List of results
- ML17284A504 + (11:10:30, 8 January 2025)
- ML17284A502 + (11:10:31, 8 January 2025)
- GO2-88-188, Forwards Request for Relief ISI-2-008 Re ASME Section III Code 3 Svc Water Buried Piping.Code Acceptability & Sys Function,Based on More Frequent Testing,Will Not Decrease Plant Quality or Safety + (11:10:32, 8 January 2025)
- 05000397/LER-1988-019, :on 880527,determined That Control Room Emergency Filtration Sys Actuation Occurred on 880520.Caused by Technician Failure to Reset Trip Logic During Response Time Test Due to Inadequate Procedure + (11:10:36, 8 January 2025)
- 05000397/LER-1988-027, :on 880728,reactor Water Cleanup Sys (RWCU) Isolated on High Differential Flow During Preparations to Place RWCU Recirculation Pump in Svc.Caused by Personnel Error.Personnel Counseled Re Incident + (11:10:39, 8 January 2025)
- 05000397/LER-1988-006, :on 880213,series of Reactor Pressure Vessel Level Transients Resulted in Low Reactor Protective Sys Actuation Following Manual Scram.Caused by Procedural Inadequacy.Procedures Modified + (11:10:43, 8 January 2025)
- GO2-88-189, Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Review of All Sys Interacting &/Or Connected to RCS Confirmed That Sys Not Susceptible to Conditions of Thermal Cycling or Temp Stratification + (11:10:44, 8 January 2025)
- ML17284A495 + (11:10:45, 8 January 2025)
- GO2-88-186, Forwards Revised Page 6 to Semiannual Effluent Rept,Jan- June 1988 + (11:10:46, 8 January 2025)
- GO2-88-183, Submits Status Rept on Remaining Three Tasks Identified in Fire Protection Program Reevaluation,Including Justifications for Deviation from Nfpa,Correct Thermo Lag Configurations & Updating FSAR + (11:10:49, 8 January 2025)
- ML17284A491 + (11:10:51, 8 January 2025)
- ML17284A489 + (11:10:53, 8 January 2025)
- ML17284A488 + (11:10:53, 8 January 2025)
- ML17284A485 + (11:10:56, 8 January 2025)
- 05000397/LER-1988-026, :on 880715,determined That Sensing Line Support Hangers Would Not Withstand Design Basis Fire W/O Mod or Protection.Caused by Inadequate Design by Architect Engineer.Areas Placed on Hourly Fire Tour + (11:10:57, 8 January 2025)
- GO2-88-177, Washington Nuclear Project-2 Semiannual Effluent Rept Jan- June 1988 + (11:10:58, 8 January 2025)
- ML17284A482 + (11:11:00, 8 January 2025)
- ML17284A481 + (11:11:02, 8 January 2025)
- ML17284A479 + (11:11:03, 8 January 2025)
- 05000397/LER-1988-025, :on 880708,discovered Instrumentation Channel Inoperable Due to Incorrect Wiring & Personnel Error.Caused by Failure of Shiftly Channel Check to Promptly Determine Inoperable Status of Channel + (11:11:05, 8 January 2025)
- IR 05000397/1988016 + (11:11:37, 8 January 2025)
- ML17284A475 + (11:11:39, 8 January 2025)
- ML17284A474 + (11:11:40, 8 January 2025)
- ML17284A473 + (11:11:41, 8 January 2025)
- IR 05000397/1988008 + (11:12:00, 8 January 2025)
- ML17284A469 + (11:12:02, 8 January 2025)
- GO2-88-156, Provides Schedule for Completion of Fire Protection Issues from Insp Rept 50-397/88-16.Installation of Scuppers on South Doors Leading Outside Diesel Generator Bldg Will Be Completed by 880801 + (11:12:05, 8 January 2025)
- ML17284A465 + (11:12:09, 8 January 2025)
- TAC:68897 + (11:12:09, 8 January 2025)
- GO2-88-161, Application for Amend to License NPF-21,changing Tech Spec Table 3.3.7.5-1 Re Accident Monitoring Instrumentation Under Emergency Conditions.Fee Paid + (11:12:10, 8 January 2025)
- GO2-88-157, Forwards Completed Executive Summary of App R High Impedance Fault Analysis,Per NRC 880606 Request + (11:12:13, 8 January 2025)
- ML17284A461 + (11:12:17, 8 January 2025)
- ML17284A458 + (11:12:18, 8 January 2025)
- IR 05000193/2017202 + (11:12:24, 8 January 2025)
- ML17284A454 + (11:12:25, 8 January 2025)
- CNL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) + (11:12:26, 8 January 2025)
- GO2-88-164, Responds to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, Dtd 880125.Util Will Comply W/Staff Positions Delineated in Generic Ltr to Extent Described in Response + (11:12:27, 8 January 2025)
- GO2-88-167, Provides Rept Re Actions Taken Between Nov 1987 & June 1988 to Ensure That Installation of Qualified Monitor Be Completed at Earliest Possible Date.Next Required Quarterly Rept Shall Be Submitted by 881007 + (11:12:30, 8 January 2025)
- GO2-88-170, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-22.Corrective Action:Door Allowing Access to Area Closed & Locked Immediately After Determining That Tech Spec 6.12.2 Incorrect & Individual Involved Counseled + (11:12:32, 8 January 2025)
- GO2-88-168, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-19.Corrective Actions:Instrument Rack Termination Procedure PPM 10.25.19 Will Be Revised by 890315 to Include Examples of Acceptable Crimp Configuration + (11:12:33, 8 January 2025)
- GO2-88-163, Submits Clarification of Approved Fire Protection Program Per 880610 Exit Meeting,Covering Plant Design,Door Openings, Fire Barriers,Fire Dampers & Doors & Safe Shutdown Capability + (11:12:36, 8 January 2025)
- GO2-88-160, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-20.Corrective Actions:Addl Six Valve Motor Operator Torque Switches Replaced & Plant Problems Procedure PPM 1.3.12 Revised + (11:12:40, 8 January 2025)
- GO2-88-162, Forwards List of Suppliers & Mfg That safety-related & nonsafety-related Fasteners Purchased,Clarification of Info on Fasteners & Bolting Matl Specs,In Response to NRC Bulletin 87-002,Suppls 1 & 2 + (11:12:43, 8 January 2025)
- GO2-88-159, Describes Actions Taken by Supply Sys to Ensure Effective Level of Personnel Safety During Performance of Maint Activities,In Response to Concern Noted in Mgt Meeting Insp Rept 50-397/88-23 + (11:12:45, 8 January 2025)
- GO2-88-153, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Results of Reinsp of Nine Breakers After Removal of Spring Provided + (11:12:46, 8 January 2025)
- GO2-88-155, Forwards Calculation Analyzing Structural Integrity of Specific Support Steel Configurations for Instrument Sensing Lines Re Fire Protection & Safe Shutdown Capability Response to SER + (11:12:48, 8 January 2025)
- ML17284A440 + (11:12:48, 8 January 2025)
- GO2-88-154, Responds to IE Bulletin 88-003, Inadequate Latch Engagement in Hfa Type Relays Mfg by Ge. Hfa Type Relays Not Utilized in Class 1E safety-related Applications at Plant + (11:12:51, 8 January 2025)
- 05000397/LER-1988-022, :on 880616,violation of Fire Zone in Radwaste Bldg Cable Spreading Room.Caused by Missing thermo-lag Insulation Due to Personnel Error.Outline of 20 Ft non- Combustible Zone Will Be Taped on Floor + (11:12:53, 8 January 2025)
- ML17284A434 + (11:12:54, 8 January 2025)
- GO2-88-150, Responds to IE Bulletin 88-004 Re Potential safety-related Pump Loss.Facility Has No safety-related Pumps W/Detrimental pump-to-pump Interaction.Min Flow Line Adequate as Addressed in Encl Rept + (11:12:55, 8 January 2025)