ML20076D465
| ML20076D465 | |
| Person / Time | |
|---|---|
| Site: | University of Virginia |
| Issue date: | 07/18/1991 |
| From: | Benneche P VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20076D470 | List: |
| References | |
| NUDOCS 9107290182 | |
| Download: ML20076D465 (3) | |
Text
.
ulun or ENGINEERING @
& APPLIED SCIENCE l
111 P AMi tfl \\1 of \\liIL IR I Mil \\lI ki\\G d I.XGIN!Ikl\\G TH)3R $
Unischits of Virginiit 1 rl( tt s 11. VA 229tu 2442 U.S. Nuclear Regulatory Commission
""j g [^N""*2 %
Document Control Desk (Emergency Operations Center via Mr. Al Adams)
Washington, D.C.
20555
Dear Sir:
Enclosed please find Revision #13 (dated July 8, 1991) to the University of Virginia Reactor Facility Emergency Plan Implementing Procedures and Revision #2 to the Emergency Plan.
Please acknowledge the receipt and filing of these revisions by returning the completed cover sheet to our facility.
Please also note the change in the phone number for our facility as indicated on the letterhead.
Thank you.
Sincerely, Paul E.
Benneche Reactor Services Supervisor
& J 91O'7290182 91071:::
gg l
F[DR ADOCK 05000662
\\'
. - ~ -. _ _. _ _ _. _ _. _ _ _ _. _
m...._..
_. _._..m_..
N UNIVERSITY OF VIRGINIA.
RECEIPT FOR REVISION -f#13 TO' Tile UNIVERSITY OF VIRGINIA REACTOR FACILITY EMERGENCY PLAN IMPLEMENTING FROCEDURES AND REVISION-#2 TO Tile-UNIV, OF VIRGINIA REACTOR FACILITY EMERGENCY PIAN DATED: JULY 8, 1991 DATEIRECEIVED:
DATE FILED IN EPIP MANUAL:
SIGNATURE:
NAME-PRINTED:
-TITLE OR POSITION:
AFFILIATION:
' COPY NUMBER:
.Please not'e that'your copy of the Emergency Procedures may1not include the Emergency Plan. -Please make Revision #2 if.it-does and note _below the presence or' absence of the Emergency Plan,
.Our binder with the UVA EPIP's DOES / DOES NOT (circle) include the UVA EP.
PLEASE COMPLETE AND RETURN TO:
s PAUL E. BENNECllE UNIV OF VA. DEFT, OF NUCLEAR ENGINEERING NUCLEAR REACTOR FACILITY l
CllARLOTTESVILLE, VIRGINIA-22903 2442 p
l l~
9 UNIVERSITY OF VIRGINIA REACTOR FACILITY DIERGENCY PIAN (EP)
AND-EMERGENCY PLN1 IMPLEMENTING PROCEDURES (EPIP)
REVISION #2 TO EP APPROVED BY NRC: MAY 22, 1991 REVISION #13 TO EPIP.
DATED: JULY 8, 1991 MMOVE THE FOLLOWING PAGE NUMBERS AND REP! ACE VITil THE NEW FAGE OF Tile SAME NUMBER Brief summary of chnnne EP Section 8.6,-page 50 Change frequency of calibration of portable instruments EPIP-6,-p. 2 of 4
-update phone list EPIP-6.-p. 3 of 4 update phone list b
_ v. PIP 6, Attach. 1, p. 1 of 2 update phone list s
. EPIP-6, Attach.1, p. 2 of 2 update phone list EPIP-14, Attach.
1,-p. l'of l_
update phone list o
I h
-#f-
.,