ML17213A334
| ML17213A334 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/02/1982 |
| From: | Miraglia F Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17213A333 | List: |
| References | |
| NUDOCS 8208170026 | |
| Download: ML17213A334 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-389A FLORIDA POWER
NOTICE OF RECEIPT OF ADDITIONAL ANTITRUST INFORMATION:
TIME FOR SUBMISSION OF VIEWS ON ANTITRUST MATTERS Florida Power 8 Light Company, pursuant to Section 103 of the Atomic Energy Act of 1954, as
- amended, has filed information requested by the Attorney General for antitrust review as required by 10 CFR Part 50, Appendix L.
This information concerns a proposed additional ownership participant, the Florida Municipal Power Agency in the St. Lucie Plant, Unit 2.
Florida Power 8 Light Company and the"Orlando Utilities Commission of the City of Orlando are the current permit holders.
The change involves the transfer of ownership from the Florida Power 8 Light Company to Florida Municipal Power Agency.
The information was filed in connection with the application submitted by the construction permit holders for an operating license for a pressurized water reactor.
Construction was authorized on May 2, 1977, at the St. Lucie 2 site located on Hutchinson Island in St. Lucie County, Florida.
The original application was docketed on September 4,
- 1973, and the Notice of Receipt of Application for Construction Permits and Facility Licenses and Availability of Applicants'nvironmental Report; Time for Submission of Views on Antitrust Matters was published in the Federal
~Re ister on September 21, 1973 (38 F.R. 27106).
The Notice of Receipt of Application for Facility Operating Licenses; Notice of Availability of Applicant's Environmental Report>
8208170026 820802 PDR ADQCK 05000389 N
and the Notice of Consideration of Issuance of Facility Operating License and Notice of Opportunity for Hearing was published in the Federal
~Re ister on March 9, 1981 (46 F.R. 15831).
A copy of the above documents are available for public examination and copying for a fee at the Commission's Public Document
- Room, 1717 H Street, N.
W. Washington, D.
C. 20555 and at the Indian River Community College Library, 3900 Virginia Avenue, Ft. Pierce, Florida 33450.
Any person who wishes to have his views on the antitrust matters with respect to the Florida Municipal Power Agency presented to the Attorney General for consideration or who desires additional information regarding the matters covered by this notice, should submit such views or requests for additional information to the U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention:
Chief, Antitrust and Economic Analysis Branch, Division of Engineering, Office of Nuclear Reactor Regulation, on or before October 15, 1982.
Dated at Bethesda, Maryland, this 2ndday of
- August, 1982.
FOR THE NUCLEAR REGULATORY COMMISSION Frank J.
ir gl, Chief Licensing Branch No.
3 Division of Licensing
I y t
UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-389A FLORIDA POWER 8 LIGHT COMPANY, ET. AL.
NOTICE OF RECEIPT OF ADDITIONAL ANTITRl)ST INFORMATION-TIME FOR SUBMISSION OF VIEWS ON ANTITRUST MATTERS Florida Power 8 Light Company, pursuant to Section 103 of the Atomic Energy Act of 1954, as
- amended, has filed information requested by the Attorney General for antitrust review as required by 10 CFR Part 50, Appendix L.
This information concerns a proposed additional ownership participant, the Florida Municipal Power Agency in the St. Lucie Plant, Unit 2.
Florida Power 8 Light Company and the Orlando Utilities Commission of the City of Orlando are the current permit holders.
The change involves the transfer of ownership from the Florida Power 8 Light Company to Florida Municipal Power Agency.
The information was filed in connection with the application submitted by the construction permit holders for an operating license for a pressurized water reactor.
Construction was authorized on May 2, 1977, at the St. Lucie 2 site located on Hutchinson Island in St. Lucie"County, Florida.
The original application was docketed on September 4,
- 1973, and the Notice of Receipt of Application for Construction Permits and Facility Licenses and Availability of Applicants'nvironmental Report; Time for Submission of Views on Antitrust Matters was published in the Federal Register on September 21, 1973 (38 F.R. 27106).
The Notice of Receipt of Application for Facility Operating Licenses; Notice of Availability of Applicant's Environmental Report; and the Notice of Consideration of Issuance of Facility Operating License and Notice of Opportunity for Hearing was published in the Federal
~Re ister on March 9, 1981 (46 F.R. 15831).
A copy of the above documents are available for public examination and copying for a fee at the Commission's Public Document
- Room, 1717 H Street, N.
W. Washington, D. C. 20555 and at the Indian River Community College Library, 3900 Yirginia Avenue, Ft. Pierce, Florida 33450.
Information in connection with the anti trust review of Florida Municipal Power Agency may be obtained by writing to the U. S. Nuclear Regulatory-Commission, Washington, D.C. 20555, Attention:
Chief, Antitrust and Economic Analysis Branch, Division of Engineering, Office of Nuclear Reactor Regulation.