ML17289A386

From kanterella
Jump to navigation Jump to search
Forwards SALP Mgt Meeting Rept 50-397/92-07 Conducted on 920220
ML17289A386
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/03/1992
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17289A387 List:
References
NUDOCS 9203230116
Download: ML17289A386 (5)


See also: IR 05000397/1992007

Text

~$ IIEOci,tp

e~

0

Cy

n

C

O

,

.cCc

C

c

0

o

+n +a*++

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREE K, CAUFORNIA94596-5368

MAR - 3 1SRi?

Docket No.

50-397

Washington Public Power Supply System

P. 0. 8ox 968

Richland,

Washington

99352

Attention:

Mr. D.

W. Mazur

Managing Director

Gentlemen:

Subject:

Systematic

Assessment

of Licensee

Performance

(SALP) Management

Meeting of February

20,

1992

This refers -to the open management

meeting held on February

20,

1992 at the

Supply System Headquarters

offices, during which we discussed

the

SALP assess-

ment for WNP-2 for the period September

1,

1990 through

December

31,

1991.

The subjects

discussed

during the meeting are described

in the enclosed

~

~

~

~

~

~

~

~

~

Meeting Report No. 50-397/92-07.

A copy of the agenda for the meeting

i's also

enclosed.

The Initial SALP Report which we reviewed during our February 20'meeting

was

transmitted to you by our letter dated

February ll, 1992.

The Final

SALP

Report will be issued following our review of your response

to the initial

report.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in'he

NRC Public Document

Room.

Should you have

any questions

concerning this meeting report,

we will be

pleased

to discuss

them with you.

Sincerely,

3/p

R.

P.

mmerman,

Director

Div

'on of Reactor Safety

and Projects

Enclosure:

l.

Agenda for SALP Management

Meeting

2.

Meeting Report No. 50-397/92-07

9'20323011b

920303

PDR

ADOCK 05000397

8

PDR

("L

A g~ (> ',

~.VU U~> g

cc:

A. L. Oxsen,

Deputy Managing Director

J.

V. Parrish,

Assistant

Managing Director for Operations

L. L. Grumme, Acting Director, Assur ance

E Licensing

J.

W. Baker, WNP-2'lant Manager

G.

C. Sorensen,

Hanager,

Regulatory

Programs

G.

E. Doupe,

Esq.,

WPPSS

M. H. Philips, Esq.,

Winston 5 Strawn

State of Washington

-3-

bcc w/copy of enclosures

I and 2:

Docket File

Project Inspector

Resident

Inspector

J. Martin

B. Faulkenberry

B. Boger,

NRR

T. quay,

NRR

G. Yuhas

R. Huey

P. Johnson

G. Cook

bcc w/o enclosures:

M. Smith

J. Bianchi

J. Zollicoffer

REGIO

V

o

s

n

2/$g

2

SRi chards

3/g./92

GYuhas

3Q /92

.ac~

RZimmerman

3/3 /92

0

YES

NO

CO

ES

NO

ES

NO

YES

NO

ES

NO

bcc w/enclosure:

H. Cal'loway,

SCE,

Manager,

Access Authorization

J. Martin,

RV

B. Faukenberry,

RV

H. Blume,

RV

R. Zimmerman,

RV

R. Huey,

RV

K. Perkins,

RV

S. Richards,

RV

D. Kirsch,

RV

L. Hiller,

RV

P. Johnson,

RV

T. Headows,

RV

R. Gallo,

NRR/LOLB

T. quay,

NRR/PD5

C. Caldwell,

SONGS,

SRI

G. Kalman,

NRR,

PD5

L. Bush,

NRR/RSGB

W. McNulty, OI-RV

J.

Lieberman,

OE

J.

Goldberg,

OGC

SALP MANAGEMENT MEETING

WASHINGTON PUBLIC POWER SUPPLY

SYSTEM

Washington Nuclear Project No.

2 (WNP-2)

January

20,

1992

~AGGMD

l.

Opening

Remarks,

Purpose of Meeting -- B. H. Faulkenberry,

Deputy

Regional Administrator,

and

D.

W. Mazur, Managing Dire'ctor, Supply System

2.

Review of NRC Systematic

Assessment

of Licensee

Performance

(SALP)--

September

1,

1990 - December

31,

1991

P.

H. Johnson,

Chief, Reactor Projects

Section

3

Plant Operations

Maintenance/Surveillance

Engineering/Technical

Support

G.

P.

Yuhas, Chief, Reactor Radiological Protection

Branch

Radiological Controls

Emergency

Preparedness

Security

R.

P.

Zimmerman, Director, Division of Reactor Safety .and Projects

Safety Assessment/guality

-Verification

B. H. Faulkenberry,

Deputy Regional Administrator

Summation

3.

Comments

by Supply System'

4.

Closing

Remarks