Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000397/LER-1992-006, :on 920220,reactor Bldg to Suppression Chamber Vacuum Breaker Setpoints Were Incorrectly Set.Caused by Analysis Deficiency.Setpoint Documentation Changed & Procedures Deviated & Setpoints Reset + (10:29:43, 8 January 2025)
- ML17289A407 + (10:29:46, 8 January 2025)
- ML17289A408 + (10:29:46, 8 January 2025)
- GO2-92-064, Application for Amend to License NPF-21,revising TS 4.6.6.1.b.3 Re Primary Containment Atmosphere Control + (10:29:47, 8 January 2025)
- ML17289A405 + (10:29:47, 8 January 2025)
- GO2-92-058, Monthly Operating Rept for Feb 1992 for WPPS-2 + (10:29:53, 8 January 2025)
- ML17289A402 + (10:29:53, 8 January 2025)
- ML17289A395 + (10:29:58, 8 January 2025)
- ML17289A396 + (10:29:58, 8 January 2025)
- ML17289A394 + (10:29:59, 8 January 2025)
- ML17289A393 + (10:29:59, 8 January 2025)
- GO2-92-061, Requests Relief from Tech Specs 4.6.6.1.b.3, Containment Atmosphere Control & Provides Appropriate Acceptance Criterion + (10:30:00, 8 January 2025)
- ML17289A391 + (10:30:00, 8 January 2025)
- ML17289A389 + (10:30:04, 8 January 2025)
- IR 05000397/1992007 + (10:30:05, 8 January 2025)
- ML17289A386 + (10:30:07, 8 January 2025)
- ML17289A384 + (10:30:08, 8 January 2025)
- GO2-92-062, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-42 on 911104 to 1206.Corrective Actions:Personnel Being Trained in Preparation & Review of 10CFR50.59 Reviews & Safety Evaluations + (10:30:09, 8 January 2025)
- TAC:M82488 + (10:30:12, 8 January 2025)
- ML17289A381 + (10:30:13, 8 January 2025)
- GO2-92-056, Responds to NRC Re Violations & Proposed Imposition of Civil Penalty Noted in Insp Rept 50-397/91-44 on 911104-1208.Corrective Actions:Plant Sys Operating Procedures PPM 2.3.3A/B Revised + (10:30:14, 8 January 2025)
- ML17289A379 + (10:30:16, 8 January 2025)
- GO2-92-054, Washington Nuclear Power Plant Unit 2 Annual Operating Rept + (10:30:17, 8 January 2025)
- 05000397/LER-1992-004, :on 920227,noted Scram Discharge Vol Level Switches Not Tested Post Scram as Required.Caused by Testing Not Being Performed.Corrective Actions Were Not Required + (10:30:24, 8 January 2025)
- GO2-92-053, Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991 + (10:30:25, 8 January 2025)
- GO2-92-051, Advises That All Elements of Reg Guide 5.66 Implemented to Satisfy Requirements of 10CFR73.56 Re Personnel Access Authorization for Nuclear Power Plants + (10:30:28, 8 January 2025)
- ML17289A370 + (10:30:33, 8 January 2025)
- ML17289A371 + (10:30:33, 8 January 2025)
- ML17289A368 + (10:30:34, 8 January 2025)
- GO2-92-050, Responds Further to 10CFR50,Appendix E,Section VI.4.a. on Requirement to Submit Emergency Response Data Sys Plan by 911028.Util Will Use Plant Prime Computer W/New Software to Assure Compliance & 60 Min Response Per 10CFR50.72(a)(4) + (10:30:35, 8 January 2025)
- GO2-92-036, Provides Clarification of Duties of Third Staff Reactor Operator During Normal & Emergency Plant Operations + (10:30:38, 8 January 2025)
- GO2-92-043, Submits Licensee Recommendation That Crew a Participate in NRC Administered Readiness for Operation Evaluation on 920227 + (10:30:40, 8 January 2025)
- ML17289A364 + (10:30:41, 8 January 2025)
- GO2-92-049, Application for Amend to License NPF-21 for Use of Cycle 8 Reload Core,Unit 2 W/Changes to TS 2.1.2, B 2.0 & 6.9.3.2. Proposed Changes Do Not Involve Significant Hazard or Increase in Accident Probability/Consequences + (10:30:42, 8 January 2025)
- IR 05000397/1991041 + (10:30:44, 8 January 2025)
- IR 05000397/1991031 + (10:30:45, 8 January 2025)
- GO2-92-028, Forwards Results of Plant Analysis of EDR-TK-4A Split Sample Collected in Conjunction W/Ref NRC Insp Rept 50-397/91-40 + (10:30:46, 8 January 2025)
- ML17289A357 + (10:30:49, 8 January 2025)
- GO2-92-048, Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow & Effect on Cycle 8 Operation + (10:30:50, 8 January 2025)
- GO2-92-055, Forwards Fitness for Duty Program Performance Data for Jul- Dec 1991 + (10:30:51, 8 January 2025)
- GO2-92-047, Annual Personnel Monitoring Rept for 1991 + (10:30:55, 8 January 2025)
- ML17289A353 + (10:30:59, 8 January 2025)
- 05000397/LER-1992-003, :on 920123,circulating Fan CAC FN-1B Failed to Start During Performance of Surveillance Test.Caused by Tripped Overloads.Thermal Overloads Reset & Surveillance Test Performed + (10:31:00, 8 January 2025)
- ML17289A351 + (10:31:01, 8 January 2025)
- IR 05000397/1991044 + (10:31:02, 8 January 2025)
- IR 05000397/1991043 + (10:31:14, 8 January 2025)
- GO2-92-045, Forwards Results of Periodic Rotor Pole Ac Voltage Drop Tests Completed Through First Quarter 1992.No Trend Towards Degrading Condition within Rotor Poles.Based on Results to Date,Licensee Plans Annual Test Frequency During Outage + (10:31:15, 8 January 2025)
- ML17289A346 + (10:31:15, 8 January 2025)
- GO2-92-046, Application for Amend to License NPF-21 TS 3/4.4.2 & 3/4/3/7/5 Recognizing Redundancy in SRV Position Indication. Direct Reading SRV Stem Position Indicator to Be Installed in Outage in Addition to Accoustic Monitoring Indication + (10:31:17, 8 January 2025)
- ML17289A344 + (10:31:17, 8 January 2025)
- ML17289A341 + (10:31:19, 8 January 2025)
- ML17289A339 + (10:31:20, 8 January 2025)