Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] |
Text
R.Y C) R.IMY' PACCELERATED RIDS PROCESSING mr>>
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9512270002 DOC.DATE: 95/12/20 NOTARIZED: NO DOCKET N FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 p AUTH. NAME AUTHOR AFFILIATION STEWART,W.L. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards revised pages to ISI summary manual for PVNGS Units 1,2 6 3,incorporating comments received 950731 E 0830.
DISTRIBUTION CODE: A047D COPIES RECEIVED LTR ENCL SIZE 0
TITLE: OR Submittal: Inservice/Testing/Relief from ASM Code GL-89-04 NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 PD4-2 PD HOLIAN, B '11 1 THOMAS,C 1
1 1
1 INTERNA 'CR 6 0 AEOD/SPD/RAB 1 1 FILE CgggE 1 1 NRR/DE/ECGB 1 1
/EMCB 1 1 NRR/DE/EMEB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 RES/DET/EMMEB 1 1 RES/DS IR/EIB 1 1 D EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 C
U N
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACI THE DOCUMENT CONTROL DESK, ROOM PI -37 (EXT. 504-2083 ) TO ELIlNIINATE YOUR NAME FROW!
DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 15
P Arizona Public Service PALO VERDE NUCLEAR GENERATING STATION 5801 S. WINTERSBURG ROAD TONOPAH, ARIZONA 85354-7529 WILLIAML.
STEWART'XECUTIVE 102-03571-WLS/SAB/TNW VICE PRESIDENT NUCLEAR December 20, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Reference:
Letter No. 102-02447, dated March 12, 1993, Inservice Inspection Program Summary Manual, from the Arizona Public Service Company to the USNRC
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Inservice Inspection Program (ISI)
Enclosed please find revised pages of the ISI Program Summary Manual for PVNGS Units 1, 2, and 3. The pages of the ISI Program Summary Manual have been revised to incorporate comments received July 31, 1995, and August 30, 1995, via fax from NRR Project Manager, Mr. Charles Thomas. The comments were provided as a result of the NRC review of Revision 1 of the ISI Program Summary Manual. Revision 1 was submitted in the referenced letter and contained three new relief requests, identified as Relief Request Numbers 6, 7, and 8.
Enclosure 1 contains the comments received from Mr. Thomas, followed by Arizona Public Service Company's (APS) response to the comments. Enclosure 2 contains the revised pages of the ISI Program Summary Manual incorporating APS'esponse to the comments.
Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.
Sincerely, WLS/SAB/TNW/rv Enclosures cc: L. J. Callan K. E. Perkins C. R. Thomas K. E. Johnston 9512270002'951220 PDR ADOCK 05000528 9 PDR
'J ENCLOSURE 1 COMMENTS AND RESPONSES TO ISI PROGRAM
SUMMARY
MANUAL
t
~
Comment No. 1:
The licensee submitted three new requests for relief in Revision 1 to the ISI Program.
Based on a review of these requests, it has been determined that in two cases, the licensee has.not provided sufficient information to perform an evaluation. In order to evaluate Requests for Relief 7 and 8, the licensee should describe the applicability of the Code requirement, and how the proposed alternative provides equivalency or provides an acceptable level of quality and safety.,
The licensee has presented this request for relief generically for penetration piping.
The licensee should identify specific lines affected. The licensee should describe the impracticality or burden associated with meeting Code requirements. The licensee should describe the alternative test that is being proposed and describe how it provides either equivalency to the code required test or provides an acceptable level of quality and safety.
The licensee has presented this request for relief generically for Inservice Pressure Tests. The licensee should identify specific lines affected. The licensee should describe the impracticality or burden associated with meeting Code requirements. The licensee should describe the alternative test that is being proposed and describe how it provides either equivalency to the code required test or provides an acceptable level of quality and safety.
Response No. 1:
Relief Request Number 7 requests approval to use 10 CFR 50 Appendix J tests in lieu of hydrostatic pressure tests for designated piping and isolation valves. The relief request is based upon the ability to verify containment integrity through the application of Appendix J criteria. This relief has been approved by the ASME Boiler and Pressure Vessel Code committee and the Board of Nuclear Codes and Standards as ASME Code Case N-522. This Code Case has not, however, been approved and included in the periodic revision to Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability - ASME Section XI Division 1" and therefore needs speciTic NRC approval.'he relief request has been revised to specify which lines are applicable to this relief request. The requirement to perform a hydrostatic test on these lines in addition to the 10 CFR 50 Appendix J test, imposes a burden of duplicate testing. Duplicate testing results in an increase in the total amount of work needed to be performed during plant outages; and increases the radiological exposure without a compensating increase in the level of quality or safety.
i lI
Relief Request Number 8 has been withdrawn.
No comments were provided, nor were any changes made, to Relief Request Number 6.
Comment No. 2:
In Section 3.5 of the ISI Program, the licensee stated that the interval start dates for Units 1, 2, and 3 have been modified to establish a common interval start date. In the Safety Evaluation submitted to the licensee on October 21, 1987, it was determined that the average operating license start date was before October 28, 1986. In the table of start dates provided, the schedules are given as:
Unit 1 01-28-86 to 07-17-98 Unit 2 09-19-86 to 03-17-97 Unit 3 01-08-88 to '01-10-98 The start dates noted above are not common for the three units. Describe the scheduling philosophy currently being implemented and the discrepancy in the common start dates.
The licensee provided tables only, of dates to show a common avera'ge start date for the three units. The licensee shows the common commercial operation start date of 3-18-87. This is not consistent with the NRC Safety Evaluation that states that the average Operating License issuance date for PVNGS is before October 28, 1986. It is still unclear how the licensee established the current common start date. Explain the methodology used by APS to support the current common start data given in the table.
Response No. 2:
There are two different sets of dates that are averaged for the ISI Program. The first date is the 5% operating license date for each of the three units. Paragraph 10 CFR 50.55a(g)(4)(i) requires that inservice inspection of components during the initial 120-month inspection interval comply with the requirements of the latest edition and addenda of the ASME Section XI Code referenced in 10 CFR 50.55a(b) on the date 12 months prior to the date of the issuance of the operating license. In order for the PVNGS site to use a single ASME Code for all three units, the average 5% operating license date was used to determine which ASME Code Edition would be used for the first inspection interval. The NRC Safety Evaluation stated that October 28, 1985, was when the ASME Section XI 1983 Edition including Addenda through the Summer of 1983 (83E83S) was incorporated into 10 CFR 50.55a. Operating licenses issued-
subsequent to October 28, 1986 (one year after the ASME code was incorporated into the 10 CFR 50.55a), would be required to use 83E83S Code. The average 5%
operating date for the PVNGS site is in September of 1985. Therefore, since the average 5% operating license date for the PVNGS site is before October 28, 1986, the use of the ASME Section XI 1980 Edition including Addenda through the Winter of 1981 (80E81W) was approved by the NRC with the condition that PVNGS establish a common start date based on the average date of commercial service in accordance with ASME Section XI subparagraph IWA-2400(b).
The second date that was averaged for PVNGS was the date of commercial operation.
The average date of commercial operation for the PVNGS site is March 18, 1987. The actual start date for the first 120-month inspection interval for each Unit was not March 18, 1987, since ASME inspections commenced at the unit specific commercial operation date. Therefore, the table in the ISI program refers to the start of the ISI inspection period, rather than the average site date for commercial operation. The average PVNGS site common start date is identified in the ISI Program as March 18, 1987, and is used in accordance with the Safety Evaluation Report received from the NRC. The end date for the first 120-month inspection interval is not March 17, 1997, in all cases because the Units 1 and 3 end dates were extended due to lengthy outages.
Comment No. 3:
In Relief Request 3, it appears that the licensee has changed the proposed alternative reviewed and approved by the NRC, in the NRC letter dated October 21, 1987 (as referenced in the program relief request). The alternative examination given in the Safety Evaluation states:
"The mechanical and welded attachments will be visually examined to the extent practical. The insulation will be removed from around the support attachment for further examinations whenever I 0 'e rwhnv an abnormality is detected."
The proposed alternative in the ISI program Relief Request 3, states: "The mechanical and welded attachments will be visually examined to the extent practical. The insulation will be removed from around the support attachment for further examinations'henever an abnormality is detected."
Explain the deletion of" from the request for relief.
Note: IWF-1300 (e) states: "where the mechanical connection of a nonintegral support is buried within the component insulation, the support boundary may extend from the surface of the component insulation, provided the support either carries the weight of the component or serves as a structural restraint in compression."
The licensee noted that for Relief Request 3, a typographical error occurred from revision 0 to revision 1. The words left out of Revision 1 are significant. Therefore, the licensee should provide a revision to Relief Request-3 to insure that this relief request is not misinterpreted.
Response No. 3:
Relief Request has been revised to include the phrase "h
'. It was omitted in error.
ENCLOSURE 2 REVISED PAGES OF THE ISI PROGRAM
SUMMARY
MANUAL