Ack Reciept of 911121 Response Re Insp Rept 50-397/91-27 Concerning Emergency Operating Procedure Development.From Review of Document,Nrc Determined That Supply Sys Addressed pre-restart Commitments on Operator Training
ML17289A402
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/17/1992
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9203250060
Download: ML17289A402 (5)


See also: IR 05000397/1991027

Text

~pa Stay

0

UNITED STATES

NUCLEAR REGULATORY COMMISSION

ItMIONV

14$ MARIALANE. SUITE 210

WALNUTCREEK, CALIFORNIASI680-5368

@pe f 7 1892

Docket No. 50-397

Mashington Public Power Supply System

P. 0.

Box 968

3000 George Mashington

May

Richland,

Mashington

99352

Attention:

Hr. G.

C. Sorensen,

Manager

Regulatory

Programs

SUBJECT:

MNP-2 RESPONSE

TO NRC

INSPECTION

REPORT

NO. 91-27

Thank you for your response,

dated

November 21,

1991, to our Inspection

Report

50-397/91-27,

concerning

emergency

operating

procedure

(EOP) development.

From our review of this document,

and our subsequent

February 24-27,

1992

followup inspection

(50-397/92-04) of your corrective action plan,

we have

determined that the Supply System

has adequately

addressed

the pre-restart

commitments regarding operator training and ability to use the

EOPs.

However, the issues

involving the more generic design,

implementation,

and

strategy

EOP deviations,

are still being evaluated

by NRR.

'Therefore,

we are particularly interested

in the progress of your long term

EOP upgrade

program,

as discussed

in your response.

Please

keep

us appraised

of the results of these efforts.

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

Dennis

F.

irsch, Chief

Reactor Safety Branch

9203250060

920327

PDR

ADOCN 05000397

8

PDR

0

~jl

i

j

CC:

J.

W. Baker,

WNP-2 Plant Manager

A.

G. Hosier,

WNP-2 Licensing Manager

L.

L. Grumme, Acting Director, Assurance

8 Licensing

G.

E.

Doupe,

Esq.,

WPPSS

D.

W. Mazur, Managing Director

A.

Lee Oxsen,

Deputy Managing Director

J.

V. Parrish,

Assistant

Managing Director for Operations

C.

Powers, Director of Engineering

B. Barmettlor,

Licensed Training Manager

State of WA

b-: ~/o g~JW

J. Hartin,

RV'.

Faulkenberry,

RV

R. Zimmerman,

RV

K. Perkins,

RV

D. Kirsch,

RV

L. Hiller, RV

P. Johnson,

RV

T. Headows,

RV

R. Cross,

RV (two copies)

C. Sorensen,

SRI

B. Dean, Project Hanager,

NRR/PD5

B. Gallo,

NRR/LOLB

Resident Inspectoi

Prpgept Ipspe tor

b<<: e((ap~ DF LWdtQ ]]h] Ctj:

DCS

Docket file

CONCURRENCES:

RO

S

COPY

]

R

SYCCOPC

]

R

S

[

ES

NO

ES

NO

0

THEADOWS<

LHILLE

3/r~/92

3/

/92

DKIRSCH

3/

/92

~

~

4