Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "9. Packcrete Material Properties". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML25259A233  + (9-30 Prop Closed Meeting Slides H2 Based Transient Clad Axiom Strain)
  • ML20276A022  + (9-30-20 Petitioner Nuclear Energy Institutes Opening Brief (DC Cir.)(Case No. 19-1240))
  • ML25259A242  + (9-30-25 Closed Meeting PWROG Nonprop Presentation Slides 3 WAAP-13495)
  • ML12249A278  + (9-4-12 Memo from A. Mitchell of FEMA to K. Williams Statement of Continuation of Reasonable Assurance for Waterford 3 Nuclear Power Plant Research)
  • ML25252A226  + (9-4-2025 Illinois Emergency Management Agency and Office of Homeland Security Review of Zion License Amendment Request)
  • ML24282B029  + (9-5-2024 Genesis Alkali Written Report to NRC Regarding 4-4-2024 Event)
  • ML23249A003  + (9-5-23 - Email to A. Brenner, SMR, LLC (Holtec) NRC Staff Response to Questions Guidance for Multi-unit Probabilistic Safety Analysis (Project 99902049))
  • ML21265A034  + (9-7-21 Entry of Appearance for United States (DC Cir.)(Case No. 21-1162))
  • ML22256A136  + (9-7-22 ISP Response to Rule 28(j) Letter (5th Cir.)(Case No. 21-60743))
  • ML22256A139  + (9-7-22 NRC Response to Fasken 28(j) Letter (5th Cir.)(Case No. 21-60743))
  • ML21259A147  + (9-9-21 Appellant Appendix (DC Cir.)(Case No. 21-1134))
  • ML21259A146  + (9-9-21 Appellant Brief (DC Cir.)(Case No. 21-1134))
  • ML23031A102  + (9-9-22 E-mail to J. Hawkins, SMR, LLC NRC Staff Response to the Clarification Question Regarding Piping Design and Analysis for the SMR-160 Design)
  • ML25252A185  + (9-9-25 Letter from Texas Historical Commission Response to Initiation of NHPA Section 106 Consultation for Long Mott Generating Station Construction Permit Application)
  • ML23115A345  + (9-CGS-2023-02 Final Op Test)
  • ML20241A249  + (9-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics Outline)
  • ML20276A160  + (9-CW-2020-08 Operating Test - Final)
  • ML23311A298  + (9-Callaway-2023-09 Final Operating Test)
  • ML17081A534  + (9-Columbia-2017-02 Final Operating Test)
  • ML25195A114  + (9-Edwin Lyman-Presentation to NRC Public Meeting on EO 14300 16 July 2025)
  • ML23143A210  + (9-PV-2023-05 NRC Final Operating Test - Palo Verde Generating Station)
  • ML21246A130  + (9-STP-2021-07 Final Operating Test)
  • ML20007E317  + (9-WC-2019-12 Final Operating Test)
  • ML25042A647  + (9. Final CoC 1031 Amendment 1 Revision 3 TS Appendix a)
  • ML23250A332  + (9. Final CoC 1031 Amendment 2 Revision 2 TS Appendix a)
  • ML24211A247  + (9. Proposed CoC 1031 Amendment 1 Revision 3)
  • ML22220A160  + (9. Proposed CoC 1031 Amendment 2 Revision 2 TS Appendix a)
  • ML24179A270  + (9. Proposed CoC No. 1040, Amendment No. 2, Revision 1, Appendix a)
  • ML24242A055  + (9. Proposed Renewed CoC No. 1025 Amendment No. 9, Appendices a and B)
  • ML22354A272  + (9. Proposed Technical Specifications Appendix C for CoC No. 1026, Renewed Amendment No. 1)
  • ML23068A393  + (9. Renewed Certificate of Compliance No. 1014, Amendment No. 2, Appendix a)
  • ML21316A201  + (9. Technical Specifications (Appendix B) for CoC No. 1008, Renewed Amendment No. 2)
  • ML102920089  + (9.1 Hurricanes or Tornadoes)
  • ML12262A335  + (9.13.2012 TMI Alert Presentation Nreg 0654 Public Mtg)
  • ML102920090  + (9.2 Seismic Events)
  • ML030230684  + (9.2 to Procedure 91203-C, Activation and Operation of the Emergency Operations Facility)
  • ML102920479  + (9.3 Exhibit 3 Glenn Craig)
  • ML102920093  + (9.3 Ground Movement)
  • ML042370088  + (9/02/04, Oconee, Units 1, 2, & 3, Amdment Nos. 340, 342 and 341 Re. Installation of Passive Low-Pressure Injection Cross Connect Inside Containment for Unit 3)
  • ML042470091  + (9/03/04, North Anna and Surry Power Stations, Units 1 and 2, RAI, Informational Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
  • ML032481328  + (9/05/03-SER Appendix B Chronology)
  • ML072670102  + (9/06/2007 Summary of Meeting with Representatives of EOI for Waterford 3 Batwing Issues and Planned Actions During the Mid-Cycle Outage)
  • ML072670108  + (9/06/2007 Waterford Steam Electric Station, Unit No. 3 - Meeting Handouts)
  • ML032580953  + (9/08/2003, South Texas Project, Units 1 and 2, Notice of Consideration of Issuance of Amendments to Facility Operating Licenses Re. Antitrust Conditions Contained in Appendix C)
  • ML13269A059  + (9/09/2013, E-mail from B. A. Fuller to John-Chau Nguyen PA DEP Comments on Draft EA)
  • ML092400119  + (9/1/2009 Arkansas Nuclear One 2009 Midcycle Performance Review and Inspection Plan)
  • ML092400097  + (9/1/2009 Columbia 2009 Midcycle Performance Review and Inspection Plan)
  • ML092400102  + (9/1/2009 Comanche Peak Midcycle Performance and Inspection Plan)
  • ML092400131  + (9/1/2009 Fort Calhoun 2009 Midcycle Performance Review and Inspection Plan)
  • ML092400133  + (9/1/2009 Grand Gulf 2009 Midcycle Performance Review and Inspection Plan)