Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17325B087 +
- ML17304A867 +
- ML17304A864 +
- ML17304A863 +
- ML18054A486 +
- ML18054A484 +
- ML18153B570 +
- ML18153B569 +
- ML20058N814 +
- ML20244C647 +
- ML20246G247 +
- ML20246F933 +
- ML20246B894 +
- ML20246B886 +
- ML20245L244 +
- ML20245E852 +
- ML20235H107 +
- ML20235A998 +
- ML20217B904 +
- AECM-89-0003, Responds to NRC Re Violations Noted in Insp Rept 50-416/88-26.Corrective Actions:Snm Transactions Transmitted to DOE Via Form 741 Verified & Necessary Corrections Made to Previously Transmitted Forms +
- ML20260K552 +
- ML20260E542 +
- ML20235H195 +
- ML20012C904 +
- ML20033E748 +
- ML20033E747 +
- ML20199A984 +
- ML20033E562 +
- 05000281/LER-1988-025-02, :on 881208,determined That Power Supplies for Two Safety Injection Valve Operators Reversed.Caused by Error During Initial Plant Const.Engineering Work Request Issued to Correct as-found Conditions +
- L-89-012, Special Rept:Listed Fire Protection Sys Impairments Opened. Causes Include Leaching in Thermolag Insulation,Grout Void & Faulty Latching & Locking Mechanisms on Fire Doors.List of Impairments Open in Excess of Tech Spec Limits Encl +
- IR 05000397/1988044 +
- ML17201M281 +
- PNO-II-89-005, on 890107,reactor Operator Noted Decreasing Pressurizer Level.Caused by Leak from Nonrunning RHR 3B Pump Discharge Line Drain Isolation Valve.Valve Closed & Leak Secured.Root Cause Under Investigation +
- ML14183A137 +
- 05000206/LER-1988-020-01, :on 881208,failure to Fully Implement Design Requirements of NUREG-0737 in Design of Steam Generator wide-range Level Indication Sys Occurred.Cause Under Inquiry.Corrective Actions Will Be Implemented +
- ML13330B455 +
- ML13330B451 +
- PNO-V-89-004, on 890106,reactor Trip & Safety Injection Actuation Occurred.Caused by Failure of non-1E Power Supply Due to Ground Jumper.Jumper Removed & Steam Generator Level Sensing Lines Blown Down for Sludge Accumulation +
- ML17055E429 +
- ML14188A965 +
- PNO-II-89-004, on 890107,flammable Mixture of Hydrogen Introduced Into Air Sys,Instead of Supplying Air to Main Generator.Cause Under Investigation.Plant Remains in Refueling Outage +
- Information Notice 1989-02, Criminal Prosecution of Licensees Former President for Intentional Safety Violations +
- ML100331037 +
- ML17055E441 +
- ML14183A135 +
- ML17285A208 +
- PNO-V-89-005, on 890106,unscheduled Shutdown Initiated for More than 48 H as Result of Condenser Tube Leakage.Tubes Plugged & Baffle,Provided to Prevent Steam Impingement Directly Onto Tube,Repaired.Repairs Completed by 890109 +
- ML17055E451 +
- ML18038A426 +
- ML17055E464 +