,g f
GPU Nuclear Corporation e gs One Upper Pond Road wMu Parsippany, New Jersey 07054 201-316-7000 TELEX 136-482 Writers Direct Dial Number.
December 20,1995 6000-95-2829 C321-95-2374 U. S. Nuclear Regulatory Commission
' Attention: Document Control Desk Washington, DC 20555 Gentlemen:
Subject:
Oyster Creek Nuclear Generating Station (OCNGS)
Docket No. 50-219/ License No. DPR 16 Long Range Planning Program (LRPP)
Annual Update of Integrated Schedule "ABC" Projects Listing (Revision 1)
Pursuant to condition 2.C.(10) of Operating License DPR-16, GPU Nuclear has implemented the Long Range Planning Program for OCNGS. As required by Section V.A of the Plan, the following attachments are submitted to provide the annual project list update:
1.
Attachment A contains a new project list of Category A, B and C projects, annotated by an asterisk (*) to identify new projects. Completed projects have been removed from the schedule listing. Also noted by a double asterisk
(**) are budget activity numbering changes.
2.
Attachment B contains a summary of Category A, B, and C projects which have been completed, deleted, deferred, changed in scope. Category A and B projects which have had schedule changes are provided with explanations, as appropriate.
This letter and schedule supersede the letter and schedule dated December 13, 1995.
nm
<<C040 951227'0216 951220 PDR ADOCK 05000219
_ P_
, _. _ _ fDR,_
g GPU Nuclear Corporation is a subsidiary of General Pubhc Utilities Corporation g
t December 20,1995 6000-95-2829 C321-95-2374 Page 2 Pursuant to the LRPP for Oyster Creek, it will be assumed that you are in agreement with the actual Category B changes above if you do not respond to this submittal within 15 days of receipt.
Sincerely, 4
/
R. L. Long Vice President and Director Services Division RLUGMG/ pip cc:
Director, Project Directorate 1-4 Oyster Creek NRC Project Manager Region I, Administrator Senior NRC Resident Inspector, OCNGS 4
4 8
4
ATTACIIMENT A PROJECT LISTING INTEGRATED SCHEDULE ANNUAL UPDATE (DECEMBER 1995)
OYSTER CREEK PROJECT LI ST I NC
--- = = - -
- - - - - =-_=----.- __..-__...-_........____
i LEGEMD NRC I NTEGRATED SCHEDULE NEW PROJECTS
=
=-- -------------------
- ** BA NUMBER CHANGE CATEGORY
'A' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 12/20/1995
... _ _ _ _ _ _. _ - - - ---....... ____________----______..._---_......._________.-_-_____=_-- - --== __......._________ ___.--...__._-.
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 1 409791 SECURITY INTRUSION PROTECTION UPGRADE 15 NRR UPGRADE THE SECURITY SYSTEM AS A RESULT OF THE TMI-1 INTRUSION i
1 Y
k l
t b
5 t
3 N
k G
e e
O E
w w
o-
+--.
. ~. - -. --
f OYSTER CREEK' PROJECT LiSTlQG LEGEND-NRC I NTEGRA~TED SCHEDULE' MEW PROJECTS
- BA MUMBER CHANGE CATEGORY
'B' PROJECTS l
SORT BY CATEGORY / CYCLE /BA STATUS AS OF 12/20/1995
....--.---------.=_ =- =--==____ = =---==.-
-=--------...-- _-.-- __=_--
-==.......-- =_==_...
' OBS. BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS
- - - - - -. - - - - - - - - - - - - - - - - - - - -... - - _ _.. - - - - - - - - - - - - - - - - - - - -... _ _ _ = _ = - - - = _ _ = = - -. - - - - - - - - -..
.-- -------===-- _ -- --.--.= ---. _...
2 3?3030.
CNTL RM HUMAN FACTORS DESGN REVIEW
'14/15 NRR CR REPAINT, REFURBISH & RELABEL CR PANELS 1R THRU 10R,6XR,11XR,12R,1?XR,14R,14XR, 16R AND 11F,9XR&11R.NUREC 0737 SUP 1.
3 328226 SQUG PROGRAM IMPLEMENTATION 14/15 NRR ESTABLISH SEISMIC QUALIFICATION FOR OYSTER CREEK. SCOPE INCLUDES WALKDOWNS IN OUTAGE 15R AND EVALUATIONS l
4 328382 RX. VESSEL INTERNAL INSPECTION - 16R 16R NRR l
VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES w
5 328393 16R OUTAGE ISI & RCS AUGMENTED IGSCC INS 16R NRR INSPECT HANGERS, PIPING WELD, &
l COMPONENTS PER SECTION XI, AND NUREG 0313 i
6 32XAHD RX. VESSEL INTERNAL INSPECTION -17R 17R
~ NRR l
119 VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES 7 32XAHE RCS AUG-IGSCC INSPECTION - 17R 17R NRR RB DW INSP;ECT PIPING WELDS PER NUREG 0313 REV2 8 32XAHD RX. VESSEL INTERNAL INSPECTION -16R 18R NRR 119 VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES m
,.-e--
OYSTER CREEK P R O J E-C T LISTING
~
.....___=_ - __==-....--------.:.-----.....--..--....
LEGEND NRC INTEGRATED S C H E D U L'E
.NEW PROJECTS
========--------------------------
- BA'MUMBER CHANGE CATEGORY
'B' PROJECTS SDRT BY CATEGORY / CYCLE /BA STATUS AS OF 12/20/1995
........ --........--........ - = - - - - -....
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS
- =..... - -... -........... - -........... - -............ - -.
- - =---====
9 32XAHE RCS AUG-1GSCC 1MSPECT10N - 18R 18R NRR RB DW INSPECT PIPING WELDS PER NUREG 0313 REV2 10 326216 RX. VESSEL BELTLINE INSPECTION 18R NRR 119 UT ACCESSIBLE WELD SEAMS IN THE RPV BELTLINE REGION.lNSPECTIONS WILL BE DONE RMOTELY. ASME SECT. XI REQUIREMENTS l
I G
9 e
.___m,. _ _ - _
OYSTER CREEK PROJECT L iSVlNG
- -.... - - - _ - _ _ _. _=----
._=.....................--
LEGEND NRC I NTEGRATED S C H E D U't E.
.. NEW PROJECTS
= = =-
- =----
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 12/20/1995'
...._ - ---..___===___==____--
CDS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS
__ =---------------------
. - - - - -. - - - - - - - - = _ _ _ _ - - -. - -
= = _ - - - - - -
11 -312000 SPENT FUEL TRANS TO INTERIM STORAGE 15 MRC TRANSFER SPENT FUEL FROM FUEL POOL TO DRY STORAGE FACILITY 12 323704 VALVE RELiAB1LITY MAINTENANCE 15 MRC RB TB DW CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES t
13 402880 OC SPENT FUEL STORAGE CAPACITY EXPANSION 15 ORR i
INSTALL PERIMETER INTRUSION DETECTION SYSTEM (PIDS) AND NUOHMES VAULTS ON PAD 14 403036 SPENT FUEL CASK HANDLING UPGRADES 15 ISM RB PERFORM VARIOUS MODIFICATIONS TO THE 119 OVERHEAD CRANE TO PERMIT THE TRANSFER OF SPENT FUEL TO DRY STORACE 15 403063 REMOVE HIGH RECIRC FLOW SCRAM FUNCTION 15U REL MODIFY RECIRC FLOW MONITORING SYSTEM TRIP STATUS AND RESET MODULES IN CONTROL ROOM PANELS 3R & SR PLUS WIRING CHANGES 16 312600 VALVE RELIABILITY & MAINTENANCE-16R 16R MRC I
PERFORM CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES, OPEN & INSP. CHECK VALVES, PERFORM CM ON VLVES FAILINC LLRT 17 312600 CRD HCU REBUILD - 16R 16R MRC REBUILD *iYDRAULIC CONTROL UNITS 9
9 O
e rm-m
I-1 OYSTER CREEK. PROJECT L I ST I NC i
i LEGENO NRC 1 NTEGRATED-SCHEDULE' NEW PROJECTS
===--------------------------
- . BA NUMBER CHANGE CATEGORY
'C' PROJECTS SORT BY-CATEGORY / CYCLE /BA STATUS AS OF 12/20/1995'
.----------------------------------==-== =
-=.----- ---------------- ------
=---------- -------------------------------
OBS.
BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS
- - - - - - - - -. - - - - - - - - - - - - - - - - -...... - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - = - - - = - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
-.18 32F245 DRYWELL SCAFFOLD & INSULATION 16R GWC DW RB23 YARD INSTALL SCAFFOLD IN THE D.W. TO SUPPORT ALL ACTIVITIES. REMOVE / REINSTALL SCAFFOLD. REMOVE / REINSTALL INSULATION 19 323747 16R TURBINE OVERHAUL PROJECT 16R MRC TOF TBB CBAY LOB INSP, #4 SV&CV, #2 CRV, CONTROL SYST. TUNEUP, MS AND RHTR INSP, PERFORM MINOR INSP/REPRS, REPLACE LP-C 20 323748 REFUEL FLOOR RX DISASSEMBLY / REASSEMBLY 16R MRC 119' TASKS ASSOCIATED W4TH REACTOR DISASSEMBLY AND REASSEMBLY AND SUPPORTING ACTIVITIES 21 328381 PIPE WALL THINNING-16R SCOPE DEVELOPMENT 16R ISM REMOVE INSULATION, PREP SURFACES &
PERFORM UT ON SELECTED PIPING SYSTEMS, POSSIBLE REPLACEMENT OF FITTINGS / PIPING 22 328383 EDG UNIQUE MAINTENANCE 16R MRC DCB FOR EDG-1 & EDG-2 BATTERY DISCHARGE TEST FAN BLADES, BEARINGS AND ARMS, INSTALL REPLACEMENT RELAYS & PLENUM DRAINS.
23 402821 RX RECIRC PUMP & MOTOR VIBRATION MONITRS 16R MRC DW RB COMPLETE WIRING INSTALLATION INSIDE DRYWELL AND INSTALL CABLE AND DATA COLLECTION SYSTEM OUTSIDE THE DRYWELL 24 403024 SQUG MODS 16R NRR ALL IMPLEMENT MODS RESULTING FROM SQUG WALKDOWN IN 15R.
a r
w
m.._ - - _.
OYSTER CREEK PROJECT LiSTI NG
- - - - - - -. - - - - - - - = =.... - - - - - - - - - - - - - - -............ - - - - -
LEGEND NRC I NTEGRATED SCHEDULE
,NEW PROJECTS
==--===-------------------------------
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATECORY/ CYCLE /BA STATUS AS OF 12/20/1995-
_----=
- - -.... - - - - =..------------------------- ---.---__....-
______=.-----------.--....--_-=------
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS
--- ---=--=-
_....-...--.==_
_ = - - - - - _. -
25 403053 UPGRADE MSIV LIMIT SWITCHES 16R REL MOOlFY AND REPLACE THE MSIV LIMIT SWITCHES TO IMPROVE RELIABILITY.
26-403060 DEAERATING STEAM SYSTEM RETIREMENT 16R HRP CBAY CR TBB CUT & WELD CAPS IN THE DEAERATING STEAM LINE AT SEVEN LOCATIONS. THIS WILL REQUIRE 1-6", 3-8" AND 3-1" CAPS WELDED 27 403075 LP-C REPLACEMENT TURBINE ROTOR 16R MRC TOF TB PROCURE NEW LP-C TURBlME ROTOR AND PERFORM MINOR MODIFICATIONS AS NECESSARY 28 403079 GENERIC LETTER 89-10 16R MODIFICATIONS 16R ISM INSTALL MODS TO ENHANCE MOV CAPABILITY 29 408957 VALVE REPLACEMENT / RETIREMENT-16R 16R REL RB' TB CBAY DW REPLACE SELECTED V*iVES IDENTIFIED AS HAVING DEFICIEW lES INCLUDING 2 EMRVS &
2 SRVS. RF NSTALL REFURBISHED VALVES 30 312000 SPENT FUEL TRANS TO INTERIM STORAGE 17 MRC TRANSFER SPENT FUEL FROM FUEL POOL TO DRY STORAGE FACILITY 35 312600 VALVE RELIABILITY & MAINTENANCE-17R 17R MRC PERFORM CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES e
e
- -. -. ~.
r OYSTER CREEK PROJECT LIST l CG
_ = = = = - - - = - - - = - _ _
_====_- - _ - _ ~
LEGENO-NRC i NTEGRATED SCHEDULE NEW PROJECTS
-- ---------==---== --- ---
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 12/20/1995
.--------.----------------------------------------------=-- --. _. - = - = = = = = - - - - - - - - - - - - - - - - - - - -. - - - - - - - - - - - - - - - - - - - -
CBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS
--...----....................---------... -----. --.------------------------------- ---==-
=
32 312600 CRD HCU REBUILD - 17R 17R MRC REBUILD HYDRAULIC CONTROL UNITS 33 323LO3 TURBINE INSP.-17R 17R MRC TB INSPECT MISCELLANEOUS TURBINE RELATED COMPONENTS FOR NML REQUIRENENTS AND MANUF. SUGGESTION 34 323748 REFUEL FLOOR RX DISASSEMBLY / REASSEMBLY 17R MRC 119' TASKS ASSOCIATED WITH REACTCR DISASSEMBLY AND REASSEMBLY AND SUPPORTING ACTIVITIES 35 326L15 DRYWELL SCAFFOLDING & INSULATION-17R 17R GWC DW INSTALL SCAFFOLD IN D.W. TO SUPPORT ALL ACTIVITIES. REMOVE & REINSTALL D.W.
INSULATION. REMOVE SCAFFOLD 36 32696G OUTAGE ISI 17R NRR ALL INSPECT HANGERS, PIPING WELD,&
COMPONENTS TO SATISFY SECTION XI REQUIREMENTS 37 328378 PlPE WALL THINNING - 17R 17R ISM REMOVE INSULATION, PREP SURFACES &
PERFORM UT ON SELECTED PIPING SYSTEMS.
POSSIBLE REPLACEMENT OF FITTINGS / PIPING 38 408957 VALVE REPLACEMENT / RETIREMENT-17R 17R REL RB TB CBAY DW REPLACE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENCIES e
4 6
m OYSTER CREEK PROJECT LiSTI NG
- -. - - -. - - - - - =
-=______ _==---- --- --------
LEGEND NRC i NTEGRATED SCHEDULE NEW PROJECTS
- BA NUMBER CHANGE CATEGORY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 12/20/1995
- - - - - - - -. - - - - -....... - - = - - - - _-_====_--==--- ---------...----=-
.....- -------- -_=__=_ _=----- __------ _--
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUPEER YEARS
. - - - - = - _ _ _ - - - - - - - - -
====----------==_-_-==...==__
=.. --==-
-39 312600 VALVE RELIABILITY & MAINTENANCE-18R 18R MRC
-PERFORM CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES 40- 312600 CRD HCU REBUILD - 18R 18R MRC REBUILD HYDRAULIC CONTROL UNITS 41 323LO3 TURBINE INSP.-18R 18R MRC TB INSPECT HP AND 1.PA AND OTHER TURBINE RELATED COMPONENTS FOR NHL NML REQUIREMENTS AND MANUF. SUGGESTION 42 323748 REFUEL FLOOR RX DISASSEMBLY / REASSEMBLY 18R MRC 119' TASKS ASSOCIATED WITH REACTOR
' DISASSEMBLY AN9 REASSEMBLY AND SUPPORTING ACTIVITIES 43 326L15 DRYWELL SCAFFOLD 1NG & INSULATION-18R 18R GWC DW INSTALL SCAFFOLD IN D.W. TO SUPPORT ALL i
ACTIVITIES. REMOVE & REINSTALL D.W.
INSULATION. REMOVE SCAFFOLD t
44 32696G OUTAGE ISI 18R NRR ALL INSPECT HANGERS, PIPING WELD,&
COMPONENTS TO SATISFY SECTION XI REQUIREMENTS 45 328378
- 6 PIPE WALL THINNING - 18R 18R 1SM REMOVE INSULATION, PREP SURFACES &
PERFORM UT ON SELECTED PIPING SYSTEMS.
POSSIBLE REPLACEMENT OF FITTINGS / PIPING 4
e e
2 i
4 e
..~
~
~.
. ~..
I
~
OYSTER CREEK. PROJECT LiSTI NG
- -=----- ----------------------------------
l LECEND NRC i NTEGRATED SCHEDULE NEW PROJECTS
- = -
l-
- . BA NUMBER CHANGE l
CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 12/20/1995
= = _ - - _-_------------_- ------
_ -- ------------_----..==---
= - - - - - - - - - - - -. - _ _ - - = _ _ - - - _ - - - - - -
==.------------_
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 46 408957 VALVE REPLACEMENT / RETIREMENT-18R 18R REL RB TB CBAY DW REPLACE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENCIES 47 402980 CONFIGURATION MANAGEMENT-DBD 92-2000 92-00 ISM DEVELOPMENT OF OC SYSTEM DES *GN BASES 48 328148 0.C. PLANT LIFE ASSURANCE & EXTENSION 92-95 REL-DEVELOP 3-PHASE PLEX PLAN. PHASE 1 TO DETERMINE FEASIBILITY AND COST /
ANALYSIS FOR LIFE CYCLE MANAGEMENT.
49 402982 INDIVIDUAL PLANT EXAM. - EXTERNAL EVENTS 92-95 NRR PERFORM IPE ANALYSIS OF EXTERNAL EVENTS FOR SEVERE ACCIDENT VULNERABILITIES BY 6/30/95, BUT NO LATER THAN 12/22/95 50 328370 VESSEL & INTERNALS PROJECT (BWR VIP) 94-96 NRR EVALUATE THE REACTOR AND INTERNALS FOR POTENTIAL CRACKING AND DEVELOP METHODS FOR INSPECTION /MITIGATlON/ REPAIR 31 409280 REPLICA SIMULATOR MODS 95 NRR UPGRADE THE SIMULATOR TO MATCH PLANT MODS AS APPLICABLE 52 328148 OYSTER CREEK LIFE ASSURANCE /LIC. RENEWAL 95-00 REL PHASE 2 - PREPARE LICENSE RENEWAL APPLICATION TO BE COMPLETED 1999/2000 4
e
-e x--. -
-s
~
I OYSTER' CREEK : PROJECT LIST I NG
_ _ _ _ _. = = - - -
l I
LEGEND ~
f NRC 1 NTEGRATED SCHEDUiE NEW PROJECTS
.--_-_-_. ---===_.____.... ___. ___-..____.
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT'BY CATEGORY / CYCLE /BA STATUS AS OF 12/20/1995
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _... - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - -.. _ _ _ _ -. - = = - -. _ _ _ = -
=___..... ________.. _________..._____. __. -
OBS-BA DESCRIPT1ON-CYCLE /
CLASSIFICATION l
NUMBER.
YEARS
==--- ___..__________
_=====...=-
=
__=_----.___________
53.30996D
. REPLICA SIMULATOR MODS 96-00 NRR 4
UPGRADE THE SIMULATOR TO MATCH PLANT MODS AS APPLICABLE 9
t a
9 4
4 e
" ~ *-
e
ABC Classifications I
a)
Meet NRC Reauirements (NRR) - Activities that a) must be carried out to fulfill
- specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished would result in an NRC non-compliance even though the specific activity is not required by the NRC.
b)
Meet Environmental Reauirements (ERR) - Activities that a) are specifically required by environmental regulatory agencies (State and Federal) or b) have been committed to environmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency.
c)
Meet Other Reauirements (ORR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company is committed or if not accomplished would result in a violation of that ordinance, code or guidance, court order, etc.
d) increase Safety Margins (ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety but are neither required for regulatory compliance nor required by safety regulations, codes or guidance.
e)
Decrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes or guidance.
f)
Imorove Radiological Conditions (RAD) - Activities that, if implemented, will result in
. improved radiological conditions, lower man-rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by radiological regulations, codes or guidance.
g)
Maintain Reliability / Capability (MRC) - Activities that, if implemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment, includes activities in response to national codes and standards, insurance policies, equipment vendor specifications or nuclear industry high unavailability j
equipment data without which the plant could not operate prudently.
h)
Imorove Reliability / Capability (REL) - Activities that, if implemented, will increase power generation by improving availability or capacity factor to maximize energy output.
l w-w w -
\\
j ABC Classifications (continued) i)
Imorove Operational Effectiveness (IOE) - Activities that, if implemented, will improve staff efficiency or provide a direct economic payback in terms of reduced i
operating / maintenance costs.
j)
Improve Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities.
k)
Provide Contingency / Blanket (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.
1)
Imoroves Heat Rate Performance (HRP) - Activities, that, if implemented, will increase power production by enhancing the heat rate efficiency.
m)
General Working Conditions (GWC) - Activities, tools, and equipment that if implemented will improve working conditions, but will not demonstrate a direct economic payback, l
ATTACHNENT B OYSTER CREEK NUCLEAR GENERATING STATION NRC INTEGRATED SCHEDULE AltlUAL UPDATE CATEGORY "A" PROJECTS l
j COMPLETIONS:
None i
i SCHEDULE CHANGES:
None 4
i
l CATEGORY "B" PROJECTS
. COMPLETION!:-
315302 SEP Topic III-l 328205 SQUG Support & Participation - BWROG 328312 MOV. Program t
i l
OTHER CHANGES:
328370 Vessel & ' Internals Pro.iect (BWR VIP)
This project is being changed from a Category "B" to Category "C" because the project does not meet the description of a Category "B"
- project, i.e.,
no l
specific commitments have been made to the NRC by GPUN, as defined in the revised Long Range Planning Program i
approved by the NRC. However, any generic standards or criteria approved through the BWR VIP will become program commitments and will be reported in the ILS process.
328382 Reactor Vessel Internal Insoection - 16R l
B/A number was changed from 32XAHO to 328382.
328382 Reactor Vessel Internal Insoection - 16R 328AHD Reactor Vessel Internal Insoection - 17R 328AHO Reactor Vessel Internal Insoection - 18R These three projects are being changed from Category "C"
to Category "B"
based on current inspection commitments through the BWR VIP and subsequent discussions with A. Dromerick on December 19, 1995.
328393 16R ISI & RCS Auamented IGSCC Inspection B/A number was changed from 32XAHE to 328393.
- Also, the ISI scope has been included within this activity.
SCHEDULE CHANGE:
326216 Reactor Vessel Beltline Inspection The schedule for reactor vessel beltline weld inspections has been changed from the 17R to 18R outage to permit more effective utilization of GPUN resources.
Improvements in inspection technology are expected as more plants perform the beltline inspections. The 18R outage is within the 10 year inspection interval, as allowed by ASME Section XI requirements.
~
~
CATEGORY 'C' PROJECTS ADDITIONS:
As denoted by
- next to the Project Title in Attachment A.
COMPLETIONS:
402880 OC Spent Fuel Storage Capacity Expansion, 93-95 402981 Accident Management Guidelines, 93-95 DELETIONS:
323L14 Asbestos Abatement 16R, 17R 402948 Low Pressure Turbine "C" Last Stage Blade Installation OTHER CHANGES: The following B/A numbers have been changed:
PREVIOUS NEW OBS #
IIILE il/.A BZA 11 Spent Fuel Transfer to Interim Storage - Cyc 15 323727 312000 16 Valve Reliability & Maintenance 16R 323L35 312600 17 CRD HCU Rebuild - 16R 323L39 312600 18 Drywell Scaffolding & Insulation - 16R 326L15 32F245 19 16R Turbine Overhaul Project 323LO3 323747 20 Refuel Floor Reactor Disassembly / Reassembly-16R 323L52 323748 21 Pipe Wall Thinning - 16R Scope Development 32XAHA 328381 29 Valve Replacement / Retirement - 16R 408L25 408957 30 Spent Fuel Transfer to Interim Storage - Cyc 17 323727 312000 31 Valve Reliability & Maintenance - 17R 323L35 312600 32 CRD HCU Rebuild - 17R 323L39 312600 34 Refuel Floor Reactor Disassembly / Reassembly-17R 323L52 323748 37 Pipe Wall Thinning - 17R 32XAHA 328378 38 Valve Rep 1acement/ Retirement - 17R 408L25 408957 39 Valve Reliability & Maintenance - 18R 323L35 312600 40 CRD HCU Rebuild - 18R 323L39 312600 42 Refuel Floor Reactor Disassembly / Reassembly-18R 323L52 323748 45 Pipe Wall Thinning - 18R 32XAHA 328378 46 Valve Replacement / Retirement - 18R 408L25 408957 323LO8 Containment Isolation Valve Maint. - 16R.17R.18R Valve Reliability &
This scope is included under 312600 3
Maintenance, l
32696G Outaae ISI - 16R This scope is included under the Category "B" project, 328393 -
l 16R Outage ISI and RCS Augmented IGSCC Inspections.