Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17262A541 +
- ML17262A540 +
- ML17262A537 +
- ML20024H334 +
- ML20024H087 +
- ML18033B697 +
- ML18057B022 +
- ML18153C619 +
- ML20024H104 +
- ML20024H099 +
- ML20087B803 +
- ML20079B928 +
- ML20079A851 +
- ML20077E433 +
- ML20077E426 +
- ML20077E422 +
- ML20077C370 +
- ML20077C258 +
- ML20077B850 +
- ML20077B845 +
- ML20077B578 +
- ML20077B473 +
- 05000285/LER-1991-003, Informs of Extension of Completion Date for Changing Abnormal Operating Procedures & Emergency Operating Procedures to Resolve Containment Penetration M-3 Potential Leak Path Issue,Per 910306 LER 91-003 +
- ML20073P843 +
- ML20073P109 +
- ML20073N114 +
- ML20073N062 +
- ML20073N044 +
- ML20073M973 +
- ML20073L680 +
- ML20091A148 +
- 3F0591-05, Responds to NRC Re Violations Noted in Insp Rept 50-302/91-01.Corrective Actions:Removal & Replacement of Lifted Lead Documented Prior to Leaving Area & Walkdowns of Cable Spreading Room & Relay Racks Initiated +
- TAC:M77589 +
- L-91-134, Forwards Rev 26 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)) +
- JAFP-91-0289, Responds to NRC Re Violations Noted in Insp Rept 50-333/91-06 on 910311-15.Corrective Actions:Prohibition on Use of Tape to Defeat or Block Open High Radiation Area Gates or Barricades +
- JAFP-91-0292, Forwards Justification for Continued Operation Re Failure of Licensed Operator Requalification Training Program During Exams Administered Prior to Wk of 910429.List of Corrective Actions & Commitments Also Encl +
- RBG-34-977, Forwards Gulf States Util Annual Rept 1990 & Cajun Electric Power Cooperative,Inc Audited Financial Statements +
- 05000423/LER-1991-010, :on 910410,discovered That CO2 Storage Tank Pressure Below TS Limits of 275 Psig.Caused by Pressure Control Switch Coming Out of Adjustment.Fire Patrols Established & Employee Counseled +
- 05000423/LER-1991-011, :on 910410,safety Injection Relief Valve Lifted While Performing Boundary Valve Test Procedure,Causing Inoperability of Both Trains of HPSI Sys.Caused by Relief Valve Leakage.Relief Valve Ungagged +
- 05000498/LER-1991-013, :on 910412,train B ESF Actuation Occurred. Caused by Inadequate Troubleshooting Instructions. Instructions Rewritten,Reviewed,Approved & Performed Successfully +
- 05000499/LER-1991-005-01, :on 910411,ESF Actuation of Control Room Envelope HVAC Trains B & C.Cause Unknown.Addl Root Cause Analysis Using Change Analysis Techniques Performed for This & Similar Actuations +
- 05000320/LER-1991-004, :on 910412,processed Water Disposal Sys Sample Valve Misaligned.Caused by Personnel Error.Addl Training for Evaporator Operators & Rev to Pwds Operating Procedure & Areas of Responsibility Addressed +
- 05000353/LER-1991-007-02, :on 910410,handling of Control Rod Prohibited by Tech Spec Surveillance Requirements 4.9.6.3b.Caused by Inadequate Procedure.Maint Procedure Changed Deleting Provisions to Reposition Mechanical Stop +
- 05000361/LER-1991-007-01, :on 910410,reactor Manually Tripped on Indication of Complete Loss of Controlled Bleedoff from Rcp. Caused by Shift in Position of RCP Rotating Baffle.Baffle Inspected,Repaired & re-installed W/New Bolts +
- 05000373/LER-1991-005-03, :on 910410,determined That Tech Spec Required Surveillance of Suppression Chamber Oxygen Sampling Missed. Caused by Inadequate Review of Tech Spec Change.Drywell & Suppression Chamber Checked for Oxygen +
- 05000313/LER-1991-002-03, :on 910410,inadvertent Actuations of Combined Control Emergency Ventilation Sys Occurred.Caused by Transient Noise Spike.Mod Will Be Completed by 910531 to Install Time Delay in Actuation Circuitry +
- 05000482/LER-1990-026, :on 901123,tech Spec Violation Occurred Re Safety Related Class IE Battery Bank Powered from Spare Battery Charger.Caused by Error in Safety Evaluation for Procedure Mce E051Q-01.Procedure Deleted +
- 05000341/LER-1991-006, :on 910410,balance of Plant Breaker Opened Causing Reactor Bldg HVAC Isolation.Caused by Component Failures.Nprds Search Conducted for Similiar Problems +
- ML20024H008 +
- ML20024H148 +