Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-81-533, Forwards Responses to Auxiliary Sys Branch Questions 010.043 & 010.054 & Instrumentation & Control Sys Branch Questions 031.117,031.118 & 031.128.Responses Will Be Incorporated Into FSAR Amend + (13:05:17, 8 January 2025)
- GO2-82-161, Submits Info Re Surveillance Criteria That Will Be Used in Maint Program to Test Second Level Undervolatge Protective Relays,In Response to 820208 Telcon.Table Re non-class IE Loads & Proposed FSAR Changes Encl + (13:05:20, 8 January 2025)
- ML17276B073 + (13:05:21, 8 January 2025)
- GO2-81-523, Forwards marked-up Revised Response to Question 311.1 in Siting Analysis Branch .Minor Revisions Made in Followup to 811020 Site Visit Will Be Incorporated in FSAR Amend + (13:05:22, 8 January 2025)
- ML17276B071 + (13:05:24, 8 January 2025)
- GO2-81-525, Forwards Responses to NRC 811112 Request for Addl Financial info,810927 & 1227 Quarterly repts,1981 Annual Rept & Official Statement.Response Will Be Incorporated Into FSAR Amend within 2 Months + (13:05:25, 8 January 2025)
- GO2-82-138, Submits Addl Info Re Suppression Pool Temp Transient Analysis.Reactor Decay Heat Would Be Transferred to Suppression Pool in Event of Single Failure + (13:05:27, 8 January 2025)
- GO2-82-151, Forwards marked-up Response to Draft SER Concerns & Branch Meeting Issues,As Result of Discussions W/Nrc Reviewers + (13:05:29, 8 January 2025)
- GO2-82-148, Submits Addl Info Re Containment Protective Coatings,Per Telcon Request + (13:05:31, 8 January 2025)
- ML17276B058 + (13:05:33, 8 January 2025)
- ML17276B056 + (13:05:34, 8 January 2025)
- GO2-82-128, Forwards Response to Draft SER Open Issues & Outstanding Open Branch Meeting Issues.Info Provided Re Internally Generated Missiles Outside & Inside Containment,Radwaste Bldg Analysis & Thermal Overload Test Program + (13:05:35, 8 January 2025)
- ML17276B054 + (13:05:37, 8 January 2025)
- ML17276B053 + (13:05:38, 8 January 2025)
- GO2-82-147, Submits Proposed Outline of Facility Fuel Rack Surveillance Program Per 820122 Telcon + (13:05:39, 8 January 2025)
- GO2-82-144, Forwards 820205 Transmittal Ltr to L Dallas & Nd Lewis & Certificate of Svc Re Amend 21 to FSAR + (13:05:40, 8 January 2025)
- GO2-82-129, Forwards Table & Sketches Providing Info Requested by NRC That Pool Temp Monitoring Sys Meets Requirements of NUREG-0487 Re Location of Temp Sensors & Electrical Div Redundancy + (13:05:42, 8 January 2025)
- GO2-82-121, Requests Relief from ASME Section XI Requirements Re Welds Found to Be Partially Inaccessible During First 90% of Preservice Insp Baseline.Remaining 10% of Baseline Exams Should Be Completed Before June 1982 + (13:05:44, 8 January 2025)
- GO2-82-120, Forwards marked-up Response to Containment Sys Branch Issue 47a-f, Acceptable SRV Design Load Spec from 810914-17 Meeting.Revised Page 5 to Response to Issue 48,submitted 820113,encl + (13:05:46, 8 January 2025)
- GO2-82-130, Forwards App a Draft Tech Specs,In Response to NRC Request + (13:05:47, 8 January 2025)
- GO2-82-125, Forwards Updated Response to Revised Sections of App B Per 820112-14 Meetings.Response to Be Incorporated in Amend 24 of FSAR + (13:05:49, 8 January 2025)
- ML17276B039 + (13:06:48, 8 January 2025)
- ML17276B037 + (13:06:49, 8 January 2025)
- GO2-82-119, Forwards Responses to Questions 371.019 & 371.020 from Hydrologic Engineering Branch Review for Incorporation in Amend 24 to FSAR + (13:06:50, 8 January 2025)
- GO2-82-117, Forwards Revised FSAR Pages Covering Miscellaneous Changes to Fuel Pool Cooling write-up,in Response to Open Item from Auxiliary Sys Branch 811007 Meeting.Pages Will Be Incorporated Into FSAR Amend 24 + (13:06:52, 8 January 2025)
- ML17276B032 + (13:06:54, 8 January 2025)
- ML17276B027 + (13:06:55, 8 January 2025)
- ML17276B023 + (13:06:56, 8 January 2025)
- ML17276B019 + (13:06:57, 8 January 2025)
- ML17276B013 + (13:06:59, 8 January 2025)
- ML17276B010 + (13:07:00, 8 January 2025)
- ML17276B009 + (13:07:01, 8 January 2025)
- GO2-82-116, Responds to 820126 & 25 Requests for Commitment to Close Out Open Fire Protection Issues.Fire Detection Circuits That Actuate Fire Suppression Sys in safety-related Areas Will Be Converted to Class a + (13:07:03, 8 January 2025)
- ML17276B005 + (13:07:05, 8 January 2025)
- ML17276B002 + (13:07:06, 8 January 2025)
- IR 05000397/1981022 + (13:07:12, 8 January 2025)
- ML17276A999 + (13:07:14, 8 January 2025)
- ML17276A998 + (13:07:15, 8 January 2025)
- ML17276A997 + (13:07:16, 8 January 2025)
- ML17276A994 + (13:07:17, 8 January 2025)
- ML17276A977 + (13:07:19, 8 January 2025)
- ML17276A975 + (13:07:21, 8 January 2025)
- ML17276A976 + (13:07:21, 8 January 2025)
- ML17276A972 + (13:07:22, 8 January 2025)
- ML17276A971 + (13:07:23, 8 January 2025)
- ML17276A968 + (13:07:24, 8 January 2025)
- ML17276A960 + (13:07:25, 8 January 2025)
- ML17276A958 + (13:07:25, 8 January 2025)
- ML17276A957 + (13:07:27, 8 January 2025)
- ML17276A956 + (13:07:28, 8 January 2025)
- ML17276A955 + (13:07:28, 8 January 2025)