Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "2 - Lmp for Operating Reactors". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML22354A249  + (1_RBS-2022-12 Outlines Draft)
  • ML23150A028  + (1a - Background)
  • ML23150A029  + (1b - Japanese Research)
  • ML13289A203  + (1e.iii.3.1, Sequoyah Nuclear Plant (SQN) TN5 64-002-0504-Required Actions from March 30, 2009 Division of Solid Waste Management Compliance Evaluation Inspection)
  • ML040840628  + (1pm Notice of Public Meeting Between NRC and Firstenergy Nuclear Power Operating Co. to Discuss Licensee Performance and Planned Activities as Part of the IMC 0350 Process)
  • ML18204A185  + (1st Amended Complaint 10-11-2016 (2))
  • ML060590533  + (1st Quarter 2003 & 4th Quarter 2002 Survey Comments)
  • ML14209A935  + (1st Quarter 2014 Performance Review)
  • DCL-2025-515, 1st Quarter 2025 Report on Discharge Self-Monitoring  + (1st Quarter 2025 Report on Discharge Self-Monitoring)
  • ML24018A242  + (1st Quarter FY2024 Email Update Consultation Between the Osage Nation and the NRC Pertaining to Indianas Request for Agreement)
  • ML25030A044  + (1st Quarter FY2025 Email Update Re Consultation Between the Osage Nation and the NRC Pertaining to Indianas Request for Agreement)
  • ML011570508  + (1st Review Checklist)
  • ML012320005  + (1st Review Checklist)
  • ML011580396  + (1st Review Checklist for Acceptance Review for Ssd 00-047)
  • ML011830019  + (1st Review Checklist for Ssd 01-033)
  • ML23018A153  + (1st Set of Request for Additional Information Regarding Framatome Topical Report, ANP-10350P, Revision 0, Framatome Methodology for Boiling Water Reactors: Evaluation and Validation of Apollo2-A/ARTEMIS-B (EPID L-2022-TOP-0038) - Letter)
  • ML21160A245  + (1st Town Hall Meeting - on Vendor Supplier Oversight - Regulatory Alternatives for Supplier Oversight During Exigent Conditions)
  • ML21160A241  + (1st Town Hall Meeting on Vendor Oversight - Design Control: Importance of Adherance to the Requirements in the Procurement Specifications)
  • PMNS20210419, 1st Town Hall Meeting on Vendor Oversight  + (1st Town Hall Meeting on Vendor Oversight)
  • ML19298C592  + (1to Updated Final Safety Analysis Report, List of Effective Pages)
  • ML18193A733  + (2)
  • ML21217A113  + (2 - 2021 Crpk MOU - Clean Version for Signatures)
  • ML25293A458  + (2 - Control of Heat Generation)
  • ML24152A180  + (2 - Enclosure 1 - Special Nuclear Materials-362 License Renewal Safety Evaluation Report - Public)
  • ML25280A085  + (2 - Lmp Overview)
  • ML24067A007  + (2 - NRC - Workshop3 - Non-LOCA - FFRD - Final)
  • ML25016A259  + (2 - Performance Demonstration Update)
  • SBK-L-17051, 2 - Revision to Flow Accelerated Corrosion Program Operating Experience  + (2 - Revision to Flow Accelerated Corrosion Program Operating Experience)
  • ML15054A143  + (2 - Soarca Peach Bottom Unmitigated Stsbo with RCIC Blackstart Source Term)
  • ML19105A833  + (2 - Technical Evaluation Report: Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environmental Qualification Safety Evaluation Reports (F-11 and B-60))
  • ML20266H996  + (2 1/2 Ch Line Inside Reactor Cont Annulus)
  • ML20259D068  + (2 Aluminum Cone Roof Condensate Storage Tanks 30-OD & 42 Hg)
  • ML11325A003  + (2 Beaver Valley Power Station Unit 2 SER VRR4 Class 1 SRV Test Frequency)
  • ML24240A120  + (2 Certificate of Compliance 1014 A18 Final Appendix a)
  • ML021580281  + (2 Change 02-004 to Ameren UE Operating Quality Assurance Manual)
  • ML22098A051  + (2 Cycle 25 High Burnup Lead Test Assembly NRC Pre-Submittal Meeting on April 22, 2022 (EPID L-2022-LRM-0022) (Slides))
  • ML20059H521  + (2 Cycle 9 IPC Assessment & Projected EOC-10 Slb Leakage)
  • ML20072N079  + (2 DUWP Abstract for USGS Icemm Meeting on March 17, 2020)
  • ML19340D868  + (2 Electric Distribution Sys Voltages)
  • ML20101U435  + (2 Exercise Manual,Fermex 84)
  • ML21244A297  + (2 Final CoC 1042 Amendment 2 Issued to Tn Americas, LLC)
  • ML20338A389  + (2 Form Comments from Riverkeeper Constituents to Commissioner Hanson Regarding the Indian Point License Transfer Application (NRC-2020-0021)- Subject: Fully Adjudicate All Pending Petitions)
  • ML20099F350  + (2 Hydrogen Water Chemistry Program:Assessment of Plant Operation During Initial Fuel Cycle Through Jul 1984)
  • ML17194B557  + (2 Main Steam Monitoring Procedure 7-Day Data Evaluation)
  • ML21277A085  + (2 Nazila Tehrani BWRModel5)
  • ML17244A021  + (2 Nomination Letter - David Stroup to NFPA 551)
  • ML12297A084  + (2 North Anna 2012-301 Draft RO Written Exam)
  • ML033360405  + (2 P.M. Transcript of Public Meeting Between NRC and Firstenergy Nuclear Power Operation Company Davis-Besse Nuclear Power Station)
  • ML050840491  + (2 Pages Fort Calhoun - for Amd. 234. Elimination of Requirements for Hydrogen Monitors Using the Consolidated Line Item Improvement Process (Tac. MC4305))
  • ML071150220  + (2 Part E-Mail Between R. Pedersen, Dpopm, and M. Shannon, Rii, Subject: Action: DPO-2006-002 Comments)