Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-4176, Requests NRC Consent Per 10CFR50.80 to Proposed Corporate Restructuring Which Will Result in Creation of Holding Company,Pp&L Resources,Inc.Application File W/Pa Public Util Commission & Securities & Exchange Commission Encl +
- ML17312A078 +
- ML17228A659 +
- ML17228A656 +
- NRC Generic Letter 1994-03 +
- ML17059A376 +
- ML18100B227 +
- ML18153B023 +
- ML18153B022 +
- TAC:MB9116 +
- ML20073E172 +
- ML20072S375 +
- ML20072A637 +
- ML20071P810 +
- ML20071M322 +
- ML20071M232 +
- ML20071M184 +
- ML20071M024 +
- ML20071L120 +
- ML20071L081 +
- ML20071L000 +
- ML20071K917 +
- ML20071K909 +
- ML20149F373 +
- ML20149F177 +
- ML20266A166 +
- NG-94-2682, Responds to Violations Noted in Insp Rept 50-331/94-09. Corrective Actions:Verified That Steps in STP-41A005 Completed Appropriately & STP-41A005 Revised to Reflect New Test Equipment Prior to Use During 1993 Refueling Outage +
- LIC-94-0157, Forwards 1994/1995 Statement of Cash Flow from Operations as Guarantee of Payment of Deferred Premiums for Period of 940630-950630,in Compliance w/10CFR140.21 +
- HL-4646, Provides Response to Questions Re Transmitter Replacements & Actions to Maintain High Degree of Confidence for Detecting Transmitter Failures Caused by Loss of fill-oil +
- NRC-94-4235, Forwards Ltr Rept NSD-TAP-3083, Suppl Documentation in Further Response to Request for Addl Info (TAC MB9116),Item 2A,in Support of Braidwood Unit 1 SG Tube Interim Plugging Criteria. Ltr Rept NSD-TAP-3083 Withheld,Per 10CFR2.790 +
- U-602318, Responds to NRC Re Violations Noted in Insp Rept 50-461/94-08.Corrective Action:Supervisors Met W/Employees in Small Groups to Discuss Violation +
- NRC-94-4236, Forwards Responses to NRC RAIs 940419,27,29,0511,26,0601 & 0608 RAIs on AP600.Revs of Responses Previously Submitted Also Provided,Completing Response to NRC +
- ML23158A152 +
- ML20265C110 +
- ML20210U978 +
- ML20197E032 +
- 05000219/LER-1994-009, :on 940701,discovered Design Deficiency Was Identified in DG (EIIS-EK) Automatic Initiation Logic.Caused by Original Plant Design.Mod Had Been Scheduled for 15R Refueling Outage to Remove Lockout Bus 1A & 1B +
- 05000269/LER-1994-003-03, :on 940623,discovered That Failure of an Air Pressure Regulator Resulted in Kh Main Transformer Lockout Relay Actuation.Caused by Design Deficiency.Repaired Affected Air System Components +
- ML20071K892 +
- ML20071L238 +
- ML20071K862 +
- ML20071K874 +
- ML20071L234 +
- ML20071K883 +
- ML20070J683 +
- RA-94-079, Forwards Update on Containment & Accumulator Initial Temp Assumptions for LB-LOCA Analysis +
- GO2-94-173, Responds to NRC Re Violation Noted in Insp Rept 50-397/94-14.Corrective Action:Transmitter Has Been Replaced Preventing Recurrence +
- L-94-139, Application for Amend to License NPF-16,proposing TS Upgrading TS 3/4.7.1.6 for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants +
- L-94-191, Application for Amends to Licenses DPR-67 & NPF-16,revising Ts,Implementing Enhancements Recommended by GL 93-05 Re line-item TS Improvements to Reduce SR for Testing During Power Operation +
- L-94-178, Forwards Revised Evaluation of 930923 Proposed License Amend Request to Revise TS for Independent Safety Engineering Group Re Technical Review Responsibilities +