Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-87-144, Provides Clarifications to 870327 Request for Tech Spec Changes Supporting Operation Following Spring 1987 Reload, Cycle 3 + (11:36:53, 8 January 2025)
- TAC:64217 + (11:36:55, 8 January 2025)
- ML17279A222 + (11:36:56, 8 January 2025)
- ML17279A220 + (11:36:57, 8 January 2025)
- 05000397/LER-1987-001, :on 870317,standby Gas Treatment Sys Fans 1A1 & 1A2 Inadvertently Started During Performance of Electrical Troubleshooting Activities.Caused by Personnel Error. Personnel Counseled + (11:36:58, 8 January 2025)
- GO2-87-136, Provides Util Position on Iodine plate-out Potential in post-LOCA Effluent Sampler,Per Insp Rept 50-397/85-20.Mods of Effluent Sample Line Will Be Deferred Until Study & Results of Iodine Sampling & Parameters Complete + (11:36:59, 8 January 2025)
- GO2-87-135, Advises That Util Satisfied Requirement of 10CFR50.56 by Designing TIP-V-15 to Be Installed Approx 3 Ft Outside Containment Penetration,Per 870401 Telcon.Installation Expected to Allow Sufficient Access for Testing & Maint + (11:37:00, 8 January 2025)
- GO2-87-131, Provides Info Requested by Jo Bradfute Re Implementation of Mods to Address 10CFR50.62 Requirements for ATWS Rule,Including Recirculation Pump Trip,Alternate Rod Insertion Sys Design & Standby Liquid Control Sys + (11:37:01, 8 January 2025)
- GO2-87-120, Requests one-time Exemption from App J Type C Leak Rate Test Schedule.Proposed Exemption within Intent of App J Does Not Pose Undue Risk to Public Health & Safety & Allows More Efficient Allocation of Resources + (11:37:03, 8 January 2025)
- ML17279A196 + (11:37:04, 8 January 2025)
- ML17279A195 + (11:37:05, 8 January 2025)
- ML17279A194 + (11:37:06, 8 January 2025)
- ML17279A193 + (11:37:06, 8 January 2025)
- ML17279A191 + (11:37:07, 8 January 2025)
- ML17279A192 + (11:37:07, 8 January 2025)
- ML17279A189 + (11:37:08, 8 January 2025)
- GO2-87-010, Requests Timely Review of 870330 Request for Deferral of Requirement to Install wide-range Neutron Monitoring Sys Until Third Refueling Outage.Application for Amend to License NPF-21,submitted on 861118,should Be Delayed + (11:37:09, 8 January 2025)
- ML17279A188 + (11:37:09, 8 January 2025)
- IR 05000397/1987007 + (11:37:12, 8 January 2025)
- ML17279A184 + (11:37:13, 8 January 2025)
- TAC:61850 + (11:37:14, 8 January 2025)
- ML17279A181 + (11:37:15, 8 January 2025)
- IR 05000397/1987005 + (11:37:19, 8 January 2025)
- TAC:61641 + (11:37:20, 8 January 2025)
- ML17279A178 + (11:37:20, 8 January 2025)
- ML17279A176 + (11:37:21, 8 January 2025)
- TAC:62045 + (11:37:22, 8 January 2025)
- ML17279A174 + (11:37:22, 8 January 2025)
- ML17279A172 + (11:37:23, 8 January 2025)
- ML17279A168 + (11:37:24, 8 January 2025)
- ML17279A167 + (11:37:25, 8 January 2025)
- ML17279A164 + (11:37:26, 8 January 2025)
- GO2-87-105, Application for Amend to License NPF-21,changing Tech Specs to Allow Use of Advanced Nuclear Fuels Corp,Inc Reload Fuel in Cycle 3.Fee Paid + (11:37:27, 8 January 2025)
- ML17279A162 + (11:37:27, 8 January 2025)
- ML17279A158 + (11:37:29, 8 January 2025)
- TAC:61116 + (11:37:30, 8 January 2025)
- ML17279A153 + (11:37:31, 8 January 2025)
- ML17279A146 + (11:37:32, 8 January 2025)
- ML17279A151 + (11:37:32, 8 January 2025)
- GO2-87-009, Application for Amend to License NPF-21,modifying Time Period When Reg Guide 1.97,Rev 2 Required to Be Implemented for Suppression Pool Level Monitoring from Prior to Startup Following Second Refueling Outage.Fee Paid + (11:37:33, 8 January 2025)
- ML17279A144 + (11:37:34, 8 January 2025)
- GO2-87-092, Requests That Tech Spec Limiting Condition for Operation 3.7.1.3 Be Changed to Read, UHS Consisting of Two Separate Spray Ponds W/Redundant Pumping & Spray Facilities Shall Be Operable W/: for Clarification + (11:37:35, 8 January 2025)
- GO2-87-080, Application to Amend License NPF-21,deleting License Condition 2.C.(16),Attachment 2,Item 3(b) Requiring Implementation of Reg Guide 1.97,Rev 2 for Flux Monitoring Prior to Startup Following Second Refueling.Fee Paid + (11:37:36, 8 January 2025)
- ML17279A134 + (11:37:38, 8 January 2025)
- GO2-87-079, Application to Amend License NPF-21,revising Tech Spec Table 3.3.7.1-1, Radiation Monitoring Instrumentation Re New Fuel Vault Criticality Monitor Alarm Setpoint Value.Fee Paid + (11:37:39, 8 January 2025)
- GO2-87-091, Clarifies 870303 Request for Amend to Tech Spec 3/4.1.5, Figures 3.1.5-1 & 3.1.5-2 Re Standby Liquid Control (SLC) Sys.Acceptance Testing to Demonstrate Capability of SLC Sys Will Be Performed W/Both SLC Pumps Operating Simultaneously + (11:37:40, 8 January 2025)
- L-PI-17-041, Enclosure 6 to L-PI-17-041, Westinghouse Affidavits + (11:37:42, 8 January 2025)
- ML17279A125 + (11:37:43, 8 January 2025)
- GO2-87-007, Advises That Util Will Commit to Performing 10CFR50,App J Type B & C Leak Rate Testing in Accordance w/860131,870109 & 0211 Requests for Exemption/Tech Spec Change + (11:37:45, 8 January 2025)
- ML17279A124 + (11:37:45, 8 January 2025)
- ML17279A121 + (11:37:47, 8 January 2025)
- ML17279A120 + (11:37:48, 8 January 2025)