Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-81-196, Forwards Addl Info Re Safety Relief Valve Methodology,In Response to NRC 810528 Request.Info Will Be Incorporated Into FSAR within 4 Months + (13:34:41, 8 January 2025)
- GO2-81-186, Forwards Response to Round 2 Questions Re Fire Protection Evaluation.Response Will Be Incorporated Into FSAR by Amend within 4 Months + (13:35:13, 8 January 2025)
- ML17275B143 + (13:35:54, 8 January 2025)
- ML17275B142 + (13:35:56, 8 January 2025)
- ML17275B141 + (13:35:57, 8 January 2025)
- ML17275B140 + (13:35:58, 8 January 2025)
- GO2-81-188, Forwards Response to Request for Info Re Reactor Fuel Design,To Be Incorporated in Future Amend of Fsar.Sufficient Info Exists to Allow SER Section Addressing Fuel Design to Be Written + (13:35:59, 8 January 2025)
- GO2-81-189, Forwards Proprietary & Nonproprietary Versions of Burns & Roe,Inc Rept Re Revised Chugging Load Definition.Revisions Reflect 1979 & 1980 Steam Condensation Tests & Multivent full-scale Test Data from Jaeri Facility in Japan.W/O Encls + (13:36:41, 8 January 2025)
- GO2-81-191, Provides Response to NUREG-0737,Item II.D.1 Re Preliminary Review of Generic BWR Safety/Relief Valve Test Program Results.Preliminary Review Demonstrates That Tested Valve Satisfies Acceptance Criteria for Operability + (13:37:03, 8 January 2025)
- GO2-81-194, Responds to NRC 801030,810302 & 0604 Requests for Info Steel Containment Const Details,Geometry,Penetration Locations & Matl Properties;Const Drawings for Design Load & Loading Combinations & Matls Properties Test Repts + (13:37:35, 8 January 2025)
- IR 05000397/1981013 + (13:38:07, 8 January 2025)
- ML17275B132 + (13:38:09, 8 January 2025)
- ML17275B131 + (13:38:10, 8 January 2025)
- ML17275B129 + (13:38:11, 8 January 2025)
- ML17275B127 + (13:38:12, 8 January 2025)
- GO2-81-175, Responds to 810601 Request for Status on 15 Criteria Re Control Room Completion to Allow Scheduling of NRC Human Factors Design Review.Expected Deadline List Encl.Requests NRC Proceed Per Mar 1982 SER & Dec 1982 Fuel Load Dates + (13:38:14, 8 January 2025)
- ML17275B126 + (13:38:14, 8 January 2025)
- GO2-81-181, Commits to Inert Facility Primary Containment for Interim Period Until Completion of Degraded Core Rulemaking.Design Drawings,Fsar Revisions & Support Data Re Hydrogen Recombiner Performance Will Be Submitted in Jan 1982 + (13:38:47, 8 January 2025)
- ML17275B116 + (13:39:29, 8 January 2025)
- GO2-81-170, Confirms That New Info Obtained from Ongoing & Previously Completed Geological & Seismological Studies Will Be Provided on Unit 2 for Use in Licensing Review of Units 1 & 4 + (13:39:30, 8 January 2025)
- GO2-81-161, Forwards marked-up Responses to NRC Round 2 Questions Re Initial Test Program.Responses Will Be Incorporated Into FSAR Amend within 4 Months + (13:39:53, 8 January 2025)
- ML17275B105 + (13:40:35, 8 January 2025)
- ML17275B104 + (13:40:37, 8 January 2025)
- ML17275B101 + (13:40:38, 8 January 2025)
- ML17275B100 + (13:40:39, 8 January 2025)
- GO2-81-146, Forwards Revised Cable Separation Criteria in Response to NRC 810504 Request.Circuits Will Be Modified as Necessary to Comply W/New Criteria.Deviations Not Included in Revision Will Be Addressed in Chapter 8 of FSAR + (13:40:40, 8 January 2025)
- ML17275B095 + (13:41:23, 8 January 2025)
- ML17275B094 + (13:41:24, 8 January 2025)
- ML17275B092 + (13:41:25, 8 January 2025)
- GO2-81-122, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/81-03.Corrective Actions:Deficient Items Reviewed & Scheduled for Updating as Required + (13:41:26, 8 January 2025)
- ML17275B089 + (13:42:08, 8 January 2025)
- RBG-47789, Request to Use a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection (Lsi) Activities at River Bend Station, in Accordance with 10CFR50.55a(g)(4)(iv) + (13:42:09, 8 January 2025)
- GO2-81-139, Advises That Response to Request for Addl Info,Re Des Per 810307 & 0505 Ltrs Was Submitted as Attachments to .W/O Ref Encls + (13:42:10, 8 January 2025)
- IR 05000397/1981005 + (13:42:49, 8 January 2025)
- ML17275B084 + (13:42:51, 8 January 2025)
- GO2-81-109, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/81-05.Corrective Actions:Qa Program Nondestructive Testing Procedure for Magnetic Particle Insp Revised on 810415 to Indicate Partial Penetration Welds + (13:42:52, 8 January 2025)
- ML17275B083 + (13:42:52, 8 January 2025)
- ML17275B080 + (13:43:36, 8 January 2025)
- ML17275B079 + (13:43:37, 8 January 2025)
- GO2-81-103, Forwards Amend 15 to FSAR Re Emergency Preparedness Plan + (13:43:38, 8 January 2025)
- ML17275B075 + (13:44:16, 8 January 2025)
- ML17275B074 + (13:44:17, 8 January 2025)
- GO2-81-104, Forwards Transmittal Ltr & Certificate of Svc Re Amend 15 to FSAR + (13:44:18, 8 January 2025)
- ML17275B072 + (13:44:59, 8 January 2025)
- GO2-81-135, Forwards Earthquake Monitoring of Hanford Region,Eastern Wa, Earthquake Monitoring of Hanford Region,Eastern Wa, & Earthquake Swarms in Columbia River Basalts. Repts Available in Central Files Only + (13:45:00, 8 January 2025)
- ML17275B068 + (13:45:39, 8 January 2025)
- ML17275B067 + (13:45:41, 8 January 2025)
- ML17275B066 + (13:45:42, 8 January 2025)
- GO2-81-121, Advises That Util re-evaluation of Mechanical Contractor WSH-Boecon-Geri Methods,Controls & Performance Has Been Completed.Improvements in Quality Program Assure Proper Work.Requests NRC Lift Stop Work Directive + (13:45:44, 8 January 2025)
- ML17275B065 + (13:45:44, 8 January 2025)
- ML17275B063 + (13:45:49, 8 January 2025)