Forwards Quarterly self-monitoring Repts for Pnpp Sanitary Waste Sys for Months of Sept,Oct & Nov.All Required Samples Collected & Analyzed in Accordance w/self-monitoring Program
ML20095H788
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/20/1995
From: Shelton D
CENTERIOR ENERGY
To: Long G
OHIO, STATE OF
Shared Package
ML20095H790 List:
References
PY-CEI-LCDU-003, PY-CEI-LCDU-3, NUDOCS 9512260175
Download: ML20095H788 (1)


Text

y a

h CENTERIOR ENERGY PERRY NUCLEAR POWER PLANT Malt Address: Donald C. Shelton 0

10 CENTER ROAD SENIOR VICE PRESIDENT RR , O 10 44081 PERRY, OHIO 44081 NUCLEAR (216) 259-3737 December 20, 1995 PY-CEI/LCDU-0034L Attention: Mr. Gary Long Hentor Waste Facility Lake County Department of Utilities P.O. Box 490 Painesville, Ohio 44077-0490 Gentlemen:

Enclosed are the Quarterly Self-Monitoring Reports for the Perry Nuclear Power Plant sanitary vaste system for the months of September, October and November. All required samples were collected and analyzed in accordance with the self-monitoring program. ,

Also enclosed, are the results from an isotopic analysis. These results reflect a known medical treatment.

If you have questions or require additional information, please contact l Donna Tizzano at (216) 280-5514.

Very ly yours, Q) (,

DCS:DGT:vh Enclosure cc NRC Project Manager NRC Resident Inspector Office NRC Document Control Desk NRC Region III 2200Ga O

Opero'ing Compon es C* * "d E '*C '"C '"""' " " fl foieco Ea s " 9512260175 951220 PDR ADOCK 05000440 R. . . -PDR_