Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17355A241 +
- ML18152B555 +
- ML18151A211 +
- ML20206G102 +
- ML20205L174 +
- ML20205E182 +
- ML20204C599 +
- ML20204C032 +
- ML20207M756 +
- ML20207K152 +
- ML20207J722 +
- ML20207H455 +
- ML20207H452 +
- ML20207F674 +
- IR 05000321/1998009 +
- ML20207D313 +
- ML20207D110 +
- ML20207C472 +
- ML20207B364 +
- VPN-028-99, Forwards Endorsements 139 to Nelia Policy NF-0225 & 2 to Nelia Policy NW-0602 +
- ML20207A990 +
- ML20207A936 +
- ML20207A923 +
- ML20207A816 +
- ML20207A611 +
- ML20207H095 +
- 2CAN029912, Requests Enforcement Discretion from Requirements of TS Table 3.3-1,Action 2 to Allow Startup & Operation of Unit While Exigent TS Is Processed Re Channel D Detector.Encl Documents Util Position Discussed with NRC on 990223 +
- TAC:L31156 +
- LIC-99-0020, Forwards non-proprietary EPIP Index,Page 1 of 2,rev 31 to EPIP-OSC-1, Emergency Classification, FC-EPF Forms Index, Page 1 of 2, Rev 8 to FC-EPF-14 & Rev 15 to RERP-Appendix a, Rerp. Proprietary Version of Rev 15 to RERP, Included +
- NOC-AE-000433, Forwards Change QA-039 to Rev 13 of Operations QA Plan, Reflecting Next Phase of Organizational Realignment for STP Nuclear Operating Co.Change Does Not Represent Reduction in Commitment of Plan,Per 10CFR50.54(a) +
- NOC-AE-000404, Forwards Revised TS Bases 3/4.2.5,clarifying That Averaging of Only Three Channels Is Min Expected When Verifying DNB Parameter Compliance.Bases Have Been Changed Per 10CFR50.59 +
- NOC-AE-000200, Forwards Relief Request RR-ENG-24 from ASME Section XI Code Table IWC-2500-1,re Performance of Surface Exam on Length of Each Weld of One Pump Casing Among Each Group of Multiple Class 2 Pumps.Nrc Approval Requested by 990901 +
- NPL-99-0086, Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure +
- PY-CEI-NRR-2363, Forwards Semiannual fitness-for-duty Program Performance Data for Perry NPP for 980701-1231,IAW 10CFR26.71(d) +
- PY-CEI-NRR-2366, Forwards 1998 Annual Rept for Perry Npp,Unit 1. During 1998 No ECCS Errors,Model Changes or Silicone Sealant Insps Were Performed +
- ML20207H978 +
- ML20207D225 +
- TAC:MA4826 +
- ML20207M388 +
- ML20207J428 +
- ML20207H713 +
- 05000220/LER-1999-001, :on 990125,noted That Plant Operated Outside Design Basis Due to Failure to Revise Satellite pre-fire Plans.Satellite Copies of pre-fire Plans Were Revised & Procedure Re pre-fire Plans Was Revised.With +
- ML20207H056 +
- ML20207J447 +
- ML20207J131 +
- ML20207H476 +
- ML20207H876 +
- ML20207J412 +
- ML20207L488 +
- ML20206A464 +