1
~
~
T/C
Docket No. 50-397
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94596
May 7,
1981
Washington Public Power Supply System
P. 0.
Box 968
Richland, Washington
99352
Attention:
Mr.
R.
G. Matlock
Program Director,
WNP-2
Gentlemen:
Subject:
NRC Inspection at Washington Nuclear Project
No.
2
This refers to the inspection
conducted
by Messrs.
D. P. Haist,
D. F. Fox,
P.
P. Narbut,
W. J.
Wagner,
A. J. D'Angelo, J. 0. Elin and J.
F. Burdoin
of this office on February
10-13, 17-20, 23-27 and March 2-6 and 9-13,
1981
of activities authorized
by
NRC Construction Permit
No.
CPPR-93,
and to the
discussion of their findings with Mr.
W. C. Bibb and other members of your
staff at the conclusion of the inspection.
gag
Areas examined during this inspection are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
Based
on the results of this inspection, it appears
that certain of your'ctivities
were not conducted in full compliance with NRC requirements,
as set forth
in the Notice of Violation, enclosed
herewith as Appendix A.
In accordance
with 10 CFR 2.790 of the Commission's regulations,
a copy of
this letter and the enclosed
inspection report will be placed in the
NRC's
Public Document
Room. If this report contains
any information that you believe
to be exempt from disclosure
under
10 CFR 9.5(a)(4), it is necessary
that
you (a) notify this office by telephone within ten (10) days from the date
of this letter of your intention to file a request for withholding; and (b)
submit within 25 days from the date of this letter a written application
to this office to withhold such information. If your receipt of this letter
has
been delayed
such that less
than seven
(7) days are available for your
review, please notify this office promptly so that
a new due date
may be established.
Consistent with section 2.790(b)(1),
any such application must be accompanied
by an affadavit executed
by the owner of the information which identifies
the document or part sought to be withheld, and which contains
a full statement
of the reasons
on the basis which it is claimed that the information should
be withheld from public disclosure.
This section further requires
the statement
to address
with specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall
be incorporated
as far as possible
into a separate
part of the affadavit. If we do not hear
from you in this
regard within the specified periods noted above,
the report will be placed
in the Public Document
Room.
SiO6990 l~~
r
g ~
e
E)
r
Qr p'.~,
i
a ~
8 P}
Cl
tr
Washington Public Power Supply System
-2-
Hay 7,
1981
Should you have
any questions
concerning this inspection,
we will be glad
to discuss
them with you.
Sincerely,
B.
H. Faulkenber
, Chic
Reactor Construct
'ects
Branch
Enclosures:
A.
B.
IE Inspection
Report
No. 50-397/81-03
cc w/o Enclosure
B:
R.
B. Glasscock,
HPPSS
W.
C. Bibb,