Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1991-46, Degradation of Emergency Diesel Generator Fuel Oil Delivery Systems +
- NRC Generic Letter 1991-11 +
- ML17334B402 +
- ML17329A098 +
- ML17325B431 +
- ML17348B041 +
- ML17305B656 +
- ML18096A148 +
- ML20085A735 +
- ML20079D711 +
- ML20079D709 +
- ML20079D685 +
- ML20079D596 +
- ML20076D918 +
- ML20076D910 +
- ML20076D465 +
- ML20076D161 +
- ML20076D048 +
- ML20076D026 +
- IR 05000282/1991011 +
- NLS9100460, Application for Amend to License DPR-46,consisting of Proposed Change 68 to Tech Spec Section 3.2.D.2, Reactor Bldg Isolation & Standby Gas..., Reflecting Planned Design Change for Two Addl Radiation Monitoring Channels +
- B13840, RO Re Potential Failure of LPSI Sys Piping.Evaluation Involving Estimate of LPSI Piping Stress Upstream of LPSI Injection MOVs Performed.Reverse Flow Testing of LPSI Injection Check Valves Will Be Conducted by 1992 Outage +
- 3F0791-13, Notifies NRC of Plans to Utilize Seismic Experience Data to Demonstrate Seismic Adequacy for Future Commercial Grade Replacement Components & sub-components in Safety Related Systems +
- 3F0791-12, Forwards to EPA Re Discharge of Hydrazine from Facility in Aug or Sept 1991.Toxicity Test Will Be Performed to Determine If Hydrazine Can Be Discharged W/O Exceeding Acute Toxicity Limits +
- 3F0791-06, Withdraws Tech Spec Change Request 184,submitted Via .Surveillance Interval Extension for Performing Eddy Current Testing No Longer Needed Since Refuel 8 Schedule Changed from Fall 1992 to Apr 1992 +
- ML20057B386 +
- ML20217N018 +
- 05000352/LER-1991-018-01, :on 910618,automatic Actuations Occurred of Unit 1 Primary Containment & Reactor Vessel Isolation Control.Caused by Inadequate Design.Inverter Inductor Replaced +
- 05000374/LER-1991-004-08, :on 910621,pressure Differential Switch Found Failed.Caused by Diaphram Failure.Cause of Diaphram Failure Unknown.Replacement Switch Installed,Calbr & Functionally Tested Satisfactorily +
- 05000482/LER-1991-010, :on 910509,containment Emergency Escape Air Lock Hatch Closed W/O Having Required Leak Rate Test Performed Due to Inadequate Administrative Controls.Required Leak Rate Test Performed Satisfactorily +
- 05000483/LER-1991-002, :on 910619,tech Spec Violation Occurred Re Blown Fuse for Ultimate Heat Sink Cooling Tower Fan Causing Inoperability of Both Trains of Safety Injection Pumps. Fuses Replaced +
- ML20079D717 +
- B13883, Partially Deleted Ltr Providing Addl Info Re Seismic Qualification of RCS Flow Transmitters Noted in Allegation RI-91-A-187 +
- ML20079D719 +
- ML20036B448 +
- ML20199B154 +
- IR 05000272/1991020 +
- ML18010A339 +
- IR 05000397/1991018 +
- ML17174A818 +
- ML17174A816 +
- IR 05000275/1991007 +
- IR 05000275/1991018 +
- ML16342C277 +
- ML17286A965 +
- ML16341G211 +
- ML16253A268 +
- ML16253A263 +
- ML18010A333 +
- ML17286A958 +