L-82-308, Forwards Amend 11 to FSAR
| ML17213A321 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/02/1982 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17213A323 | List: |
| References | |
| L-82-308, NUDOCS 8208120019 | |
| Download: ML17213A321 (11) | |
Text
DOCKET 05000389 NOTES:
REGULATORY Of%ÃTION DISTRIBUTION SY
.M ~IOS)
ACCESSION NBR:8208120019 DOC ~ OATEN'2/08/02 NOTARIZED:
YES FACIL:50-389 St. Lucie PlantP Unit 2< Florida Power L Light Co.
AUTH,NAME AUTHOR AFFILIATION UHRIGPRSEB Florida Power 8 l.ight Co, ROC IP ~ NAME RECIPIENT AFFILIATION EISENHUTPD,G, Division of Licensing
SUBJECT:
Forw rds Amend 11 to
- FSAR,
+/0 tE Us( /5 ~ M~A l/ol W
~ /g/ ~
DISTRIBUTION CODE:
BOO IS COPIES RE EIVED:LTR EN L $
I E:
1 Q. 0 TITLE: PSAR/FSAR AMOTS and Related Correspondence RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR P3 LA
'TERNAL0 ELD/HDS2 IE/DEP EPOS 35 NRR/DE/CEB li NRR/DE/GB 28 NRR/OE/MEB 18 NRf4/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRf</OHFS/PTRB20 NRR/DSI/ASB 27 NRR/DS I/CS8 09 NRR/DSI/ICSB ie NRR/DS I/RAB 22 NRR/OST/LGB 33 RGN2 EXTERNAL: ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 COPIES LTTR ENCL 0
1 0
1 0
1 1
1 1
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 2
2 10 10 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LIC BR 43 BC
- NERSESPV, 01 IE FILE IE/OEP/EPLB 36 NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 20 NRR/DHFS/HFEBPO "
NRR/DHFS/OLB 34 NRR/DSI/AEB
?6 NRR/DSI/CPB 10 NRR/DS I/ETSB 12 NRR/DS I/PSB 19 NRR RSB 23 0g RM/DDAMI/MIB BNL (AMDTS ONlY)
FEMA-REP DIV 39 NRC PDR 0?
NTIS COPIES LTTR ENCL 1
0 1
1 1
1 3
3 3
3 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
0 T)TAL NUMBER Of COPIES REQUIRED:
LTTR 58 ENCL 53
0 ~
0 ~
I ~
T
~
4
'1
~
h J
, -'!k
)
q't t
1 I
< 'a)
e 0 P.
OX 1 JUNO BEACH, FL 3340B FLORIDAPOWER & LIGHTCOMPANY August 2, 1982 L-82-308 Office of Nuclear Reactor Regulation Attention:
Nr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear ter. Eisenhut:
Re:
St. Lucie Unit 2 Docket No. 50-389
'mendment 11 to The Final Sf A i1 ill In accordance with the requirements of 10 CFR 50.30, Florida Power 8 Light Company (FPL) is submitting sixty (60) copies of Amendment 11 to the Final Safety Analysis Report, St. Lucie Plant Unit 2.
The changes to the amendment are contained in the attachment.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems and Technology REU/RAK/cab Attachments cc:
J.
P. O'Reilly, Director, Region II (w/o attachments)
Harold F. Reis, Esquire (w/o attachments)
PEOPLE... SERVING PEOPLE
STATE OF FLOREDA
)
)
COUNTY OF DADE
)
ss
~
being first. duly sworn, deposes and says:
That he is Vice President Light Company, the herein; of Florida Power That he has executed the foregoing document; that the state-ments made in this said document are true and correct, to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Robert E. Uhrig Subscribed and sworn to before me this
~day of 19 $~
r
'I NOTARY PUBLIC
"-~ Stai.e of Flo
'y t ommission in and for the County of Dade, da N to~ pUbtlc, Stete of Ronde ttt Lttrgo Cornrneszn Expire". October 30, ISG3 expires:
My r~~:;
~
0 0 I
G I
sr Iq I
ATTACHMENT TO L-82-308 dated Au ust 2, 1982 Changes in the St Lucie Plant Unit 2 FSAR as a result of Amend-ment 11.
Chapter 1The changes basically contain revisions to reflect the changes in plant design as a result of NRC re-view and various commitments made to the NRC.
This makes Chapter 1 consistent with the rest of the FSAR.
In Section 1.1 value of net electrical output for rated power is corrected to correspond to the License Application and ER.
In Section 1.3 slight changes are made to plant parameters to reflect final design values.
In Section 1.7 update of the instrument arrangement and CWD list is provided.
In Section 1.9A updates of information related to CE owners group effort on TMI related items are provided.
Chapter 2
Clarified information found in text, revised ref-erences to figures, corrected typographical errors in equations, added references and revised a draw-ing.
Chapter 3
Changes are made for consistency with other chapters of the FSAR, provided additional information on J<<
impingement analysis and recently completed IEALA study (Section 3.9).
In Section 3.10, seismic qualification data for electrical equipment and instrumentation are updated to reflect additional information available from vendor.
Section 3.11 writeup for environment quali-fication has been basically deleted and supplemented with references to the Environmental Qualification Report 6 Guidebook previously submitted to the NRC under seperate cover.
Chapter 4
Chapter 5
Revised to reflect the fact that part length CEAs will not be used in St Lucie Unit 2.
Also updated are core parameters to reflect the final design.
Minor clarification, cross-references to other FSAR sections and changes for consistency with other FSAR sections are made.
Chapter 5
cont'd In Section 5.2 missing design information on Reactor Coolant Leak Detection Sensitivity is provided.
In Appendix 5.2B additional information as to the amount of condensate water required to bring St Lucie Unit 2 thru four hours of hotstandby followed by natural circulation cooldown without upper head voiding is provided.
In Section 5.4 Condensate Storage tank water volume is revised to be consistent with already existing Chapter 10 values.
The Failure Mode and Effects Analysis for Shutdown Cooling System is reformatted to include additional information on "Inherent Compensating Provisions" and "Remarks and other Efforts".
Section
- 6. 1 Indicated that insignificant amounts of PVC is used inside the containment and other minor changes to reflect the plant, design.
Section 6.2 Section 6.3 Section 6.5 Modified design parameters slightly to reflect as-built conditions'.
Revised location of Hydro-gen analyvzers, tables in 6.2 to correct typos and other changes for consistency with the informa-tion provided to the NRC before.
Inserted new revision of figures.
Added new information on small break analysis per-formed with -0.15 and -0.25. ASIU.
Safety Injection System FMEA was reformatted.
Included new power operated valves to listing.
Increased number of TSP baskets present in the vicinity of the SL2 sump.
Section 7.1 Section 7.2 Section 7.3 Minor changes for clarification and consistency with information already provided to the NRC.
The asymmetric Steam Generator Transient Protective Trip Function is incorporated in the writeup.
Reactor Protective System input values are updated to reflect final design.
Battery fail bypass is added to the description of AFAS bypasses.
Other changes made for clarifica-tion and consistency.
Section 7.4 Post Accident Monitoring Instrumentation listing j.s updated and "instrument loop accuracys" values are provided.
Additions are made to the safety related annunciator windows listing.
Appendix 7.5AThe Safety Assessment System writeup is updated to reflect current design.
Section 7.6 Added information on Pressurizer Level Alarm and Heater Cutout.
Section 8.2 Revised subsection on Grid availability to reflect current information, corrected titles on the load flow diagrams.
Section 8.3 Cha ter 9
Cha ter 10 Section 10.4 Various changes made to writeup to primarily incorporate changes resulted from NRC review items like QSPDS and SAS.
Inserted new Diesel Generator Loading Table and Battery Load Group table showing new loading sequence as a result of NRC concerns and questions.
Changes are made to the design information to reflect as built design, for consistency with other FSAR Sections, to incorporate information provided to the NRC previously and for completeness.
P Inserted latest revision of Drawings where applicable.
Provided clarification on the volume of'ondensate Storage Tank water available at St Lucie 2.
- Also, included information on CST water required to hold the plant at hot standby for 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> and subseQuent cooldown for four hours.
Cha ter 11 Section 11.2 has minor changes made for consistency, clarification and proper cross-references to the other sections of the FSAR and to incorporate infor-mation already provided to the NRC.
Designated the Liquid Water Concentrator Bottoms Tank as a future installation.
Section 11.3 Designated 'the second oxygen analyzers of the GWMS as a future installation.
Section 11.5 Updated information on rad monitors per revised vendor's specifications.
Cha ter 12 Cha ter 13 Upadated radiation monitor data to agiee with revise'd vendor's specifications.
Updated to reflect the current personnel changes and restructuring of the organization as a result of NRC review.
Plant training schedule is also slightly modified.
45 4
~CC 14
~Ch 15.
Discription of Auxiliary Feedwater System functional and endurance test and auto actuation system test are added.
This chapter has been revised for consistency with changes made to the other chapters of the FSAR primarily generated as a result of the NRC review.'ection 15.0 Section 15.C.6 Section 15.C.7 The sequence of event diagrams are revised to correspond to the new Diesel Generator loading table in Chapter 8.
Revised tables to indicate proper sequencing of events in terms of time and accident assumptions.
Added new information on the Atmospheric Dump Valve, Automatic Controls and a statement on the effects of PLCEA on accident analysis.
The decision not to use PLCEA's in St Lucie 2 design, does not affect the accident analysis results.
Added new subsection on Inadvertent opening of a pressurizer relief valve.
Added a new subsection on one'ump resistance to forced flow.
Section 1S.C.8 Added new subsection on opening one Atmospheric Dump Valve.
NRC uestions 210A NRC uestions Revised response to indicate'that the list of snubbers would be provided in the Technical Specifications.
220 Clarified responses to indicate that the pressure described was that of the soil.
NRC uestions 240 Added a clarifying statement to the response to describe the PNH groundwater level used in plant design.
280 Revi'sed responses to reflect the most recent commitments made to the NRC.
'0 ~
NRC ues tions 410 NRC uestions Inserted new response on Light Loads.
Information has been previously transmitted to the NRC.
Revised response due to the results of flooding of safety related equipment.
420 NRC uestions Included additional information developed as a
result of various NRC review requirements.
Regulatory Guide 1.97 listing is updated to add new items.
430A Inserted Question/Responses on PSB, R.G.
1.63 conformance and total loss of A.C. Power.
This information has been previously transmitted to'he NRC.
NRC uestions 440 Clarifications added and changes made to incorporate requirements resulting from NRC review.