Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-81-288, Forwards Response Schedule to Rl Tedesco 810427 Request for Addl Info on Questions 031.135-031.138 Concerning IE Bulletins 79-27 & 80-06 & IE Info Notice 79-22 + (13:28:04, 8 January 2025)
- GO2-81-294, Forwards Response to Siting Analysis Branch Questions 311.1. Info Will Be Incorporated in FSAR Amend within 4 Months. Marked-up Portion of Amend 12 to OL Encl + (13:28:26, 8 January 2025)
- ML17275B248 + (13:28:57, 8 January 2025)
- ML17275B247 + (13:28:58, 8 January 2025)
- GO2-81-292, Forwards Qualification & Staffing Level Charts of Offsite Managers & Technical Staff,Per Agenda Item 5 from R Auluck 810731 Memo.Info Provided in Preparation for 810924 Meeting W/Nrc.Details Will Be Provided in FSAR Chapter 13 Submittal + (13:28:59, 8 January 2025)
- GO2-81-285, Forwards Transmittal Ltr & Certificate of Svc on L Dallas & Nd Lewis for Amend 17 to Fsar.W/O Transmittal Ltr + (13:29:31, 8 January 2025)
- ML17275B242 + (13:30:04, 8 January 2025)
- ML17275B241 + (13:30:05, 8 January 2025)
- ML17275B240 + (13:30:06, 8 January 2025)
- GO2-78-164, Forwards Info Documenting Conformance W/Positions in NUREG- 0313, Technical Rept on Matl Selection & Processing Guidelines for BWR Coolant Pressure Boundary Piping, in Response to NRC 780306 Request + (13:30:07, 8 January 2025)
- GO2-81-268, Forwards Response to NUREG-0313,Revision 1, Technical Rept on Matl Selection & Processing Guidelines for BWR Coolant Pressure Boundary Piping. Mods to Reduce Occurrence of Intergranular Stress Corrosion Cracking Have Been Made + (13:30:39, 8 January 2025)
- GO2-81-276, Application to Amend CPPR-93 Extending Const Completion Date to 840201.Class II Amend Fee Encl + (13:30:53, 8 January 2025)
- ML17275B231 + (13:30:55, 8 January 2025)
- GO2-81-269, Forwards Responses to Containment Sys Branch 810316 Request for Addl Info.Responses Will Be Incorporated Into FSAR Amend within 4 Months.Remainder of Responses Re Hydrogen Recombiner Will Be Submitted to NRC by 810918 + (13:30:56, 8 January 2025)
- GO2-81-263, Forwards Amend 17 to FSAR + (13:30:57, 8 January 2025)
- ML17275B226 + (13:30:59, 8 January 2025)
- GO2-81-259, Forwards Burns & Roe,Inc Rept, Improved Structural Analysis Methods for Prediction of Containment-Response to Suppression Pool Hydrodynamic Loads. Rept Should Be Withheld (Ref 10CFR2.790).Affidavit Encl + (13:31:00, 8 January 2025)
- ML17275B224 + (13:31:01, 8 January 2025)
- ML17275B223 + (13:31:02, 8 January 2025)
- ML17275B220 + (13:31:03, 8 January 2025)
- ML17275B219 + (13:31:08, 8 January 2025)
- GO2-81-251, Forwards Responses to NRC 810316 Request for Addl Info Re OL Application Review.Responses Will Be Incorporated Into FSAR within 4 Months.Addl Responses Will Be Submitted by 810830 + (13:31:09, 8 January 2025)
- GO2-81-255, Forwards marked-up Responses to NRC 801230 Questions Re Instrumentation & Controls Sys.Responses Will Be Incorporated Into FSAR Amend within 4 Months + (13:31:11, 8 January 2025)
- IR 05000397/1981014 + (13:31:14, 8 January 2025)
- ML17275B210 + (13:31:15, 8 January 2025)
- GO2-81-249, Notifies That Util Has Scheduled Terminal Block Qualification Test at Wyle Labs,In Response to NRC Re Environ Qualification of safety-related Equipment. Tests Will Incorporate Aged & Tested Terminal Block Samples + (13:31:18, 8 January 2025)
- ML17275B200 + (13:31:20, 8 January 2025)
- GO2-81-219, Forwards App B to FSAR Response to Regulatory Issues Resulting from TMI-2. App Is Part of Amend 17,which Will Be Sent within 1 Month + (13:31:21, 8 January 2025)
- ML17275B197 + (13:31:25, 8 January 2025)
- ML17275B196 + (13:31:26, 8 January 2025)
- GO2-81-241, Forwards Schedule for Response to NRC Questions Re SER + (13:31:27, 8 January 2025)
- ML17275B192 + (13:31:40, 8 January 2025)
- ML17275B191 + (13:31:43, 8 January 2025)
- ML17275B189 + (13:31:43, 8 January 2025)
- GO2-81-230, Forwards Revised Section 2.5.1 of FSAR to Be Incorporated Into Amend Upon Completion of Section 2.5.2,scheduled for 810930 + (13:31:45, 8 January 2025)
- ML17275B188 + (13:31:45, 8 January 2025)
- ML17275B184 + (13:31:48, 8 January 2025)
- ML17275B183 + (13:31:49, 8 January 2025)
- L-81-211, Forwards Responses to QA Branch Questions Transmitted w/810615 Ltr.Responses Will Be Incorporated Into FSAR + (13:31:50, 8 January 2025)
- GO2-81-227, Advises That No Info in Emergency Plan Considered Proprietary or Private + (13:31:53, 8 January 2025)
- GO2-81-329, Responds to Re NRC Review of plant-unique Load Definition Methodologies.Util Does Not Anticipate Need to Assess Plant for Condensation Oscillation Load Definition. Detailed Rept Will Be Submitted Re Condensation Oscillation + (13:31:54, 8 January 2025)
- GO2-81-224, Forwards Revised Draft FSAR Pages for Solid Radwaste Sys. Pages Will Be Incorporated Into FSAR Amend 18,dtd Sept 1981 + (13:31:56, 8 January 2025)
- ML17275B177 + (13:31:58, 8 January 2025)
- ML17275B176 + (13:31:59, 8 January 2025)
- GO2-81-223, Requests Changes to Facility Distribution List.Revised List Encl + (13:32:00, 8 January 2025)
- ML17275B174 + (13:32:02, 8 January 2025)
- GO2-81-229, Forwards Responses to Geosciences Branch 810504 Second Round Questions.Responses Will Be Incorporated Into Fsar.Remainder of Responses Will Be Transmitted by 810930 + (13:32:03, 8 January 2025)
- GO2-81-226, Forwards Responses to Round 2 Questions.Remaining Responses Will Be Completed by 810904.Responses & Applicable FSAR Changes Will Be Incorporated Into Amend 19 of FSAR + (13:32:08, 8 January 2025)
- ML17275B171 + (13:32:09, 8 January 2025)
- ML17275B170 + (13:32:11, 8 January 2025)
- ML17275B167 + (13:32:11, 8 January 2025)