- ML17213A938 + (20:32:39, 8 January 2025)
- ML17213A937 + (20:32:40, 8 January 2025)
- ML17213A934 + (20:32:41, 8 January 2025)
- ML17213A936 + (20:32:41, 8 January 2025)
- L-82-549, Submits Info Describing Const of Emergency Operations Facility,Scheduled to Be Fully Operational by 831001.W/two Oversize Drawings.Aperture Cards Are Available in PDR + (20:32:42, 8 January 2025)
- L-82-564, Forwards Final Response to Requirements of NUREG-0737,Item II.D.1 Re PWR Safety & Relief Valve Test Program.Conclusion & Previous Submittals Support Continued Safe Operation & NUREG Requirement + (20:32:44, 8 January 2025)
- ML17213A930 + (20:32:46, 8 January 2025)
- ML17213A928 + (20:32:47, 8 January 2025)
- ML17213A926 + (20:32:49, 8 January 2025)
- L-82-550, Advises That Satisfactory Reactor Protection Sys Power Supply Testing Has Been Completed for Ultra Isolation Transformers,Per SER Suppl 1,Section 7.2.5.Acceptance Criteria Met + (20:32:50, 8 January 2025)
- ML17213A919 + (20:32:52, 8 January 2025)
- ML17213A916 + (20:32:53, 8 January 2025)
- ML17213A917 + (20:32:53, 8 January 2025)
- L-82-543, Provides Status of Inadequate Core Cooling Instrumentation Package Per TMI Item II.F.2.Sys Will Be Fully Operational by Mid 1983.Mods to Sys Will Be Included in Next Revision to FSAR + (20:32:55, 8 January 2025)
- ML17213A912 + (20:32:55, 8 January 2025)
- ML17213A910 + (20:32:58, 8 January 2025)
- L-82-542, Forwards Addl Info Re Small Feedwater Line Break Analysis. Info Needed to Close Confirmatory Issue Addressed in Section 15.10.2 of SER + (20:32:59, 8 January 2025)
- L-82-536, Forwards Responses to 820913 Request for Addl Info Re Degraded Grid Voltage Protection,Questions 1-4.Proposed Tech Spec Change to Verify Load Shedding of Emergency Busses Not Warranted Since Present Test Adequate + (20:33:01, 8 January 2025)
- ML17213A907 + (20:33:01, 8 January 2025)
- L-82-534, Forwards Responses to Issues Raised in Environ Qualification Branch Review of Program.All safety-related Equipment Will Be Qualified Per NUREG-0588 by First Refueling + (20:33:06, 8 January 2025)
- ML17213A904 + (20:33:08, 8 January 2025)
- ML17213A903 + (20:33:09, 8 January 2025)
- ML17213A902 + (20:33:10, 8 January 2025)
- ML17213A900 + (20:33:11, 8 January 2025)
- ML17213A888 + (20:33:11, 8 January 2025)
- L-82-526, Forwards Resubmittal of Mechanized Preservice Exam of Selected Components of St Lucie Plant,Unit 2. Attachment Updates 821110 Submittal Which Had Missing Pages + (20:33:12, 8 January 2025)
- ML17213A883 + (20:33:14, 8 January 2025)
- ML17213A885 + (20:33:14, 8 January 2025)
- ML17213A881 + (20:33:15, 8 January 2025)
- L-82-533, Forwards Response to Request for Analysis of Limited Small Feedwater Line Break W/Assumption of Single Failure & Availability of Offsite Power,To Verify That Sys Pressures Will Not Exceed 120% of Design Pressure + (20:33:16, 8 January 2025)
- L-82-530, Forwards Revision to Re post-accident Sampling Sys.Completion Date Will Be Changed from Prior to Exceeding 5% Power to Prior to Initial Criticality + (20:33:17, 8 January 2025)
- ML17213A874 + (20:33:19, 8 January 2025)
- ML17213A873 + (20:33:20, 8 January 2025)
- ML17213A863 + (20:33:21, 8 January 2025)
- IR 05000133/2017002 + (20:33:26, 8 January 2025)
- ML17213A840 + (20:33:27, 8 January 2025)
- ML17213A795 + (20:33:28, 8 January 2025)
- ML17213A790 + (20:33:29, 8 January 2025)
- ML17213A789 + (20:33:30, 8 January 2025)
- ML17213A775 + (20:33:32, 8 January 2025)
- ML17213A769 + (20:33:33, 8 January 2025)
- ML17213A762 + (20:33:34, 8 January 2025)
- ML17213A767 + (20:33:34, 8 January 2025)
- ML17213A760 + (20:33:35, 8 January 2025)
- L-82-516, Advises That Util Does Not Intend to Provide Separate Meteorological Instrumentation for Facilities Since Equipment in Place Meets NRC Meteorological Monitoring & Emergency Planning Criteria (NUREG-0654) + (20:33:36, 8 January 2025)
- ML17213A759 + (20:33:36, 8 January 2025)
- ML17213A757 + (20:33:38, 8 January 2025)
- ML17213A756 + (20:33:39, 8 January 2025)
- ML17213A754 + (20:33:40, 8 January 2025)
- ML17213A748 + (20:33:41, 8 January 2025)
- L-82-515, Confirms 821112 Telcon Agreement W/Util to Discontinue Hot Functional Testing of Reactor Vessel Internals Intended Solely to Increase Vibratory Cycles on Plant + (20:33:42, 8 January 2025)
- L-82-513, Forwards Const/Startup Progress Update for Oct 1982.Fuel Load Target Date of 821028 Met + (20:33:44, 8 January 2025)