Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Press Release-93-050, NRC Public Workshop on Elimination of Marginal Requirements Set for April 27-28 +
- ML17349A826 +
- ML17349A823 +
- ML19342B024 +
- ML20045D739 +
- ML20044D147 +
- ML20044D144 +
- ML20056G548 +
- ML23151A513 +
- ML20057C754 +
- ML20056G763 +
- ML20056G754 +
- ML20056E950 +
- ML20056E941 +
- ML20138H231 +
- ML20044H341 +
- ML20044F943 +
- ML20044F945 +
- ML20044F936 +
- ML20044E842 +
- ML20044F006 +
- ML20044E861 +
- ML20044D838 +
- ML20044E928 +
- ML20044C679 +
- ML20045A384 +
- ML20044E780 +
- ML20035H646 +
- IR 05000416/1993005 +
- B14457, Comment Opposing Proposed Draft GL, Availability & Adequacy of Design Basis Info +
- 05000327/LER-1993-008, :on 930326,determined That Flow Switches Controlling Operation of Emergency Gas Treatment Sys Decay Cooling Valves Not Calibr Since Apr 1993.Caused by Personnel Error.Instruction Revised +
- IR 05000334/1993005 +
- 05000336/LER-1993-006, Corrected LER 93-006-00:on 930324,determined That Svc Water Supply Piping to Switchgear Room Coolers X-181A & X-181B Did Not Meet TS Structural Integrity Requirements.Caused by Personnel Error.Clamp Installed +
- L-93-015, Forwards Revs & Corrected Pages to C-E Physical Security Plan for Windsor Nuclear Fuel Manufacturing Facility.Encls Withheld Per 10CFR2.790(d) +
- B14447, Application for Amend to License DPR-61,revising Shutdown Margin Requirements to Change Cladding from Stainless Steel Clad Core to Zircaloy Cladding in Support of Cycle 18 Operation +
- ML20035H261 +
- IR 05000348/1993004 +
- 05000456/LER-1993-004-05, :on 930328,quadrant Power Tilt Ratio Calculated Using Three Operable power-range Channels Instead of Four Channels Required by Ts.Caused by Personnel Error. Personnel Counseled Re Performance +
- BSEP-93-0060, Responds to NRC Re Violations Noted in Insp Repts 50-324/93-08 & 50-325/93-08.Corrective actions:PLP-20 Will Be Revised to Address Hydrostatic Test Requirements After Repairs/Replacements of FPS Components +
- IR 05000306/1993001 +
- B14428, Provides Final Test Results,Contained in Encl WCAP-13630, Evaluation of Upper Shelf Energy Behavior of Two Nozzle Shell Plates in Connecticut Yankee Reactor Vessel, Per Suppl 1 to GL 92-01 +
- IR 05000057/1993001 +
- IR 05000457/1993013 +
- IR 05000456/1993004 +
- ML20035H476 +
- ML20035G932 +
- ML20035G554 +
- ML20035H644 +
- RC-93-0102, Forwards SG F* & L* Rept,Consisting of Listing of Tubes in Which F* & L* Criteria Applied Subsequent to Seventh Inservice Eddy Current Exam.Exam Performed on 100% of Available Tubes in Hot Leg Tubesheet Region +
- ML20035H669 +