum 6 to Millstone Unit 1 Annual Rept,)
- ML20196K179 + (Addendum 6 to Millstone Unit 2 Annual Rept,)
- ML19080A152 + (Addendum 7 Alternative Security Controls - Comments After March 7 Public Meeting 3-21-2019)
- ML20216J943 + (Addendum 7 to Mnps,Unit 3 Annual Rept,)
- ML20217N575 + (Addendum 8 to Mnps Unit 3 Annual Rept,)
- ML20093D418 + (Addendum 9 to Spec CNS-1205.00-00-0006, Nuclear Safety- Related Carbon Steel Valves)
- ML25303A288 + (Addendum 9 to the MOU Between Us NRC and DOE on Nuclear Energy Innovation)
- ML20012C402 + (Addendum Application for Amend to Certificate of Compliance 9183,updating Design of Model NFS-4/NAC-1.Revised SAR for NFS-4/NAC-1 Spent Fuel Shipping Cask, Encl)
- IR 05000315/1984021 + (Addendum Consisting of Confirmatory Measurements Program Data Sheet to Insp Repts 50-315/84-21 & 50-316/84-23)
- ML20215A700 + (Addendum E-3, Proposal for Annotation of Land Records, to Umtrap Vicinity Property Mgt Implementation Manual)
- ML22054A124 + (Addendum Email from D. Lawrenz Non Standard License Conditions)
- ML21133A005 + (Addendum Email from G. Forsee Submission of Illinois Regulation 335.9180)