ML17213A361

From kanterella
Jump to navigation Jump to search
Facility Organization & Onsite Organization
ML17213A361
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/11/1982
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17213A359 List:
References
NUDOCS 8208230383
Download: ML17213A361 (5)


Text

Nllpleaz Services FIRE PAOTECTION AONINISTR4TION 1

Serv ces a@i L . II@3.ear HEAI.TH PHYSICS SPECI4LIST Pl MfNTTNMCC TtQIN1 CIN. NONltltfNN'lift OVNLTTT CONTNOL OPCNN'f1ONC

~ LPCN I NTCNOCNT ofNtr NttfCTNNT CTNPP OVttN 1 4 fCNOQIT SRO NNO ~ VPCNINTCIQCNT ~ VPCN1NftIOCNT NCNLTN CtCVNlff CNQI1tfNT ttftlCC OPCMTT ONC 1 M141NO NCNCT ON CONTNOL

~TNT QNCNT CLCCTN1CNL NNT NfCNNNIC NCCNNI COL Mf NTCMNCC COP QIT 1 OCN QPCNT 1 CON QPCNT 1 CON CVtt Cf 1 CON Qrttf I CON QPCNTl CON OI I

C:

CI m SAO CNCINCCNO CNC 1 NCCNC CM1NCCNC CNC 1 Nt TNO t

1 CCNN 1 lNNO QIC TNT ttt TCCl1ClNNC CNOllflttt TCQNI1CTMC NNO TCCNNTCTMC MO TCQNIICTMC PLMT f

CVPCN 1 COC NNO TCCNNTCTMC C

X

'1

/S ctlcr MfNTCNNNCC 'ttfCN CLCCT N1C1M r ONCMN tNCTNttt 1/S 5 RO NNO MCNTN TOT f

CON COL CLCCTCT Cf M~ NCCNNN1tt CONTNOL CCNTtt OPCC I NLT CTO NPPNCNflCCO NttttNTTCCO Ot CMTOC NPPNCNflCtt NCLPQIO NCLttN 1/S ITTON Tl RO

'CO VNL1 CCNCCO OPCNNO 1 CC S/S 10 CO SRO HRC SENIOR OPERATOR LICEHSE RO HRC RE4CTOR OPGIATOR LICEHSK HUlfSER AEOUIRED PER SHIP'T TOTAL HUHSEA IH CLASSIFICATION OHSITK AESPOHSISILITY POR FlAK PROTECTION PAOSRAN FIOUAE C S E FACILI'TY OASAHIZATIOH STi LUCIS PL4NTi UNIT 1 GA-2-870S1RO

COMPOSITION 6.5.2.2 The CNRB shall be composed of the:

Member: Vice President, Advanced Systems and Technology Member: Chief Engineer, Power Plant Engineering Member: Vice President, Nuclear Energy, Member,: Manager, Nuclear Energy Member.: Director of Hucleaf Affairs Member: Manager, Nuclear Fuel Member: Power Plant Engineering Principal Engineer Member: Power Plant Engineering Senior Project Manager The CNRB Chairman shall be designated in writing.

ALTERHATES 6.5.2.3 All alternate members shall be appointed in writing by the CHRB Chairman to serve on a temporary basis however, no more than two

. alternates shall participate as voting members in CNRB activities at any one time.

CONSULTANTS

,.6.5.2.4 Consultants shall be utilized as determined by the CNRB chairman to provide expert advice to the CNRB.

EEET YEEEE E EY 6.5.2.5 The CNRB shall meet at least once per calendar quarter during the

. initial year of facility operation following fuel loading and at least once per six months thereafter.

~UORUIR 6.5.2.6 A quoroum of CNRB shall consist of the Chairman or his designated

'lternate and four members including alternates. Ho more than minority of the quorum shall have line responsibility for operation of the facility.

6-9 8/11/82 ST. LUCIE - UNIT I

\4 EXECUTIVE VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT ADVANCED ENGINEERING NUCLEAR ENERGY SYSTEMS PROJECT MGT 6 DEPARTMENT TECHNOLOGY CONSTRUCTION MANAGER NUCLEAR ENERGY DEPARTMENT DIRECTOR ASSISTANT MANAGER SITE MANAGER NUCLEAR AFFAIRS NUCLEAR ENERGY PTP D PART PLANT MANAGER NUCLEAR-PTP MANAGER QUALITY PLANT MANAGER ASSURANCE PSL PLANT MANAGER FOSSIL PTP MANAGER NUCLEAR LICENSING MANAGER NUCLEAR ENERGY SERVICES COMPANY NUCLEAR REVIEW BOARD CLEAR ENERGY ERVICES STAFF FIGURE 6.2-1 OFFSITE ORGANIZATION FOR FACILITY MANAGEMENT AND TECHNICAL SUPPORT

L

'P

~

t