ML17213A910

From kanterella
Jump to navigation Jump to search
Summary of 821130 Meeting W/Util in Bethesda,Md Re Status of Plant Const.Implementation Schedule for Fire Protection Hardware Items Not Approved.Nrc Will Suggest Submittal Date for Results of Independent Design Review
ML17213A910
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/08/1982
From: Nerses V
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8212220153
Download: ML17213A910 (6)


Text

Docket No.:

50-389 DEC 8 1S82 Distribution:

See attached sheet APPLICANT:

Florida Power and Light Company, (FP8L)

FACILITY:

St. Lucie Plant,, Unit 2

SUBJECT:

SUMMARY

OF MEETING HELD WITH FP&L IN BETHESDA, MARYL'AND ON NOVEMBER 30, 1982 REGARDING STATUS OF PLANT CONSTRUCTION FP&L repor ted that they hade recently completed IPhase I of their 'hot functional testing and their integrated leak rate testing program.

Fuel for Unit 2 will be shipped to Ithee site beginning December 1, 1982.

FP8L supplied a copy of their "Monthly Status Report".

The report showed a critical path variance of -', 14.0 weeks:asI of the end of November, 1982.

FP&L stated that the core load date is noi( scheduled for the end of

January, 1983.

FPEL raised concern about a potential problem that could jeopardize plant startup namely that the staff has not approved the implementation schedule for the fire protection hardware items.

FP&L stated that they cannot meet a schedule to complete installation of the hardware items by 55 power (which is the current staff positions).

The staff requested that FP&L submit a detailed installation schedule which would clearly indicate when certain hardware items will be installed and fully operated.

FP&L agreed to submit the schedules within two weeks after which the staff will meet with FP&L to discuss a course of action to resolve this issue.

The staff noted that there may be about 32 license conditions and that this is much more than desired.

Further action on the staff's and FP&L's part is needed to complete somejo'f the items by cereload in order to reduce this number.

FP&L planned to submit <the results, of. their. independent design <review program and their engineering design verification program by the first week in January, 1983.

The staff stated that this date would not provide the staff adequate time to evaluate FP&L's submittal before issuing the license.

The staff will assess the effort needed to make the evaluation and suggest a

submittalw date.

Original Signed By:

( 82i2220i53 82i208 PDR ADOCK 05000389 A

PDR Victor Nerses, Project Manager Licensing Branch No.

3 Division of Licensing DL:

~ ~ ~

~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~

..N I.S.,uh..

OFFICE Ij SURNAME/

on

~

~ ~ ~ ~

~

~

~ ~ ~ ~

~

12/ ) /82 DATE$

OFFICIAL RECO'RD COPY NRC FORM 318 u0-80) NRCM 0240 12/ '7,/82

~ ~ o ~ ooeo ~ oo ~ ~ ~ ~ ~ e ~ e ~ ~ ~ o ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ oe ~ ~ ero ~ ~ oo ~ ore ~

~

~ ~

~

~

~ ~ ~ o USGPO: 1981~960

~y el l(

(

'~~

t

1.

UCIE Or.

Robert E. Uhrig, Vice Pres dent Advanced Systems and Technology Florida Power 8 Light Company P.

0.

Box 14000 Juno

Beach, Florida 33408 Harold F. Reis, Es'q.

Lowenstein, Newman, Reis, Axelrad 5 Toll 1025 Connecticut

Avenue, N.H.

klashington, D.

C.

20036 Norman A. Coll, Esq.

Steel Hector 5 Davis 1400 Southeast, First National Bank Building Miami, Flordia 33131 Mr. Martin H. Hodder 1131 N. E. 86th Street Miami, Flordia 33138 Resident Inspector St.

Lucie Nuclear Power Station c/o U.'. Nuclear Regulatory Commission 7900 South A1A Jensen Beach, Flordia 33457 Regional Adminstrator - Region II U.

S. Nuclear Regulatory Commission 101 Marietta Street Suite 3100 Atlanta, Georgia 30303

ATTENDEES S.L.

2 NOVEMBER 30, 1982 MEETING IN BETHESDA, MD R. Purple T. Novak W. Johnston G. Knighton V. Nerses W. Derrickson K. Harris E. Dotson

yO MEETING

SUMMARY

document Control (50- 389)

NRC PDR '

PDR NSIC TERA LB~3 Reading J.

Lee G. Knighton Project Manager V. Nerses

Attorney, OELD E. L. Jordon Regional Administrator, Region II J.

M. Taylor PARTICIPANTS NRC):

R. Purple T. Novak ll. Johnston G. Knighton V. Nerses

41 Oy 2