Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17213B006 + (20:32:19, 8 January 2025)
- ML17213B007 + (20:32:19, 8 January 2025)
- ML17213B005 + (20:32:20, 8 January 2025)
- ML17213B003 + (20:32:20, 8 January 2025)
- ML17213B001 + (20:32:21, 8 January 2025)
- ML17213A999 + (20:32:22, 8 January 2025)
- ML17213A993 + (20:32:23, 8 January 2025)
- ML17213A992 + (20:32:24, 8 January 2025)
- ML17213A991 + (20:32:25, 8 January 2025)
- L-82-558, Forwards C-E Proprietary Rept, Engineering Evaluation & Functional Testing for C-E Pass Components & Instrumentation, Supporting on-line Instrumentation in post-accident Sampling Sys.Rept Withheld (Ref 10CFR2.790) + (20:32:26, 8 January 2025)
- ML17213A969 + (20:32:28, 8 January 2025)
- ML17213A964 + (20:32:30, 8 January 2025)
- L-82-560, Forwards Supplemental Info,10CFR50 App R Fire Hazards Analysis, in Response to BNL Evaluation for Prairie Island, as Applicable to St Lucie 1 + (20:32:31, 8 January 2025)
- ML17213A955 + (20:32:31, 8 January 2025)
- ML17213A950 + (20:32:36, 8 January 2025)
- ML17213A945 + (20:32:37, 8 January 2025)
- ML17213A944 + (20:32:38, 8 January 2025)
- ML17213A938 + (20:32:39, 8 January 2025)
- ML17213A937 + (20:32:40, 8 January 2025)
- ML17213A934 + (20:32:41, 8 January 2025)
- ML17213A936 + (20:32:41, 8 January 2025)
- L-82-549, Submits Info Describing Const of Emergency Operations Facility,Scheduled to Be Fully Operational by 831001.W/two Oversize Drawings.Aperture Cards Are Available in PDR + (20:32:42, 8 January 2025)
- L-82-564, Forwards Final Response to Requirements of NUREG-0737,Item II.D.1 Re PWR Safety & Relief Valve Test Program.Conclusion & Previous Submittals Support Continued Safe Operation & NUREG Requirement + (20:32:44, 8 January 2025)
- ML17213A930 + (20:32:46, 8 January 2025)
- ML17213A928 + (20:32:47, 8 January 2025)
- ML17213A926 + (20:32:49, 8 January 2025)
- L-82-550, Advises That Satisfactory Reactor Protection Sys Power Supply Testing Has Been Completed for Ultra Isolation Transformers,Per SER Suppl 1,Section 7.2.5.Acceptance Criteria Met + (20:32:50, 8 January 2025)
- ML17213A919 + (20:32:52, 8 January 2025)
- ML17213A916 + (20:32:53, 8 January 2025)
- ML17213A917 + (20:32:53, 8 January 2025)
- L-82-543, Provides Status of Inadequate Core Cooling Instrumentation Package Per TMI Item II.F.2.Sys Will Be Fully Operational by Mid 1983.Mods to Sys Will Be Included in Next Revision to FSAR + (20:32:55, 8 January 2025)
- ML17213A912 + (20:32:55, 8 January 2025)
- ML17213A910 + (20:32:58, 8 January 2025)
- L-82-542, Forwards Addl Info Re Small Feedwater Line Break Analysis. Info Needed to Close Confirmatory Issue Addressed in Section 15.10.2 of SER + (20:32:59, 8 January 2025)
- L-82-536, Forwards Responses to 820913 Request for Addl Info Re Degraded Grid Voltage Protection,Questions 1-4.Proposed Tech Spec Change to Verify Load Shedding of Emergency Busses Not Warranted Since Present Test Adequate + (20:33:01, 8 January 2025)
- ML17213A907 + (20:33:01, 8 January 2025)
- L-82-534, Forwards Responses to Issues Raised in Environ Qualification Branch Review of Program.All safety-related Equipment Will Be Qualified Per NUREG-0588 by First Refueling + (20:33:06, 8 January 2025)
- ML17213A904 + (20:33:08, 8 January 2025)
- ML17213A903 + (20:33:09, 8 January 2025)
- ML17213A902 + (20:33:10, 8 January 2025)
- ML17213A900 + (20:33:11, 8 January 2025)
- ML17213A888 + (20:33:11, 8 January 2025)
- L-82-526, Forwards Resubmittal of Mechanized Preservice Exam of Selected Components of St Lucie Plant,Unit 2. Attachment Updates 821110 Submittal Which Had Missing Pages + (20:33:12, 8 January 2025)
- ML17213A883 + (20:33:14, 8 January 2025)
- ML17213A885 + (20:33:14, 8 January 2025)
- ML17213A881 + (20:33:15, 8 January 2025)
- L-82-533, Forwards Response to Request for Analysis of Limited Small Feedwater Line Break W/Assumption of Single Failure & Availability of Offsite Power,To Verify That Sys Pressures Will Not Exceed 120% of Design Pressure + (20:33:16, 8 January 2025)
- L-82-530, Forwards Revision to Re post-accident Sampling Sys.Completion Date Will Be Changed from Prior to Exceeding 5% Power to Prior to Initial Criticality + (20:33:17, 8 January 2025)
- ML17213A874 + (20:33:19, 8 January 2025)
- ML17213A873 + (20:33:20, 8 January 2025)
- ML17213A863 + (20:33:21, 8 January 2025)