Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000382/2014011 +
- IR 05000266/2014502 +
- IR 05000390/2014404 +
- ML15028A135 +
- ML15005A386 +
- ML14330A300 +
- ML15002A091 +
- TAC:MF5494 +
- ML14364A403 +
- IR 05000400/2014302 +
- ML14364A153 +
- ML14351A438 +
- TAC:MF5734 +
- TAC:MF5271 +
- TAC:MF5243 +
- TAC:MF5484 +
- ML14356A004 +
- ML14364A405 +
- NL-14-1996, Expedited Seismic Evaluation Process Report - Fukushima Near-Term Task Force Recommendation 2.1 +
- NL-14-1839, E. I. Hatch, Units 1 and 2, First Six-Month Status Report of the Implementation of the Commission Order with Regard to Requirements for Reliable Hardened Containment Vents (EA-13-109) +
- NL-14-1989, Expedited Seismic Evaluation Process Report - Fukushima Near-Term Task Force Recommendation 2.1 +
- ML15021A457 +
- NRC-14-0083, Response to NRC Request for Additional Information for the Review of License Renewal Application - Sets 4, 5, and 6 +
- ML15007A192 +
- ML15005A513 +
- JAFP-14-0143, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the +
- ONS-2014-155, Submittal of Emergency Plan Implementing Procedure Revision 2014-026 +
- BVY 14-081, Pre-Notice of Disbursement from Decommissioning Trust +
- ML15005A029 +
- NL-14-1371, Cyber Security Plan Implementation Schedule License Amendment Request +
- L-MT-14-101, Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 +
- CNL-14-212, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident +
- RA-14-104, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan +
- ML14365A012 +
- ML14365A011 +
- Press Release-IV-14-027, NRC Schedules Regulatory Conference to Discuss Apparent Violation at Diablo Canyon Nuclear Power Plant +
- ML14364A113 +
- RS-14-310, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Methodology and Proposed Change to Technical Specification 4.3.1, Criticality +
- ML14364A056 +
- ML14364A049 +
- ML14353A454 +
- ML14343A934 +
- ML14363A349 +
- L-2014-366, St. Lucie, Unit 2 - Application for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel +
- ML14364A162 +
- 05000265/LER-2014-004, Regarding HPCI Inlet Drain Pot Level Switch Failure +
- 05000529/LER-2014-002, Regarding Technical Specification (TS) Required Plant Shutdown Due to a Dropped Control Element Assembly +
- 05000461/LER-2014-005, Failure of Shutdown Service Water Pump Results in Loss of Division 3 Emergency Diesel Generator and High Pressure Core Spray Safety Functions +
- 05000275/LER-2014-004, Actuation of Six Emergency Diesel Generators Due to Loss of Offsite Power +
- ML14353A425 +