Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22354A249 + (1_RBS-2022-12 Outlines Draft)
- ML23150A028 + (1a - Background)
- ML23150A029 + (1b - Japanese Research)
- ML13289A203 + (1e.iii.3.1, Sequoyah Nuclear Plant (SQN) TN5 64-002-0504-Required Actions from March 30, 2009 Division of Solid Waste Management Compliance Evaluation Inspection)
- ML040840628 + (1pm Notice of Public Meeting Between NRC and Firstenergy Nuclear Power Operating Co. to Discuss Licensee Performance and Planned Activities as Part of the IMC 0350 Process)
- ML18204A185 + (1st Amended Complaint 10-11-2016 (2))
- ML060590533 + (1st Quarter 2003 & 4th Quarter 2002 Survey Comments)
- ML14209A935 + (1st Quarter 2014 Performance Review)
- DCL-2025-515, 1st Quarter 2025 Report on Discharge Self-Monitoring + (1st Quarter 2025 Report on Discharge Self-Monitoring)
- ML24018A242 + (1st Quarter FY2024 Email Update Consultation Between the Osage Nation and the NRC Pertaining to Indianas Request for Agreement)
- ML25030A044 + (1st Quarter FY2025 Email Update Re Consultation Between the Osage Nation and the NRC Pertaining to Indianas Request for Agreement)
- ML011570508 + (1st Review Checklist)
- ML012320005 + (1st Review Checklist)
- ML011580396 + (1st Review Checklist for Acceptance Review for Ssd 00-047)
- ML011830019 + (1st Review Checklist for Ssd 01-033)
- ML23018A153 + (1st Set of Request for Additional Information Regarding Framatome Topical Report, ANP-10350P, Revision 0, Framatome Methodology for Boiling Water Reactors: Evaluation and Validation of Apollo2-A/ARTEMIS-B (EPID L-2022-TOP-0038) - Letter)
- ML21160A245 + (1st Town Hall Meeting - on Vendor Supplier Oversight - Regulatory Alternatives for Supplier Oversight During Exigent Conditions)
- ML21160A241 + (1st Town Hall Meeting on Vendor Oversight - Design Control: Importance of Adherance to the Requirements in the Procurement Specifications)
- PMNS20210419, 1st Town Hall Meeting on Vendor Oversight + (1st Town Hall Meeting on Vendor Oversight)
- ML19298C592 + (1to Updated Final Safety Analysis Report, List of Effective Pages)
- ML18193A733 + (2)
- ML21217A113 + (2 - 2021 Crpk MOU - Clean Version for Signatures)
- ML25293A458 + (2 - Control of Heat Generation)
- ML24152A180 + (2 - Enclosure 1 - Special Nuclear Materials-362 License Renewal Safety Evaluation Report - Public)
- ML25280A085 + (2 - Lmp Overview)
- ML21167A127 + (2 - Lmp for Operating Reactors)
- ML24067A007 + (2 - NRC - Workshop3 - Non-LOCA - FFRD - Final)
- ML25016A259 + (2 - Performance Demonstration Update)
- SBK-L-17051, 2 - Revision to Flow Accelerated Corrosion Program Operating Experience + (2 - Revision to Flow Accelerated Corrosion Program Operating Experience)
- ML15054A143 + (2 - Soarca Peach Bottom Unmitigated Stsbo with RCIC Blackstart Source Term)
- ML19105A833 + (2 - Technical Evaluation Report: Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environmental Qualification Safety Evaluation Reports (F-11 and B-60))
- ML20266H996 + (2 1/2 Ch Line Inside Reactor Cont Annulus)
- ML20259D068 + (2 Aluminum Cone Roof Condensate Storage Tanks 30-OD & 42 Hg)
- ML11325A003 + (2 Beaver Valley Power Station Unit 2 SER VRR4 Class 1 SRV Test Frequency)
- ML24240A120 + (2 Certificate of Compliance 1014 A18 Final Appendix a)
- ML021580281 + (2 Change 02-004 to Ameren UE Operating Quality Assurance Manual)
- ML22098A051 + (2 Cycle 25 High Burnup Lead Test Assembly NRC Pre-Submittal Meeting on April 22, 2022 (EPID L-2022-LRM-0022) (Slides))
- ML20059H521 + (2 Cycle 9 IPC Assessment & Projected EOC-10 Slb Leakage)
- ML20072N079 + (2 DUWP Abstract for USGS Icemm Meeting on March 17, 2020)
- ML19340D868 + (2 Electric Distribution Sys Voltages)
- ML20101U435 + (2 Exercise Manual,Fermex 84)
- ML21244A297 + (2 Final CoC 1042 Amendment 2 Issued to Tn Americas, LLC)
- ML20338A389 + (2 Form Comments from Riverkeeper Constituents to Commissioner Hanson Regarding the Indian Point License Transfer Application (NRC-2020-0021)- Subject: Fully Adjudicate All Pending Petitions)
- ML20099F350 + (2 Hydrogen Water Chemistry Program:Assessment of Plant Operation During Initial Fuel Cycle Through Jul 1984)
- ML17194B557 + (2 Main Steam Monitoring Procedure 7-Day Data Evaluation)
- ML21277A085 + (2 Nazila Tehrani BWRModel5)
- ML17244A021 + (2 Nomination Letter - David Stroup to NFPA 551)
- ML12297A084 + (2 North Anna 2012-301 Draft RO Written Exam)
- ML033360405 + (2 P.M. Transcript of Public Meeting Between NRC and Firstenergy Nuclear Power Operation Company Davis-Besse Nuclear Power Station)
- ML050840491 + (2 Pages Fort Calhoun - for Amd. 234. Elimination of Requirements for Hydrogen Monitors Using the Consolidated Line Item Improvement Process (Tac. MC4305))
- ML071150220 + (2 Part E-Mail Between R. Pedersen, Dpopm, and M. Shannon, Rii, Subject: Action: DPO-2006-002 Comments)