ML17275B083

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/81-05 on 810202-27 & Notice of Violation
ML17275B083
Person / Time
Site: Columbia 
Issue date: 04/24/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275B081 List:
References
NUDOCS 8106230011
Download: ML17275B083 (4)


See also: IR 05000397/1981005

Text

~g8 REgIj,

~4

0

Cy

0O

+y

q9

++*++

Docket No. 50-397

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

April 24,

1981

~~)I-.

~ I(~

JUNZ8>g8~~

<

"i@~

eomvom

Q)hQI$5PII

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. R.

G. Matlock

Program Director

Gentlemen:

Subject:

This refers to the inspection

conducted

by Mr. A. Toth of this office on

February 2-27,

1981, of activities authorized

by NRC Construction Permit

No.

CPPR-93,

and to the discussion of our findings held by Mr. Toth with

Mr. R. Johnson

and other members of your staff at the conclusion of the

inspection.

Areas

examined during this inspection are described

in the enclosed

inspec-

tion report.

Within these

areas,

the inspection consisted of selective

ex-

aminations of procedures

and representative

records,

interviews with person-

nel,

and observations

by the inspector.

Based

on the results of this inspection, it appears

that one of your activ-

ities was not conducted in full compliance with NRC requirements,

as set

forth in the Notice of Violation, enclosed

herewith

as Appendix A.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you believe to be proprietary, it is

necessary

that you submit

a written application to this office, within 30 days

of the date of this letter, requesting that such information be withheld from

public disclosure.

The application must include

a full statement

of the

reasons

why it is claimed that the information is proprietary.

The application

should

be prepared

so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also

be placed in the Public Document

Room.

If we do not hear

from you

in this regard within the specified period, the report will be placed in the

Public Document

Room.

91.063so OII

f

-2-

Washington Public Power Supply System

April 24,

1981

Should you have

any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

Enclosures:

A.

Notice of Violation

B.

IE Inspection

Report

No. 50-397/81-05

IK1

B. H. Faulkenberry

hi

Reactor Construct

on Projects

Branch

cc w/o enclosure

W. C. Bibb - Project Manager

R.

B. Glasscock - equality Assurance Director