Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-82-359, Informs That Design of Containment Isolation Actuation Signal Has Been Revised Based on FSAR Review.Design Change Completed & Fully Implemented in Field + (20:37:49, 8 January 2025)
- ML17213A365 + (20:37:51, 8 January 2025)
- IR 05000341/2017007 + (20:38:03, 8 January 2025)
- ML17213A363 + (20:38:04, 8 January 2025)
- L-82-338, Application to Amend App a of License DPR-67.Amend Updates Offsite Mgt Organization to Reflect Recent Corporate Changes + (20:38:05, 8 January 2025)
- ML17213A361 + (20:38:05, 8 January 2025)
- L-82-353, Advises That NUREG-0737,Item II.D.1.B Satisfied by Power Operated Relief Valve Block Valve Info Package & Listed Info + (20:38:07, 8 January 2025)
- L-82-356, Forwards Const/Startup Monthly Status Rept for Jul 1982. Target Fuel Load Date Is 821028 + (20:38:09, 8 January 2025)
- ML17213A351 + (20:38:10, 8 January 2025)
- ML17213A348 + (20:38:11, 8 January 2025)
- L-82-355, Forwards Test Objectives & Results of Fire Stop Test Performed by Swri + (20:38:12, 8 January 2025)
- ML17213A343 + (20:38:14, 8 January 2025)
- ML17213A346 + (20:38:14, 8 January 2025)
- ML17213A341 + (20:38:15, 8 January 2025)
- ML17213A337 + (20:38:16, 8 January 2025)
- L-82-335, Responds to 820513 Request for Addl Info Re Responses to IE Bulletin 80-04, Analysis of PWR Main Steam Line Break W/ Continued Feedwater Addition. No Further Calculations Re Magnitude of Peak Pressure Necessary + (20:38:17, 8 January 2025)
- ML17213A334 + (20:38:19, 8 January 2025)
- ML17213A332 + (20:38:20, 8 January 2025)
- L-82-344, Forwards Bases for Using Containment High Range Radiation Monitor to Estimate Offsite Doses During Emergency,In Response to Div of Emergency Preparedness Request + (20:38:21, 8 January 2025)
- ML17213A325 + (20:38:23, 8 January 2025)
- ML17213A326 + (20:38:23, 8 January 2025)
- L-82-308, Forwards Amend 11 to FSAR + (20:38:24, 8 January 2025)
- ML17213A320 + (20:38:26, 8 January 2025)
- L-82-309, Forwards Amend 12 to FSAR + (20:38:27, 8 January 2025)
- L-82-320, Forwards Addl Info Re Use of Exxon Fuel in Cycle 6.Tech Spec Changes May Be Needed & NRC Approval Required Prior to Cycle 6 Startup.Proposed Changes Expected to Be Submitted No Less than 90 Days Prior to Startup + (20:38:29, 8 January 2025)
- L-82-329, Forwards Addl Info in Response to Question 7 Re Degraded Grid Protection,Per 820419 Request + (20:38:30, 8 January 2025)
- L-82-317, Forwards Addl Info on Containment Purging & Venting, in Response to NRC .Consequences of Even Gross Leakage Would Be Minimal Due to Containment & Bldg Design + (20:38:32, 8 January 2025)
- L-82-327, Advises That Util Will Respond to NUREG-0737,Item II.B.3, Post-Accident Sampling Sys, by 821206 + (20:38:34, 8 January 2025)
- L-82-328, Advises That Future Correspondence Re Engineering Verification Program Will Be Sent Directly from Engineering Verification Task Force + (20:38:36, 8 January 2025)
- L-82-315, Discusses NRC 820217 Request for Addl Info Re Environ Qualification of safety-related Electrical Equipment. Engineering Analysis I-2 in Item 2 Does Not Exist.Repts Withheld (Ref 10CFR2.790) + (20:38:37, 8 January 2025)
- L-82-321, Forwards Revised Response to Question 410.48 Re Associated Circuits.Response Will Be Incorporated Into FSAR in Future Amend + (20:38:39, 8 January 2025)
- ML17213A294 + (20:38:42, 8 January 2025)
- IR 05000254/2017002 + (20:38:48, 8 January 2025)
- ML17213A272 + (20:38:50, 8 January 2025)
- ML17213A266 + (20:38:53, 8 January 2025)
- ML17213A257 + (20:38:54, 8 January 2025)
- ML17213A216 + (20:38:55, 8 January 2025)
- ML17213A210 + (20:38:56, 8 January 2025)
- OI 2-2016-025, IA-2017-061 - NRC Office of Investigations (OI) Report No. 2-2016-025 + (20:38:57, 8 January 2025)
- ML17213A184 + (20:38:57, 8 January 2025)
- ML17213A165 + (20:39:00, 8 January 2025)
- IR 05000445/2017008 + (20:39:06, 8 January 2025)
- ML17213A135 + (20:39:07, 8 January 2025)
- ML17213A140 + (20:39:07, 8 January 2025)
- ML17213A133 + (20:39:08, 8 January 2025)
- ML17213A130 + (20:39:09, 8 January 2025)
- ML17213A097 + (20:39:10, 8 January 2025)
- ML17213A124 + (20:39:10, 8 January 2025)
- ML17213A080 + (20:39:11, 8 January 2025)
- NL-17-1346, VSP-SNC-HTl-17-041, Edwin I. Hatch Nuclear Plant - Unit 1 Cycle 28 Core Operating Limits Report Version 2 + (20:39:12, 8 January 2025)
- NL-17-1347, Submittal of Edwin I. Hatch Nuclear Plant - Unit 1 Cycle 28 Core Operating Limits Report Version 2 + (20:39:15, 8 January 2025)