Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17283A076 + (11:14:42, 8 January 2025)
- ML17283A074 + (11:14:42, 8 January 2025)
- ML17283A084 + (11:14:42, 8 January 2025)
- ML17283A040 + (11:14:43, 8 January 2025)
- ML17283A041 + (11:14:43, 8 January 2025)
- ML17282A028 + (11:14:44, 8 January 2025)
- ML17282A030 + (11:14:44, 8 January 2025)
- ML17282A026 + (11:14:45, 8 January 2025)
- ML17282A027 + (11:14:45, 8 January 2025)
- RA-17-0043, Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-3009, Revision 0 + (11:14:46, 8 January 2025)
- 05000387/LER-1917-007, Regarding Secondary Containment Declared Inoperable Due to Supply Air Flow + (11:14:49, 8 January 2025)
- IR 05000313/2017012 + (11:15:20, 8 January 2025)
- NRC-17-0069, Notice of Organization Change - Senior Vice President and Chief Nuclear Officer + (11:15:20, 8 January 2025)
- 05000341/LER-1917-004, Regarding Inadequate Procedural Guidance for Residual Heat Removal Complex Ventilation Systems Leads to Condition Prohibited by Technical Specifications and Loss of Safety Function + (11:15:23, 8 January 2025)
- BYRON 2017-0098, Cycle 21 Core Operating Limits Report + (11:15:23, 8 January 2025)
- 05000400/LER-1988-006, :on 880208,emergency Svc Water Sys Declared Inoperable.Caused by Isolation Valve Failures.Valves Repaired & Retested.On 880212,after Concern Raised,Manual Valve Closed,Pending Permanent Design Change + (11:15:25, 8 January 2025)
- ML17279B204 + (11:15:27, 8 January 2025)
- ML17279B202 + (11:15:28, 8 January 2025)
- ML17279B200 + (11:15:29, 8 January 2025)
- ML17279B201 + (11:15:29, 8 January 2025)
- ML17279B198 + (11:15:30, 8 January 2025)
- ML17279B197 + (11:15:30, 8 January 2025)
- B12671, Provides Results of Evaluation & Status of Implementation Plan Re Kaman Monitors,Per Insp Rept.Util Has Determined Not to Install Second Kaman Monitor Nor Relocate First Monitor Since Commitment to Install Second Not Necessary + (11:15:31, 8 January 2025)
- ML17279B196 + (11:15:31, 8 January 2025)
- ML17279B195 + (11:15:31, 8 January 2025)
- 05000400/LER-1987-032, :on 870602,radiation Monitor REM-21WL-3541 Sample Chamber Instead of REM-21WS-354 Drained for Disconnection Leaving Monitor Inoperable.Caused by Personnel Error.Procedure HPP-495 Prepared + (11:15:34, 8 January 2025)
- EPID:L-2017-EPR-0001 + (11:15:36, 8 January 2025)
- ML17279B177 + (11:15:36, 8 January 2025)
- SECY-18-0015, Enclosure 3 - Outreach and Summary of Public Comments + (11:15:37, 8 January 2025)
- ML17279B145 + (11:15:37, 8 January 2025)
- ML17279B124 + (11:15:40, 8 January 2025)
- ML17279B122 + (11:15:41, 8 January 2025)
- ML17279B121 + (11:15:42, 8 January 2025)
- ML17279B119 + (11:15:43, 8 January 2025)
- 05000397/LER-1988-016, :on 880518,reactor Protection Sys Actuation Ocurred.Caused by Error in Plant Design.Event Discussed in Mechanics Shop Meeting & Article Describing Event to Be Included in Prefuelling Outage Bulletin + (11:15:44, 8 January 2025)
- 05000397/LER-1988-015, :on 880515,loss of Power to Reactor Protection Sys (RPS) Ocurred Due to Flooding of Reactor Cavity.Caused by Inadvertent Removal of Power to MC-7A.RPS Switched to Alternate Power Supply & RHR Cooling Restored + (11:15:45, 8 January 2025)
- ML17279B115 + (11:15:47, 8 January 2025)
- ML17279B113 + (11:15:48, 8 January 2025)
- IR 05000397/1988018 + (11:15:49, 8 January 2025)
- ML17279B110 + (11:15:50, 8 January 2025)
- 05000397/LER-1988-013-01, :on 880512 & 13,loss of Power Occurred on Reactor Protection Sys (Rps).Caused by phase-to-ground Faults Due to Lightning.Rps Alternate Supply Electrical Protection Assembly Breaker & Logic Reset + (11:15:51, 8 January 2025)
- ML17279B100 + (11:15:52, 8 January 2025)
- ML17279B099 + (11:15:53, 8 January 2025)
- 05000397/LER-1988-012, :on 880606,potential Existence of Unmonitored Radiological Effluent Release Path During Certain Emergency Conditions Determined.Cause Unknown.Fan Disabled.Part 21 Related + (11:15:54, 8 January 2025)
- ML17279B096 + (11:15:55, 8 January 2025)
- GO2-88-136, Informs That Calculation Analyzing Structural Integrity of Specific Support Steel Configurations for Instrument Sensing Lines Rescheduled for Completion from 880515 to 880715 Due to Unavailability of Supporting Resources + (11:15:56, 8 January 2025)
- GO2-88-131, Responds to NRC 880527 Request for Addl Info Re Violations Noted in Insp Rept 50-397/88-02.Details of Overall Assessment of Plant Quality & Program Changes to Improve Quality of Design Mods Will Be Provided at 880607 Meeting + (11:15:57, 8 January 2025)
- 05000397/LER-1988-011-02, :on 880501,reactor Protection Sys Actuation Occurred as Result of Reactor Pressure Vessel Low Water of +13 Inches.Caused by Personnel Error & Inadequate Design. Individual Involved Counseled + (11:15:59, 8 January 2025)
- 05000397/LER-1988-010, :on 880430,nuclear Steam Supply Shutoff Sys Group 1 Isolation Occurred.Caused by Low Pressure in Main Steamlines W/Reactor Mode Switch in Run Position.Valve RFW-FCV-10B Repaired + (11:16:00, 8 January 2025)
- IR 05000397/1988006 + (11:16:02, 8 January 2025)
- ML17279B079 + (11:16:04, 8 January 2025)
- ML17279B082 + (11:16:04, 8 January 2025)