Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17311B323 +
- ML17311B322 +
- ML17311B319 +
- ML17311B318 +
- ML17311B316 +
- ML18065A361 +
- ML18152A057 +
- ML20099L802 +
- ML20099L783 +
- ML20099L714 +
- ML20099L706 +
- ML20096C658 +
- ML20096A299 +
- ML20095K470 +
- ML20095K405 +
- ML20095J722 +
- ML20095J646 +
- ML20095J634 +
- ML20095J542 +
- ML20095J434 +
- ML20095J416 +
- ML20095J410 +
- ML20095H788 +
- ML20095H721 +
- ML20095H682 +
- ML20095H472 +
- ML20107J996 +
- ML20134J494 +
- ML20236U939 +
- ML20217P045 +
- RBG-42311, Responds to RAI Pertaining to LAR 95-04,Changes to TS Re Fuel Handling Accident Conditions +
- RC-95-0319, Forwards Response to NRC Re Violations Noted in Insp Rept 50-395/95-17.Corrective Actions:Mechanical Adjustments to Dampers within Ventilation Sys Have Been Corrected +
- RBG-42295, Forwards Rev 17 to River Bend Station Physical Security Plan,Per 10CFR73.21(p).Plan Withheld +
- RC-95-0312, Responds to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves +
- TAC:M92198 +
- BVY-95-137, Advises of Intention to Implement Formal Industry Position on Severe Accident Mgt by 981231 +
- RBG-42212, Responds to 950831 SALP Rept for 940131 - 950729.Util Agrees W/Observations That Performance Improved in All Four Functional Areas +
- 3F1295-23, Outlines Results of 951215 Meeting Re TS Change Request 203, Rev 0 Re Small Vol Eddy Current Indication Disposition +
- RC-95-0314, Requests Relief from Performing Reactor Vessel Nozzle Exams Per Schedule Required by 1989 ASME Section XI Code +
- RC-95-0315, Requests Relief from ASME Section XI Requirements for Class 1 & 2 Unsulated Pressure Retaining Bolted Connections Which Receive VT-2 Visual Exam During Performance of Sys Pressure Testing +
- RBG-42308, Forwards Summary Rept of NOUE Declared at Facility on 951219 Due to Unidentified Drywell Leakage Increase Above TS 3.4.5 Limit of 5.0 Gpm.Leak Secured & NOUE Terminated +
- BSEP-95-0649, Informs of Withdrawal of Request & Plans to re-examine Need for TS 3.0.4 Exemption to Spec 3/4.8.1.1 as Part of Project for Converting to BWR-4 Improved TS +
- U-602532, Final Part 21 Rept 21-95-018 Re Failure of Power Shield Type SS-13 Solid State Trip Devices (Sstd) Mfg by Asea Brown Boveri,Ite,Gould & Brown Boveri.Util Inspected & Reworked,As needed,12 Type SS-13 Sstds in safety-related Breakers +
- L-95-030, Forwards Unit 2 Refueling 21 ISI Summary Rept for Form NIS-1 +
- RC-95-0313, Special Rept Spr 950003:on 951121,noted That Hydrostatic Pressure Testing & Flow Verifications Had Not Been Conducted for Test Performed in 1991 & 1994.Changed Task Description on Surveillance Task Sheet +
- PY-CEI-NRR-2009, Forwards Tech Spec Re Replacement of Selected Analog Leak Detection Sys Instruments W/Ge Numac Leak Detection Monitors +
- ML20265C535 +
- ML20265C540 +
- ML20265C590 +
- ML20265E679 +